Alvin Herrera
Houston, Texas ***72
(Cell) 832-***-****
**************@*****.***
Summary
Creative professional with a wide spread of project experience from ideas to development. Talents include design/edit of Production Materials using SolidWorks, read Bill of Materials, understand 2D and 3D drawings/design, maintain MES Database, program/troubleshoot MS Access Database using VBA & Macros, and able to multi-task with high pressure project deadlines.
Highlights
• SolidWorks 2007, SolidWorks 2011, SolidWorks 2012
• PCs and software competency
• Quick learner
• Proficient with MS Access, MS Excel, MS Power Point
• High Temp Soldering
• Strategic prioritization
• Work well in diverse team environment
• Written and verbal communication skills
• SAP
• Custom Fabrication of Fixtures, Cables
• Complex problem solving
• Component functions/testing requirements
Experience
Applied Optoelectronics Inc.
Sugarland, TX
Research and Development Technician
2008-Present
• Modify mechanical drawing request.
• Create new drawing designs for fixtures and production materials.
• Maintain parts and fixtures mechanical drawing website.
• Repair testing station custom cables and fixtures.
• Assemble/Repair transceivers and transmitters.
• Install firmware onto PCB board for transceivers and transmitters.
• Assemble semi-conductor laser diode devices.
• Handle fiber patch-cords inventory for Production Line.
• Troubleshoot workstations.
• Manage Part Number System (SAP System/MES System)
• Maintain/Debug/Create MS Access databases.
•
Production Line Supervisor
2006-2008
• Responsible for managing 12-13 testing operators.
• Arranged workload for the Manufacturing Line.
• Checked test data after operators finished testing.
• Minimal MS Access Database skills.
• Held weekly meetings on team’s progress.
• Minimal troubleshooting on work stations.
• Made sure all production orders met deadline
•
Production Line Testing Operator
2004-2006
• Tested Laser Diodes in a fast and efficient manner.
• Used Photo diode detector and Spectrum Analyzer to test LIV Curve.
• Great team player with other operators.
• Kept a clean workstation at the end of each work day.
Education
Houston Community College
2004-2008
Prerequisites
Alief Hastings High School
1999-2003
High School Diploma
REFERENCE UPON REQUEST