Post Job Free

Resume

Sign in

B.E. Mechanical/ 15 years Experience/ maintenance, Engg. operations

Location:
Jamshedpur, JH, 831005, India
Salary:
10,000 USD
Posted:
March 01, 2009

Contact this candidate

Resume:

SANJEEV PRASAD

*th Floor, Alkuwairi Building, 19 Al-Sadd St., P.O. Box No.-39458, Doha, Qatar

Aims to pursue challenging managerial assignments in Maintenance/Engineering Operations with a reputed organization.

PRÉCIS

 Nearly 14 years of rich experience in Maintenance Operations, Quality Control, Project Planning Management, Production Operations and Process Enhancements. Presently designated as a Maintenance Manager with Operators Qatar LLC. at Doha, Qatar.

 Significant experience & expertise in planning & execution of projects, business process re engineering, maintenance of machinery and maintenance of building.

 Proficiency in designing maintenance strategies, procedures and methods; diagnosing breakdown problems; monitoring and controlling maintenance costs.

 Hands on experience in achieving high productivity with management of men, material & machine.

 Well versed with ISO, TPM, Kaizen, HACCP and GMP.

 A team player and leader, with exemplary interpersonal, analytical and problem solving skills.

AREAS OF EXPERTISE

Project Planning & Management

 Projects expansion, modernization, installation & commissioning of equipment / systems.

 Managing activities right from the conceptualization stage to the execution; involving finalization of technical specifications, procurement, scheduling, progress monitoring, erection, testing & commissioning, site management and manpower Planning.

 Assisting in minimizing bottlenecks for productivity with optimization of men, material & machine to attain the production target.

 Ensuring execution of activities / projects within time & budgetary parameters.

Maintenance Operations

 Planning and effecting preventive maintenance schedules to increase machine up time / equipment reliability; thereby accomplishing planned production targets within budget.

 Handling the implementation of Total Productive Maintenance to reduce the machineries down time and increase the productivity through improvement of machineries and planned maintenance.

 Directing & instructing maintenance team; monitoring expenses with optimum utilization of resources.

 Preparing and implementing standard operating procedure and preventive maintenance schedule for equipments.

Commercial Operations/ Quality Assurance/ Safety Operations

 Monitoring implementation & documentation of quality systems like ISO, Kaizen, HACCP as per the set standards.

 Identifying assignable and chronic causes by the use of latest analysis techniques.

 Reviewing the operational practices, identifying the areas of obstruction/ quality failures and advising on system and process changes for qualitative improvement and energy conservation.

 Handling activities pertaining to change management to ensure seamless operations.

 Synchronizing and interacting with statutory bodies and departments like Pollution control board, Electricity board, Factory Inspector etc. on regular basis for obtaining the required licenses.

Process Enhancements

 Initiating VA/ VE activities for bringing in cost reductions in the process.

 Working on initiatives for energy conservation, entailing identification of opportunities, conduction of tests, cost benefit analysis and implementation for the spinning department.

 Analyzing the operational & performance qualification of equipment and process validation of products to ensure they are as per the quality norms.

TECHNICAL PURVIEW

 Hands on experience in maintaining and repairing of following machineries.

- Chilling plant - Cooling tower, Boiler (Oil Fired)

- Pneumatic controlled machines - High speed Mixers

- Air Compressors - Air dryer

- Hydraulic controlled machines - Oven (oil fired)

- Packaging machine - Ink jet printers

- Generators - Hoist

- Pumps - Motors

- Elevators - Conveyors

- HVAC system - Fire sprinklers

EMPLOYMENT HISTORY & FORTE’

Since Dec’07 Operators Qatar LLC , Doha, Qatar as a Maintenance Manager

Associated as:

o In-charge of Building maintenance of Qatar Financial Centre a Hi tech multi-storey building,

Equipped with Building Management system, HVAC system, Generators, Central Battery system,

Fire Sprinkler System, Access control system, Fire pumps, Fire diesel engine, Elevators etc.

o Head of maintenance operation

o Facility Management

o Safety Operations

Achievement : Certificate of appreciation for outstanding performance from Qatar

Financial centre

PREVIOUS ASSIGNMENTS

Mar’97- Nov’07 Hindustan Unilever Limited as an Asst. Manager – Engineering services Chennai, India

Significant Deliverables

 Associated as:

o In-charge of maintenance of processing plant, Building maintenance and SHE.

o Head of TPM Pillars Planned maintenance and SHE.

 Handled the successful implementation of:

o Total productive maintenance.

o Energy optimisation project

Contributed significantly in improving the productivity drive by 6% additional machineries time.

 Played a pivotal role in:

o Unilever’s food quality audit.

o Unilever’s safety audit.

Jul’96-Feb’97 Saurat Auto Tech Pvt. Ltd, Jamshedpur, India as an Engineer -Quality Control

An ancillary of Tata Motors

Aug’94-Jun’96 Sigma Engineering, Jamshedpur, India as an Engineer – Production

An Ancillary of Tata Motors

ACADEMIA: B.E. in Mechanical Engineering from Regional Engineering College / NIT, Jamshedpur, INDIA in 1994

DATE OF BIRTH : 2nd January 1970

PRESENT CTC : 2,000,000 INR per annum

EXPECTED CTC : 5,000,000 INR per annum

NOTICE PERIOD : 30 days



Contact this candidate