Chad Ferrell
****-******* ****** *** ******
Section forman, last 1/2. Before ran miner, bolter,scoop, shuttle car. All phases of mining. (Relocating to Weston,
WV)
****-**** Speed Mining Inc.
Ran miner, shearer operator on long wall, belt moves, 3rd shift deadwork. All phases of mining. (Left to be closer
to home)
1997-1999 Lee Construction
Bridge Contractor, ran excavator, dozer, front end loader, backhoe, cranes (friction and hydraulic) tied rebar,
poured concrete for deck pours, ran underground pipe for electric. All phases of bridgework. (Job ended started in
VA)
1994-1997 English Construction Company
Built cloverleaf on highway and bridge construction, ran dozer, crane, excavator, backhoe, tied rebar, conrete
pours and welded pilon for abuptments. All phases of construction.
1990-1994 USMC
Force Recon Battalion Camp Lojune N.C-18 months Operation Desert Storm (Honorable discharge)