Post Job Free
Sign in

Project Manager

Location:
Borger, TX, 79007
Posted:
May 14, 2009

Contact this candidate

Resume:

Gary Barnard

*** *********

Borger, Texas *****

qp7vxn@r.postjobfree.com

806-***-****

OBJECTIVE:

Gain and maintain career with well established and respected company.

PARTIAL LIST OF EXPERIENCE AND SKILL SETS:

· Project / Turnaround Management

· Project and Maintenance Planning, Scheduling, Cost Control, and Coordination

· Management of Engineering Design, Procurement and Construction Projects

· Management / Supervision of up to 250 employees

· Contractor / Subcontractor Management

· Determination of Organization Structure Requirements

· Assurance of Compliance with Laws, Standards and Procedures

EMPLOYMENT HISTORY / EXPERIENCE:

5/2008 – Present Project / Turnaround Manager Northern California Operations__ _TIMEC Company, Inc. Vallejo, CA

Management and General oversight of Large Projects and Turnarounds from inception to project close out.

3/2007 – 5/2008 Self Employed Construction / Remodel Projects Borger, TX & Surrounding Area

Performed all bid preparation, estimating, scheduling, procurement functions. Started small family business and formed one partnership.

7/2003 – 3/2007 Project and Turnaround Systems Coordinator Chevron Phillips Chemical Co. LP - Borger, TX

2/2001 – 7/2003 Project Coordinator Chevron Phillips Chemical Co. LP - Borger, TX

Managed / Coordinated the Planning, Scheduling, Material and Service Contractor Procurement for Maintenance Projects, Construction Projects and Plant Turnarounds. Company Representative for Maintenance Service contractors. Managed, Supervised, Planned, and Scheduled Service Contractors daily in support of Maintenance Crafts and Construction Projects. Assured contractor compliance with project scope, contract terms, company policies and safe work practices. Provided guidance to Construction Supervision. Facilitated communication between Plant Management, Plant Operations, Maintenance, Construction, Engineering and Project Controls. Performed cost control and analysis. Produced AFE documentation and Master Project files for projects and turnarounds. Created Expense and Capital Projects within SAP including assignment of responsibilities, WBS elements, delegation of authority, budgets, tax structure, purchasing requirements, contract terms and conditions, and Vendor Partner information.

12/1999 - 2/2001 Project Engineering Supervisor Bechtel Corp. Phillips Petroleum Complex - Borger, TX

3/1998 - 12/1999 Senior Process Plant & Pipe Designer Bechtel Corp. Phillips Petroleum Complex - Borger, TX

8/1997 - 3/1998 Senior Process Plant & Pipe Designer Service & Technology Corp. Phillips Petroleum Complex - Borger, TX

11/1996 - 8/1997 Partner / Supervisor Pearson Industries Phillips Petroleum Complex - Borger, TX

7/1990 - 11/1996 Supervisor / Project Coordinator H. B. Zachry Phillips Petroleum Complex - Borger, TX

Coordinated / supervised activities of Project Engineering Team. Provided guidance to Construction Management and Project Controls. Managed Sub-Contractors and Support Services. Performed Integrity Audits of contractors work. Facilitated communication between Construction, Engineering, Design disciplines and Project Controls. Facilitate communication with customer. Coordinate with project engineers, civil/structural, control systems, electrical disciplines and construction management. Perform plant layout of equipment studies. Design of process piping systems. Provide material takeoffs. Perform mathematical calculations related to design functions. Generate piping isometrics and plant/piping layout drawings. Create mechanical flow diagrams.

6/1982 - 6/1983 & 6/1988 - 7/1989 Machinist Thompson Machine Pampa, TX

10/1981 - 6/1982 & 6/1983 - 6/1988 Machinist Ingersol Rand (IRI International) Pampa, TX

11/1979 - 10/1981 Machinist Pupco Inc. Pampa, TX Fabrication and design of industrial parts, industrial tools, compressor parts, and machine tooling, some of which include gears, sprockets, spline gears, drive shafts, pinion shafts and gears, bearing housings, break hubs and various other mechanical parts. Complete industrial engine and compressor rebuilding, cylinder boring, cylinder liner fabrication and installation, surface grinding, valve reconditioning, piston and rod reconditioning, crankshaft grinding, magnetic particle inspection and assembly. Set-up and operation of manual horizontal lathes, vertical turret lathes, milling machines, boring mills, tool grinders, crank shaft grinders, surface grinders, gear cutters, gear hob machines, gear tooth shapers and many other machines.

EDUCATION / TRAINING:______________________________________________________________

Ÿ TWIC – Transportation Worker Identification Credential – EXP. 04DEC2013

Ÿ Pampa High School – Pampa, TX

Ÿ Frank Phillips College – Borger, TX

Ÿ Texas State Technical College (TSTC)

Drafting and Design Technology - Mechanical Design Option

Amarillo, TX

Ÿ Trinity College and University – Bachelor of Science

Applied Science and Technology (non-accredited)

Metairie, LA

Ÿ Project Management Institute (PMI)

Project Management Training & PMP Certification (certification expired)

Ÿ University of Wisconsin

Course - Controls For Chilled Water Plants In Central and District Cooling Systems

Course - Chemical Engineering Unit Operations

Ÿ Chevron Phillips - Project Management Level 1

Ÿ Chevron Phillips - Project Economics

Ÿ Chevron Phillips - Project Development and Execution Process

Ÿ Chevron Phillips - Fundamentals of Project Scheduling

Ÿ SAP – Project Systems

Ÿ SAP – Advanced Project Systems Management

Ÿ SAP – Plant Maintenance System

Ÿ SAP – Maintenance Planning & Scheduling

Ÿ SAP – Scheduling with CM25

Ÿ SAP – Purchasing System

Ÿ SAP – Business Warehouse

Ÿ Primavera Project Planner – Planning and Scheduling With P3

Ÿ Primavera Project Planner – Resource and Cost Analysis

Ÿ Primavera Project Planner – Managing Project Data

Ÿ Supervisory Training I & II

Ÿ Supervisory Training / Continuous Improvement

Ÿ Supervisory Training / Quality Action Team

Ÿ ASME B&PV Code: SEC VIII, DIV. I + Alteration & Repair

Ÿ National Boiler Inspection Code – 1998

Ÿ API 510 Pressure Vessel Inspection Training

Ÿ ULTRA PIPE – Corrosion Analysis, Corrosion Monitoring and Inspection of Piping and Equipment –Training by Berwanger Inc.

Ÿ ULTRA PIPE – Corrosion Analysis, Corrosion Monitoring and Inspection of Piping and Equipment --Training by SOS Engineering

Ÿ KB PIPE+ – Inspection and Corrosion Monitoring of Piping and Equipment – Training by SOS Engineering

Ÿ Ultrasonic Thickness Gauging

Ÿ Ultrasonic Thickness Measurement

Ÿ Thickness Measurement Digital Display Instruments

Ÿ Non-destructive Inspection and Testing

Proficient with many Computer Applications and Programs which include the following: Some examples include; AutoCAD r.9 through 2002, Microsoft Office Applications – Word, Excel, PowerPoint, Database applications, SAP R/3, and many more.



Contact this candidate