Post Job Free
Sign in

Quality/Project Manager

Location:
Port Coquitlam, BC, V3C 5X6, Canada
Posted:
August 12, 2009

Contact this candidate

Resume:

ARDALAN E HAMIDI

#****** Citadel Dr.

Port Coquitlam, BC V3C5X6

Tel./Fax: 604-***-****

Email: ********@*******.***

O B J E C T I V E

Applying my skills and knowledge as a construction/quality manager to civil engineering and construction management companies which provide ability to grow and learn for bettering my career in the construction industry.

PROFILE

* Materials Testing Laboratories - Field, Office and Laboratory experience for 12 years

* Civil Construction - Quality Management (ISO 9001-2000) for 2.5 years

* Construction Management - Supervised & managed construction of office and residential buildings

* Engineer-In-Training (APEG-BC)

C O M P U T E R S K I L L S

* Skilled in MS Office , Familiar with Auto CAD (In most of my experiences I had to work with AUTO CAD for detailing and checking the plans), SAP (Structural Analysis Program), SAPPSTL, SAPCON, MATS, WALLER, SURFER and some other programs related to civil engineering.

W O R K H I S T O R Y

Tunnel Construction Manager, SE LI S.p.a.(Hong Kong) Dec 2008-Now

Tsuen Wan Drainage Tunnel, 7m Dia, $150M

*SELI representative in Joint Venture and Hong Kong

*Planning and preparation for TBM Assembly process

*Personnel arrangement and hiring

* Supplier evaluation and award process for tunnel equipment and related

*Managing the designer for all permanent and temporary structures

*Participate in Board Meeting as SELI’s JV member

Quality Manager, SNC Lavalin Constructors Pacific(Vancouver) May 2008-Dec 2008

*I moved to SNC Lavalin to continue with the same duties

Quality Manager, SLCP(SNC Lavalin Constructors Pacific)/SELI Joint Venture (Vancouver) Jan 2006-May 2008

Rapid Transit Train From Airport to Down Town Vancouver

* Preparation of Quality Management system(According to ISO 9001- 2000 ), consist of:

- Quality assurance manual for Bored Tunnel and revisions till approval of the manual was obtained from owners.

- Quality Control Plan (Responsibility Matrix) which is approved by Chief Engineer and Project Manager

- Quality System Procedures (Under Internal and External Audit presently)

- Work Methods and Auditing the Contractors work method

- Inspection and Test Plan

- Performing Internal Audits

* Review drawings and specifications for quality control planning

*Arranging all the quality control testing for the project; Stations,

TBM (Tunnel Boring Machine), Tunnel, Pre-Cast Yard,…

*Monitoring all the test results for conformance, for example Compression strength of shotecrete and concrete.

Materials Engineer (Engineer-In-Training), Metro Testing Laboratories Ltd. (Burnaby) May.2005-Jan.2006

* Bond Testing on Fiber Composite, Parking coatings

* Pull testing on Rebar, Anchors and Bricks

* Rebar inspection

* Post Tension inspection and cable check on slab, Repair procedures

* Window Testing

* Soil, Asphalt Field Density and sampling

* Pile Inspection

* Report preparation for client on all of the above tests

Lab & Field Technician, Metro Testing Laboratories Ltd. (Burnaby) Aug.2001- May.2005

*Concrete Lab tests including; Compression test on Cylinders, Beams, Cubes, Cores and Blocks

* Concrete testing including; Sampling, Slump, Air

* Post Tension inspection and cable check on slab

* Pull testing on Rebar, Anchors, Bricks and Fiber Composite

* Rebar inspection

* Flatness test on concrete slabs

* Soil and Asphalt sampling

* Report preparation for client on all of the above tests

Manager in Training (MIT), Future Shop (West Vancouver) Apr.2000- Jun.2001

I was manager in training for Computer Department. I helped the computer department manager on his duties in the department. I gained practical management skills during this period.

Computer Sales Associate, Future Shop (West Vancouver) Sep.1999- Apr.2000

I worked as a computer sales associate in future shop and I have gotten lots of useful experience in sales. I was in top 10% of sales associates for several months.

Project Engineer, MONEN Co. IRAN Nov.1998- May.1999

* Designed, calculated and detailed steel and concrete structures for SHIRAZ, IRAN, Thermal power plant project

* Supervised the preparation of final consruction drawings

* Prepared tender documents to obtain quality estimations, work break down, all required standards, specifications and other basic documents.

Construction Supervisor , Ati-Shahr Co. Feb.1998- Nov.1998

* Supervised construction of several residential buildings approximately 8000 sq.m in TEHRAN, IRAN

* Supervised project engineers for each project

* Supervised quality control for each project

Designer, Bandar Abbas Industrial Buildings Oct.1997 - Feb.1998

* Designed, calculated and detailed steel structures for a large industrial building (ship yard for production of light ships up to 2000 tons) in BANDAR-ABBAS, a harbor in south of IRAN

* Prepared the final construction drawings

* This job was based on a closed contract with Ministry of defense

Site Manager , Ansar Sazandegi Co. Apr.1997 - Oct.1997

Managed a 3 story steel structured office building ,about 2000 sq.m. Schedule was of an essence since this building had to be ready to use in 6 month

* Compared and controlled of accordance between architectural and structural drawings

* Ordered equipments, tools and materials

* Prepared monthly detailed schedule

* Controlled the project progress and quality

* Provided monthly progress claims

* Organized structural and architectural works with electrical and mechanical activities

* Authorized sub-trades and personnel payments

Site Manager, Pars-Nakh Co. Sep.1996 - Apr.1997

* Managed and supervised construction of a 7 storey steel structured office building in TEHRAN, IRAN

Project Supervisor, Hamrah Consulting Co. Sep.1994 - Sep.1996

*It was my military service. I supervised construction projects and designed industrial buildings. (Tehran,IRAN).

E D U C A T I O N

*High School Diploma , SADR high school (Tehran,IRAN) , 1989

*BSc in Civil Engineering, Science & Technology Univ. of IRAN (Tehran), 1994

* Concrete testing and sampling certified technician by CSA, with experience in concrete testing in the field and laboratory

* Post Tension Inspection Levels 1&2 Certified

R E F E R E N C E S

References available upon request



Contact this candidate