ARDALAN E HAMIDI
Port Coquitlam, BC V3C5X6
Tel./Fax: 604-***-****
Email: ********@*******.***
O B J E C T I V E
Applying my skills and knowledge as a construction/quality manager to civil engineering and construction management companies which provide ability to grow and learn for bettering my career in the construction industry.
PROFILE
* Materials Testing Laboratories - Field, Office and Laboratory experience for 12 years
* Civil Construction - Quality Management (ISO 9001-2000) for 2.5 years
* Construction Management - Supervised & managed construction of office and residential buildings
* Engineer-In-Training (APEG-BC)
C O M P U T E R S K I L L S
* Skilled in MS Office , Familiar with Auto CAD (In most of my experiences I had to work with AUTO CAD for detailing and checking the plans), SAP (Structural Analysis Program), SAPPSTL, SAPCON, MATS, WALLER, SURFER and some other programs related to civil engineering.
W O R K H I S T O R Y
Tunnel Construction Manager, SE LI S.p.a.(Hong Kong) Dec 2008-Now
Tsuen Wan Drainage Tunnel, 7m Dia, $150M
*SELI representative in Joint Venture and Hong Kong
*Planning and preparation for TBM Assembly process
*Personnel arrangement and hiring
* Supplier evaluation and award process for tunnel equipment and related
*Managing the designer for all permanent and temporary structures
*Participate in Board Meeting as SELI’s JV member
Quality Manager, SNC Lavalin Constructors Pacific(Vancouver) May 2008-Dec 2008
*I moved to SNC Lavalin to continue with the same duties
Quality Manager, SLCP(SNC Lavalin Constructors Pacific)/SELI Joint Venture (Vancouver) Jan 2006-May 2008
Rapid Transit Train From Airport to Down Town Vancouver
* Preparation of Quality Management system(According to ISO 9001- 2000 ), consist of:
- Quality assurance manual for Bored Tunnel and revisions till approval of the manual was obtained from owners.
- Quality Control Plan (Responsibility Matrix) which is approved by Chief Engineer and Project Manager
- Quality System Procedures (Under Internal and External Audit presently)
- Work Methods and Auditing the Contractors work method
- Inspection and Test Plan
- Performing Internal Audits
* Review drawings and specifications for quality control planning
*Arranging all the quality control testing for the project; Stations,
TBM (Tunnel Boring Machine), Tunnel, Pre-Cast Yard,…
*Monitoring all the test results for conformance, for example Compression strength of shotecrete and concrete.
Materials Engineer (Engineer-In-Training), Metro Testing Laboratories Ltd. (Burnaby) May.2005-Jan.2006
* Bond Testing on Fiber Composite, Parking coatings
* Pull testing on Rebar, Anchors and Bricks
* Rebar inspection
* Post Tension inspection and cable check on slab, Repair procedures
* Window Testing
* Soil, Asphalt Field Density and sampling
* Pile Inspection
* Report preparation for client on all of the above tests
Lab & Field Technician, Metro Testing Laboratories Ltd. (Burnaby) Aug.2001- May.2005
*Concrete Lab tests including; Compression test on Cylinders, Beams, Cubes, Cores and Blocks
* Concrete testing including; Sampling, Slump, Air
* Post Tension inspection and cable check on slab
* Pull testing on Rebar, Anchors, Bricks and Fiber Composite
* Rebar inspection
* Flatness test on concrete slabs
* Soil and Asphalt sampling
* Report preparation for client on all of the above tests
Manager in Training (MIT), Future Shop (West Vancouver) Apr.2000- Jun.2001
I was manager in training for Computer Department. I helped the computer department manager on his duties in the department. I gained practical management skills during this period.
Computer Sales Associate, Future Shop (West Vancouver) Sep.1999- Apr.2000
I worked as a computer sales associate in future shop and I have gotten lots of useful experience in sales. I was in top 10% of sales associates for several months.
Project Engineer, MONEN Co. IRAN Nov.1998- May.1999
* Designed, calculated and detailed steel and concrete structures for SHIRAZ, IRAN, Thermal power plant project
* Supervised the preparation of final consruction drawings
* Prepared tender documents to obtain quality estimations, work break down, all required standards, specifications and other basic documents.
Construction Supervisor , Ati-Shahr Co. Feb.1998- Nov.1998
* Supervised construction of several residential buildings approximately 8000 sq.m in TEHRAN, IRAN
* Supervised project engineers for each project
* Supervised quality control for each project
Designer, Bandar Abbas Industrial Buildings Oct.1997 - Feb.1998
* Designed, calculated and detailed steel structures for a large industrial building (ship yard for production of light ships up to 2000 tons) in BANDAR-ABBAS, a harbor in south of IRAN
* Prepared the final construction drawings
* This job was based on a closed contract with Ministry of defense
Site Manager , Ansar Sazandegi Co. Apr.1997 - Oct.1997
Managed a 3 story steel structured office building ,about 2000 sq.m. Schedule was of an essence since this building had to be ready to use in 6 month
* Compared and controlled of accordance between architectural and structural drawings
* Ordered equipments, tools and materials
* Prepared monthly detailed schedule
* Controlled the project progress and quality
* Provided monthly progress claims
* Organized structural and architectural works with electrical and mechanical activities
* Authorized sub-trades and personnel payments
Site Manager, Pars-Nakh Co. Sep.1996 - Apr.1997
* Managed and supervised construction of a 7 storey steel structured office building in TEHRAN, IRAN
Project Supervisor, Hamrah Consulting Co. Sep.1994 - Sep.1996
*It was my military service. I supervised construction projects and designed industrial buildings. (Tehran,IRAN).
E D U C A T I O N
*High School Diploma , SADR high school (Tehran,IRAN) , 1989
*BSc in Civil Engineering, Science & Technology Univ. of IRAN (Tehran), 1994
* Concrete testing and sampling certified technician by CSA, with experience in concrete testing in the field and laboratory
* Post Tension Inspection Levels 1&2 Certified
R E F E R E N C E S
References available upon request