CURRICULUM VITAE
HENRY V. ICO
Philippines Address: 145 Brgy. Salapungan
**** *** ******, ******* ***********
Homephone Number: +634********
Handphone: +639*********
E-mail Address: *********@*****.***
Position Applied: Mechanical Superintendent/Supervisor
Summary of Qualifications:
Date April 01 2009 to July 29 2011
Company NES Global Pte Ltd
Position Contractor (Mechanical Commissioning Engineer)
Date January 2007 to December 2008
Company Seres HVAC Engineering Pte. Ltd
Position (Mechanical Commissioning Engineer)
Date December 2002 to November 2006
Company AGP (Atlantic Gulf & Pacific Company of Manila Inc.)
Position Supervisor
Date August 2002 to October 2002
Company Miescor Builders Incorporated (MBI)
Position Electrician1
Date January 2001 to August 2002
Company Miescor Builders Incorporated (MBI)
Position Technician 1
Educational Background:
Tertiary
Year 1995-2000
Course Bachelor of Science in Mechanical Engineering (BSME)
School Technological Institute of the Philippines (TIP)
Address 938 Aurora Blvd.Cubao Quezon City Philippines
Secondary
Year 1990-1994
School Maguinao Cruz na Daan High School
Address Cruz na Daan San Rafael, Bulacan Philippines
Primary
Year 1984-1990
School Maguinao Cruz na Daan Elementary School
Address Cruz na Daan San Rafael, Bulacan Philippines
Training and Seminars
Shipyard Safety Instruction Course for Workers (Hot-Work Trade)
Ministry of Manpower Accredited Training Provider
NTUC Learning HUB 10 Anson Road #06-18 International
Plaza Singapore.
Incident & Injury-Free Commitment Workshop
Conducted by JMJ Associates
Planet Holiday, Sei Jodoh Batam, Indonesia
BOSIET (Basic Offshore Safety Induction & Emergency Training) OPITO Standards
Valid Until August 6, 2014
• Offshore safety Induction
• Sea Survival
• TEMPSC Familiarization
• HUET & Helicopter Safety
• Basic Fire Fighting and Self Rescue
• Basic First Aid
Job Experiences:
Date April 01 2009 to July 29 2011
Company NES Global Pte Ltd
Designation Contractor (Mechanical Commissioning Engineer, Specializing in HVAC)
Company Profile NES Global provides engineering services and specialist staff support solutions to its worldwide client base across the Oil & Gas, Power Generation and Infrastructure markets. The network spans Europe, the Americans, Asia and the Middle East, the company had over 3,500 personnel working around the world. NES Group is a global technical, engineering, rail and IT engineering services and recruitment specialist. Established in 1978 the group provides engineering services.
Job Responsibilities: As a discipline HVAC Commissioning Engineer my responsibilities are;
• To ensure all Mechanical/HVAC systems commissioning scope is clear.
• Develop marked-up drawings of sub-system boundary limits of project drawings for all systems at D&ID and P&ID level.
• Compile and develop detailed Commissioning and Function Test Procedures ensuring all design parameters and function logic controls are identified.
• Liaise with engineering team to ensure all commissioning issues are dealt with in a practical manner.
• Identify all temporary systems/tools/consumables required for all phases of the project.
• Identification of all portable commissioning test equipment required, control of all calibration certification.
• Input to the commissioning sequence logic schedule, Provide expertise in commissioning preparation, commissioning execution and start-up.
• Supervision of vendors and technicians during commissioning activities both onshore and offshore (HVAC, Instrument & Utility Air, Fire Water & Foam System, FM200 Fix Fire Fighting System, Service Water System, Wash Down Water System, Potable Water System, Diesel and Aviation Fuel System, Open Drains System, Closed Drains System, Sewage Treatment System, Pedestal Cranes & Bridges Cranes, Survival Craft System, etc.)
• Witnessing all Commissioning, verification of system balancing, review of project, vendor documents, drawings, procedures etc.
• Complete and execute Pre-commissioning & Commissioning activities as identified within each Commissioning Function Test Procedure.
• Population of Project Information Management System (PIMS) data base.
• Completes the commissioning activities in a safe and timely manner within the budget, in line with the Project’s procedures, specifications, performance standards & legislation requirements.
• Achieves the commissioning targets for the onshore and offshore commissioning of systems.
• Participate in all punch list identification, including tri-party walk through of subsystems.
• Participates to the acceptance of assigned subsystems from Construction Mechanical Completion Hand Over.
• Review of technical queries.
• Coordination to Commissioning Preservation coordinator.
• Responsible for all as-built mechanical information, walkthrough of completed systems at drawing level and complete all as-built requirements.
• Ensure that all associated persons are involved in witnessing of all respective mechanical pre-commissioning and commissioning activities.
• Liaise with commissioning punch list coordinator.
• Issue weekly report to the Lead Mechanical Commissioning Engineer of all activities being worked for discipline department.
• Review of all SPIR’s reference to commissioning spares.
• Ensure all safety issues are identified during review of drawings, documents and procedures.
• Understand and work within the PTW system, participates in the permit to work meetings, raise Livening-Up notices.
• Organize tool box talks before all commissioning activities, Complete JSA for each pre-commissioning & commissioning activity.
• Attend vendor meetings as required.
• Participates in Hand Over, Turn Over and acceptance of assigned systems through all phases of the project.
• Attend meetings as requested, attend as requested Factory Acceptance Tests (FAT) local and overseas.
Platong Gas II Living Quarters (PLLQ2)
Onshore & Offshore Hook Up and Commissioning
Toa Payoh Singapore, Batam Indonesia & Songkhla Thailand
April 1 2009-July 31 Onshore, August 1- October 3 2010 Offshore
Platong Gas Central Processing Platform 2 (PLCPP2)
Onshore & Offshore Commissioning
Batam Indonesia October 4-2010 to Present
Date January 2007 to December 2008
Company SERES HVAC Engineering Pte Ltd.
Designation Commissioning Engineer
Company Profile: SERES HVAC Engineering Pte. Ltd. was established in the year 2002. It
undertakes all kinds of Heating, Ventilation, Air-conditioning and Refrigeration
(HVAC/R) System in the Marine Industry. The company is a Direct Contractor
In Keppel Group (FELS) since year 2002. The company has more than 500
Employees.
Job Responsibilities: As commissioning engineer my responsibilities are;
• Liaise with engineering team to ensure all commissioning issues are dealt in practical manner.
• Provides expertise in commissioning preparation, commissioning execution and start-up.
• Identify all temporary systems/tools/consumables required for all phases of the project.
• Maintain good communications with all relevant departments.
• Complete and execute pre-commissioning and commissioning activities as identified within each HVAC Commissioning Function Test Procedures.
• Completes the commissioning activities in a safe and timely manner.
• Participates in all punch list identification including tri-party walk through of systems.
• Liaise with commissioning punch list coordinator.
• Actively promote a safe work environment and good standards of housekeeping.
• Prepare work permits as required for each activity as per the permit to work system.
• Understand and work within the permit to work system, participates in the permit to work meetings, raise all HVAC livening-up notices.
• Organize tool box talks before all commissioning activities.
• Identify all first fill lubrication/Chemical requirements.
Date December 09 2002 to November 25 2006
Company AGP (Atlantic Gulf & Pacific Company of Manila Inc.)
Designation Supervisor
Company Profile Atlantic Gulf & Pacific is first established in 1900 under the United States, AGP
Pioneered in construction projects that significantly contributed to the development of Philippines economy. The scope of work and services offered complete design (living quarters, vessels 7 tanks), detailed shop/erection drawings and engineering, material procurement, fabrication, machining and pre-assembly works, construction (structural erection including mechanical equipment, piping, electrical 7 instrumentation systems installations), inspection, non-destructive testing (NDT), pre-commissioning and commissioning works.
Job Responsibilities: As a Supervisor my responsibilities are;
• Coordinate/report to project manager on a daily basis regarding to project progress report.
• Create daily progress report, monitor and control the technical aspect of project execution by coordinating with the suppliers and fabrication subcontractors.
• Monitor the construction work, identify the potential problems and initiate the necessary actions to ensure that quality and target date are reached as planned.
• Ensure that the subcontractor comply with the agreed inspection test plan associated with working procedures.
• Verifies subcontractors inspection and documentation report conform to the contract requirements.
• Supervise all kinds of construction activities.
• Ensure activities are completed as per the agreed work scope and required modifications are identified in a timely manner, control changes in work scope closely with regards to additional cost and effects.
• Ensure activities are conducted and completed in accordance to the companies HSE policies.
• Maintain daily activity LOGS for project and issue a close out report after completion.
• Prepare work permits as required for each activity as per the permit to work system.
• Act as performing authority and ensure tool box talks are completed for each critical work activity and all precautions adhered to at all times.
• Actively promote a safe work environment and good standards of housekeeping.
• Review activities on continuous basis and identify possibilities for improvement and application of new technologies.
• Maintain good communications with all relevant departments and contractors.
• Ensure construction staff competency program is maintained.
• Actively contribute to and support implementation of construction performance improvement activities.
• Ensure construction manning requirements are accurately specified and communicated to relevant parties.
• Establish and manage a professional relationships with vendors to ensure provision of deliverables and services.
Projects Involved
Project Platong Gas II Project
Type Living Quarters & Processing Platform
Location Singapore/Indonesia/Thailand
Job Scope: Pre-commissioning and Commissioning
• Ensure all HVAC systems commissioning scope is clear.
• Develop marked-up drawings of sub-system boundary limits of project drawings for all systems at D&ID level and P&ID.
• Compile and develop detailed Commissioning and Function Test Procedures ensuring all design parameters and function logic control are identified.
• Liaise with engineering team to ensure all commissioning issues are dealt within a practical manner.
• Identify all temporary systems/tools/consumables required for all phases of the project.
• Input to the commissioning sequence logic schedule and provide expertise in commissioning preparation, commissioning execution and start-up.
• Supervision of HVAC vendors and technicians during commissioning activities both onshore and offshore.
• Complete and execute pre-commissioning & commissioning activities as identified within each HVAC Commissioning Function Test Procedures.
• Population of Project Information Management System (PIMS).
• Review of technical queries, liaise with commissioning punch list coordinator, review of all SPIR’s reference to commissioning spares, ensure all safety issues are identified during review of drawings, documents and procedures.
• Understand and work within the PTW system, participates in the permit to work meetings, raise all HVAC Livening-Up notices and organize tool box talks before all commissioning activities.
Project Deep Driller 6
Type Jack Up Drilling Rig, Keppel Fels Super B Class
Location Keffel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Check Mechanical Completion in machine installation, ducting, ducting insulation, copper pipe line, cable pulling, cable termination.
• Check Air Handling Units (AHU) motor and fan belt tension, alignment, adjustments of Anti Vibration Mounting (AVM), lubrication of fan motor and fan bearings, verify correct motor running direction.
• Check Air Conditioning Condensing Units (ACCU), correct level of compressor lubricant, adjustments of Anti Vibration Mounting (AVM), verify correct condensing fan motor rotation, verification of service valves position.
• Duct line walk, inspect ducting for cleanliness, proper insulation, proper installation of volume control dampers, non-return dampers, pressure relief dampers, backflow dampers and fire dampers, ensure all dampers are in correct orientation, verify that all dampers handles can close and open fully without binding.
• Verify correct cable termination and megger testing in all HVAC equipments.
• Flushing, leak testing and pressure testing of copper pine refrigerant lines, drying and gas charging.
• Air flow balancing across all accommodation areas, galley, mess hall, dirty tea room, change room, clinic, gym, etc.
• Verify pressure differential in accommodation areas with reference to atmosphere.
• Ensure noise level is within tolerance in accommodation and other related areas.
• Verify supply voltage before machine start-up, measuring starting and running current and compare to data sheet or motor nameplate, verify motor & fan revolution per minute against data sheets.
Project R289 Transocean/SEDCO 706
Type Semi-submersible Drilling Rig DP2 Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Check Mechanical Completion in machine installation, ducting, ducting insulation, copper pipe refrigerant line, chilled water pipe line, cable pulling, cable termination and instrumentation.
• Verify correct level and grade of Chillers compressor lubrication, confirm correct condensing fan motor rotation, adjustments of compressor anti vibration mounting, verify service valves position, check condensing coil/fins for mechanical damage, check electrical connection for tightness.
• Check Air Handling Units filter for cleanliness, proper installation of pressure differential transmitter/gauge, adjustments of anti vibration mounting, lubrication of fan bearing and fan motor bearings, proper fan belt tension and alignment.
• Duct line walk, inspect ducting for cleanliness, proper insulation, correct installation of dampers, verify all dampers can open and close fully without binding.
• Airflow balancing across all accommodation areas.
• Verification of positive pressure in accommodation with reference to atmosphere.
• Noise level checking
• Flushing, gross air leak testing and pressure testing in Chilled Water System
• Chilled Water System balancing
• System monitoring, temperature and humidity monitoring.
Project Diamond Offshore R303 (Ocean Monarch)
Type Semi-submersible Drilling Rig
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Check Mechanical completion in machine installation, ducting, ducting insulation, copper pipe refrigerant line, cable termination and instrumentation.
• Check air Handling Units fan belt tension and alignment, proper installation of pressure differential transmitter/gauge, adjustments of AVM’s, lubrication of fan motors and fan bearings, inspect evaporator coil for mechanical damage.
• Inspect ducting for cleanliness and correct installation of fire dampers, VCD’s, NRD’s, PRD’s. Proper insulation of ducting.
• Flushing, leak testing and pressure testing using nitrogen for the refrigerant lines.
• Airflow balancing across accommodation, noise level test, pressure differential testing with reference to atmosphere, temperature and humidity monitoring.
Project Seadrill B291 (West Ariel)
Type Jack Up Drilling Rig Keppel Fels Super B Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Airflow balancing across accommodation, temperature and humidity monitoring.
• Machine start-up (AHU’s, ACCU’s, Ventilation fans)
• Energizing of HVAC Unit control Panel, Control Panel Function Check
• Ducting inspection including fire dampers, volume control dampers, non-return dampers and pressure relief dampers
• ACCU checking, condensing fan motor rotation, service valves positions, isolator spring for compressors, electrical terminations.
• Air Handling Units fan belt tension and alignments, isolator spring adjustments, TXV settings, verification of motor and fan revolution.
• Flushing, leak testing and pressure testing using nitrogen at refrigerant lines.
• Drying and Gas Charging
Project Transocean R307 (Trident 15)
Type Jack Up Drilling Rig Keppel Fels Super B Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Flushing, leak testing and pressure testing using nitrogen at refrigerant lines.
• Drying and Gas Charging
• Airflow balancing across accommodation, PCR, LER, workshop, helicopter room, locker room.
• Check Air Conditioning Condensing Units (ACCU’s), condensing coil, compressor lubrication level, isolator spring, electrical termination, condensing fan motor rotation.
• Air Handling Units fan belt tension, motor lubrication, fan bearing lubrication. Evaporator coil mechanical damage.
• HVAC Control Panel termination, energizing and function test
Project Awilco B285 (Wilboss)
Type Jack Up Drilling Rig Keppel Fels Super B Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Airflow balancing across accommodation, noise level testing, temperature and humidity monitoring
• Flushing, leak testing and pressure testing in HVAC refrigerant lines
• Drying and Gas Charging
• Machine start up (AHU’s, ACCU’s, Ventilation Fans, HVAC Control Panel Function Check
• Ducting inspection including fire dampers, VCD’s, NRD’s, PRD’s and instrument air for fire dampers.
Project Seadrill B277 (Seadrill 1)
Type Jack Up Drilling Rig Keppel Fels Super B Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• HVAC Control Panel Function check
• Machine Start-up (AHU’s ACCU’s, Exhaust fans, Supply fans
• Air flow balancing in living quarters, SCR, LER, workshop, helicopter waiting room, locker room etc.
• Flushing, leak testing and pressure testing, drying and Gas charging
• Air Handling Units checking, fan belt tension, alignments, lubrication of motor bearings and blower bearings, proper installation of pressure differential transmitter/gauge.
Project Deep Drilling Invest ( DDI ) B271 Deep Driller 5
Type Jack Up Drilling Rig Keppel Fels Super B Class
Location Keppel Fels 50 Gul Road, Singapore
Job Scope Pre-commissioning and Commissioning
• Commissioning, pre-commissioning of Heating Ventilation and Air-conditioning (HVAC).
• Perform High and Low pressure cut out, Airflow Balancing for in all accommodation areas, airflow balancing for all exhaust fan inside the living quarters.
• Air Handling Units inspection includes fan belt tensions and pulley alignment, isolator spring, blower rotation direction, excessive vibration and noise level.
• Taking records of all nameplates of the equipments including compressors, AHU, exhaust fns etc. for further references.
• Recording the voltage, amperes, rpm of fans and motors during run test.
• Vacuum the system, gas charging and superheat setting, pressure testing for copper pipe line.
Project Transocean R298 (Monrovia)
Type Semi-submersible Drilling rig DP2 Class
Location Keppel Fels 50 Gul Road Singapore
Job Scope Pre-commissioning and Commissioning
• Check mechanical completion in all equipments under HVAC (AHU’s, ACCU’s, Seawater Pumps, Ventilation fans and Control Panels.
• Airflow balancing across all accommodation areas.
• Check Air Handling Units fan belt tension, alignment, isolator spring, fan motor bearing lubrication, fan bearing lubrication, local control station, pressure differential transmitter/gauge, electrical termination.
• Check Air Conditioning Condensing Unit fan motor rotation, compressor isolator spring, service valves, electrical termination, correct level of compressor lubrication, condensing coil fins and filter drier.
• Line walk seawater P&ID and verify instruments.
• Check seawater pump, lubrication and alignments.
• Copper pipe flushing, leak test and pressure test.
• Drying and gas charging
• Equipment Start Up (AHU’s, ACCU’s, Ventilation fans, Pumps)
• Pressure differential check across accommodation with respect to atmosphere.
• Noise level check, temperature and humidity monitoring.
Company: Miescor Builders Incorporated (MBI)
Designation: Technician I, Electrician I
Company Profile: Miescor Builders Incorporated is a wholly owned subsidiary of Meralco Industrial Engineering Services Corp. (MIESCOR) one of the leading construction and engineering companies in the Philippines, with more than three decades of experience and expertise in the aforementioned field. Miescor on the other hand, is a subsidiary of Manila Electric Company (MERALCO) a pioneer in the field of electricity distribution with over one hundred years of service and the largest distributor of electricity in the Philippines. The services offered by the company are:
1.) Network services, Business Unit
• Overhead Transmission and Distribution line.
• Underground Transmission and Distribution System
2.) Construction Business Unit
• Civil works
• Piping Works
• Industrial Plants
• Architectural works
• Electro-mechanical works
• Telecommunications
• Underground communication system
3.) Technical Services Business Unit
• Substation construction and maintenance
• Gas Insulated Switchgear (GIS) assembly
• Power transformer assembly
• Electrical testing and commissioning.
Project: NAIA Terminal 3 Substation
Type: Gas Insulated Switchgear GIS
Location: Nichols Pasay City, Villamor Airbase Manila Philippines
Job Scope
• Power transformer assembly and oil distillation for insulation using diala b oil.
• 115 kv Gas Insulated Switchgear (GIS) assembly.
• Cable pulling and termination.
• 34.5 kv switchgear assembly.
• Surge arrester and earthing installation.
Project: Hillcrest Substation
Type: 115 KV Gas Insulated Switchgear (GIS)
Location: Hillcrest, Pasig City Metro Manila Philippines
Job Scope
• 115 KV Gas Insulated Switchgear (GIS) assembly.
• Firefighting equipment assembly and testing.
• Power Transformer assembly.
• Fire fighting equipment installation, including pipe fitting and testing.
• Surge arrester assembly.
• Control panel installation
• Cable pulling and termination.
• Cable tray fabrication and installation.
Project: Sta Maria Switchyard Substation
Type: 34.5 KV Switchyard
Location: Sta Maria, Bulacan Philippines
Job Scope
• 34.5 KV Switchgear assembly
• Control panel installation
• Cable pulling and termination
• Power transformer assembly
• Surge arrester assembly
• Fire fighting assembly and testing
• Earthing installation for the entire station.
Project: Gracepark Power Substation
Type: 115KV Gas Insulated Switchgear (GIS)
Location: Gracepark Caloocan City Metro Manila Philippines
Job Scope
• 115 KV Gas Insulated Switchgear assembly.
• Power Transformer assembly
• Surge arrester assembly
• Cable pulling and termination including fiber optics.
• Control panel installation
• Megger testing.
Personal Information
Age 34 yrs old
Date of Birth January 25 1977
Place of Birth Salapungan San Rafael, Bulacan Philippines
Civil Status Married
Citizenship Filipino
Height 5’8”
Weight 147 lbs.
Religion Catholic
Special Skills Computer Literate (MS Office, Word, Excel, Powerpoint)
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
Henry V. Ico
Applicant Name