GAUTHAM SOMI GANESH BABU
***, ***** ******, *** # ***, West Lafayette, IN-47906
py7swf@r.postjobfree.com
OBJECTIVE:
Seeking an Entry level Industrial Engineer position
EDUCATION:
Purdue University, West Lafayette, Indiana, USA
Graduated: December 2011
M.S. Industrial Engineering
GPA: 3.9/4.0
National Institute of Technology, Tiruchirapalli, India
Graduated: August 2010
Bachelor of Technology in Production Engineering
GPA: 3.65/4.0
PROFESSIONAL EXPERIENCE:
Motorola Solutions Inc., Schaumburg, Chicago, USA (May 2011 - August 2011)
Process Engineering Intern
* Performed time studies, calculated takt times, developed operator balance charts, kanbans, value stream
maps and spaghetti diagrams for 50 product families
* Developed Excel (Macros) that resulted in 84% time savings during calculation of key performance indicators
* Organized Line Balancing activities and achieved a 26% increase in throughput for one of the value stream
* Created the concept design for a Pokayoke to prevent the occurrence of scratches on the plate surfaces
Purdue University, West Lafayette, USA (August 2010 - December 2010)
Supply Chain Project on Radio Frequency Identification (RFID)
* Analyzed the effects of human errors in On-Hand Inventory Estimation using (Q,r) inventory model
* Evaluated the percent human error beyond which RFID system was profitable and demonstrated savings of
up to $100,000 per year
Rane TRW Steering Systems Limited, Tiruchirapalli, India (November 2009 - May 2010)
Lean Six-Sigma Intern
* Integrated Six Sigma "DMAIC" methodology with lean principles to reduce defect rate and improve First
Time Right (FTR) percentage
* Recommended a Future State Value Stream Map that led to cost avoidance of $ 2000 per year
Salzer Electronics Limited, Coimbatore, India (January 2009 - May 2009)
Supplier Selection Analyst
* Solved Multi Criteria Decision Making problem using fuzzy analytic network process for evaluating best
supplier in an agile manufacturing environment
* Validated the results of the study using Sensitivity Analysis and a questionnaire based evaluation to ensure
its feasibility and adaptability in any contemporary industrial scenario
TVS Brakes India Private Limited, Chennai, India (May 2008 - July 2008)
Lean Manufacturing Intern
* Spearheaded Time Studies to identify bottlenecks, value adding and non-value activities to improve the
overall productivity and efficiency of the line
* Suggested Kaizens that led to 25% cycle time reduction and 12% improvement in the throughput
SKILLS & CERTIFICATIONS:
* Lean Six Sigma "Green belt" certification
* MINITAB, QI Macros, ARENA, @Risk, SAS, AUTO CAD, PRO-E, MS Office, VBA, MRP & ERP systems
LEADERSHIP EXPERIENCE:
* Associate Co-ordinator of the 'Organization' team at the inter college technical festival held at National
Institute of Technology, Tiruchirapalli.
* Led the college senior year Tennis team to win tournaments at the University level