Post Job Free
Sign in

Electrical Engineer

Location:
Sharjah, SH, United Arab Emirates
Salary:
12000 USD
Posted:
September 26, 2011

Contact this candidate

Resume:

CURRICULUM VITAE

Present Position : H.O.D. (Electrical)

Name of Firm : Saipem SpA Sharjah Engineering., Sharjah, UAE

Name : Krishna Kumar Roy

Profession : Electrical Engineer

Date of Birth : 25th April 1955

Years with Firm : 7 years +

Nationality : Indian

Address : A-7 Purushartha Bunglows

(Correspondence in India) Near Ratnakar Society ,

Opposite YASH Complex

Gotri Road,

Vadodara – 390021

(Gujarat)

INDIA

Landline : +91-265-*******

H/P : +91-932*******

Address : Flat No. 302, MAMZAR-1

(Correspondence in Sharjah) Opposite ENOC Petrol Pump

Al-Taawun Street,

PO Box : 1802

Sharjah

UAE

Landline : +971-********

H/P : +971-*********

E.Mail : *******@*****.***

TOTAL PROFESSIONAL EXPERIENCE

33 Years

QUALIFICATION

B.E. (Electrical Engg.) - 1978, University of Mysore

AREAS OF EXPERTISE

1. Management of Engineering activity for EPC Projects.

2. Project Co-ordination & Interdisciplinary Engineering Co-ordination

3. Procurement Assistance

4. Design Engineering of Electrical for Hazardous Plant in Oil & Gas Sector

5. Inspection of Electrical Equipment

6. Electrical Safety Audit of Hazardous Plant in Oil & Gas Sector

7. Erection Supervision & Commissioning

COMPUTER/SOFTWARE KNOWLEDGE

Engineering : Smart Plant Electrical, Powertools, ETAP,CANECO, Lighting

Software AGI32, Orcad,

General : Adobe Page Maker, MS Office 2000 (Word, Access, Excel, Power

Point), MS Project

Work History

Period Employing Organisation Title/Position Location of

Assignment

14.03.2008 - Saipem SpA , Sharjah HOD Electrical Sharjah UAE

Till date

31.03.2004 - Saipem India Project Services Ltd. General Manager Chennai

12.03.2008 (Electrical) - HOD

30.01.1982 - Projects & Development India Ltd. Project Engineer to Calcutta, Mumbai

23.03.2004 Addl Chief Engineer & Baroda

17.08.1978 - Maharashtra State Junior. Engineer Bhusawal

31.12.1981 Electricity Board (Electrical)

1. For nearly more than seven years working at Saipem as Head of Electrical Department and involved in managing various activity related to Engineering & Project for Power Plant, FPSO, Crude Oil Terminal, Gas Station, LNG Terminal Projects. Planning for Leased FPSO Project. Interaction and co-ordination with various other disciplines at Chennai as well as at Head office at Milan and Paris office.

Following activities are being handled:

• Development of technically skilled manpower with multinational and multi linguistic recruitment at both Chennai & Sharjah offices.

• Develop staff performance & skill set through training and mentoring subordinates.

• Contract review and Proposal preparation, Pricing Strategy, Cost estimation from basics.

• Direct the execution of projects including overall execution strategy & planning.

• Coordination of engineering, procurement and construction activities, including interface management.

• The establishment, implementation and maintenance of project execution plans. Definition of project objectives and strategies, work scope, project team organization, risks and opportunities, overall work plan and schedule, financial plan, quality and safety requirements etc., consistent with the terms of the Contract and Company project execution plan mandatory contents.

• Implementing quality and safety on the project in consultation with the quality Assurance manager and safety manager.

• Over & above as HOD following activities have been developed under my leadership :

a. Electrical Network Stability Group

b. High Voltage System Group

c. E&I Installation Engineering

d. Software

• Smart Plant Electrical

• Lighting Software AGI 32

e. Integration of Software

• SP - Electrical to INTools

• SP - Electrical to Power Tools

2. Over period of 22 years in Projects & Development India Ltd., come across all the electrical aspect and requirement of a continuous process & hazardous plant.

3. For a period of over 3 years in 210 MW Thermal Power Plant of Maharashtra State Electricity Board at Deepnagar Thermal Power Station. He has worked as site inspection and supervision work for all electrical and control equipment.

Detail of Work Experience:

1. Design Engineering

Techno-economic analysis considering present and future requirements, if any, to arrive at the optimum design.

Short circuit calculation using POWERTOOLS

Design of Electrical Power Distribution system based on national and international standards and good engineering practices.

Selection of electrical equipment for hazardous areas.

Use of Smart Plant Electrical for following :

Preparation of electrical load list

Preparation of Single Line Distribution diagram and Protection and Metering Schemes.

Preparation of Schematic diagrams for incoming feeders, bus coupler feeders, outgoing feeders, transformer, heaters, control circuit feeders, changeover schemes utilising most suitable and compatible components.

Preparation of cable schedule and cable cutting schedule.

Preparation of material schedule / take off.

Lighting Design using Software AGI32 for following :

Preparation of Layout drawings viz. equipment layout, cable rack and cable trench layout, Power layout, Lighting layout, earthing layout, Lightning protection layout etc.

Preparation of civil scope drawings related to electrical equipment.

Preparation of terminal connection and interconnection diagrams.

Co-ordination of various relays in upstream/ downstream distribution system and selection of their setting.

Preparation of erection sketches.

Preparation of specifications for equipment like H.V. Switch Boards, Power & Lighting Transformers, D.G. sets, M.V. & L.V. Switch Boards, Auxiliary Distribution Boards, Bus Ducts ( H.V. & L.V.) , Neutral Earthing Resistors, Battery & Battery Charger, Capacitor Banks, Capacitor control panel, H.V./M.V./L.V. Motors, Power & control cables, High mast lighting towers, Flood lighting lattice tower, Illumination and other building services.

Preparation of tender documents for different electrical equipment and package and issue of enquiries.

Evaluation of offer for different electrical equipment and packages which includes checking of technical suitability of various offers, discussion with bidders, commercial comparison of offers, techno-commercial recommendations, placement of purchase / work orders, approval of vendor’s drawings etc.

PDS Model Review for Raceway and Electrical Equipment

Supervision and co-ordination of erection, testing and commissioning activities at site.

Preparation of man-hour and cost estimates, design philosophy, brief specification of equipments etc. for electrical system for tendering jobs.

Evaluation of vendors for their ability to execute the jobs similar to that required for specific projects and preparation of vendor list for different equipment and packages.

Identifying potential risks in operation and maintenance of plants manufacturing, processing, transporting and storing hazardous flammable chemicals and petroleum products.

2. Inspection & Expediting

Stage and final Inspection and testing of following electrical Equipment at manufacturer premises including expediting and progress reporting and monitoring of various supplies:

Extra High Voltage Equipment

High Voltage Equipment

Low Voltage Equipment

Hazardous Area Equipment (Flameproof / Increased Safety / Intrinsically Safe)

3. Site inspection and testing at project site of 210 MW Thermal Power Station of following equipment :

210 MW Generator Transformer , 132 KV Isolator , 132 KV outdoor Breaker.

6.6 KV / 4 MW Boiler Feed Pump Motors, 1200 KW ID & FD Fan Motors.

Controls & Instrument Testing for 210 MW Generator and Boiler.

4. Electrical Safety Audit

Experience of Electrical safety Audit of Hazardous Plants such as LPG Bottling Plants, Oil Terminals and Depots, Aviation Fuel Station, Petroleum Refineries and Lube Plants.

5. Engineering, Project, Procurement & Interdisciplinary Engineering Activity

Improvement of Technical Skill Level by way of training or recruitment of High Skill Profile personal.

Implementation of all engineering software with Test Bench

Project Co-ordination

Holding periodic interdisciplinary co-ordination meeting

Developing Change Management concept within all the Lead Engineers

DECLARATION

I declare that the details furnished in this resume are true to the best of my knowledge.

Place: Sharjah

Signature:

Date : 20th September 2011 Name : Krishna Kumar Roy



Contact this candidate