Joe Aguilera
Lakeland, FL
33810
Email Address *************@***.***
Phone 863-***-****
Fax 863-***-****
Total years of experience: 30 years
Company Joe Aguilera, INC.
-Primary Trade Metal Framer/Hanger finisher/
Ceiling Mechanic/Site Supervisor
-2nd Trade Finish Carpenter
General Work History:
-Commercial/Residential New and remodel
-Construction/Demo
-Layout
-Metal framing
-Exterior/Interior
-Drywall hanging & finishing.
-Grid Ceilings
-Finish Carpentry packages
-Fixture set up
-V c t, Ceramic, Modular Carpet Floors
-Store front, Floor ceramic, and Marble installation.
-Supervisor/Lead Experience
Projects:
Elementary, High Schools, Colleges, and Universities, Casinos, Hotels,
Malls, Hospitals, Office Build outs, Strip Malls, High Rise Buildings: Office and Condominiums, Supermarkets, Banks, Military Installations, and Home remodeling when we are in between Projects
Available for travel 100%
Additional Information:
Contractors License,
Workman’s Comp. Insurance,
Liability Insurance, Supervisor/Lead Experience,
Bilingual English/Spanish
Apache/Spanish U.S. Citizen
Authorized to work in the U.S.A., Schools, And U.S.A military Facilities.
Duns # 601829869
Education
High School
U.S Army Electronic Mechanic School
Recent Projects
Books A Million At Volusia Mall Daytona Bch. Fl.
For E M J Corp. 2034 Hamilton Place Blvd. Suite 400 Chattanooga Ten. 37421
Superintendent Jim Davis ph. 423-***-**** Office 423-***-****
Title: Drywall Contractor 9/10/08 4/14/09
Duties: Design , and install Barricade/Dust wall without damaging existing Store fronts after its removal.
Framed with metal studs hung, and finished Drywall to paint ready, painted and installed vinyl cove base.
Removed Barricade/Dust wall after storefront completed, touched up columns, and soffits so they could be repainted, finished ceramic floor tile at main entrance. Installed VCT floor, and vinyl cove base in Managers office, demoed J C Penny Mall entry Drywall, and replaced with Dense Shield ready for new store front tile, as a working Supervisor With a crew of 4.
World market At Panama City Florida Mall
For E M J Corporation 2034 Hamilton Place Blvd. Suite 400 Chattanooga Ten. 37421
Superintendent: Jim Davis ph. 423-***-**** Office 423-***-****
Title: Working Supervisor 1/1/08-3/20/08
Duties: Layout, Heavy gauge Framing Store and Mall Entry Store Fronts, going to meetings, setting up schedules, coordinating with the other trades, setting up inspections, Estimating, ordering, and unloading material as a working Supervisor with a 10 man Framing/Drywall crew.
Stuart Weitzman Shoe Store At Orlando Fl. Prime Outlet Mall
For Crane Construction Co. LLC
343 Wainwright Suite B Northbrook Ill. 60062-1928
Superintendent Bill Miller 847-***-**** Office 847-***-****
Title: Drywall/Carpentry Contractor 3/21/08-4/25/08
Duties: Estimate, and order Materials, Layout Floor Partitions, Grid Ceilings. Metal framing, Drywall Hanging, Finishing, installing Grid Ceilings, Rollaway Shelving, unload, and set up Fixtures as a working Supervisor with a crew of 4
Stuart Weitzman Shoe store at The Gardens Mall West Palm Bch. Fl.
For Crane Construction LLC.
Superintendent Don Frantz 269-***-****
Title: Drywall/Carpentry Contractor 8/23/07-12/20/07
Duties: Demoed existing store. Walls , Ceilings, ceramic Floor, Electrical, and A/C Duct Work.
Estimate, and order materials, Layout new Partitions, Grid, and Hard Ceilings .Metal Framing, Drywall Hanging, installing G.R.G., Level 5 finishing. Installing F. R. P. Setting up inspections, and Material deliveries. Install new Stockroom Shelving
Installing Grid Ceilings, Wood Trim, Ceramic, Vinyl, Marble, and glue on Carpet floors. Installing Marble on Mall side of Store Front, and Ceramic Tile on Sales side of Store Front as a working Supervisor with a 5 man crew.
Starbucks Coffee Store at Gulf View Square Mall New Port Ritchie Fl.
For Crane Construction LLC. 343 Wainwright Suite B Northbrook Ill. 60062-1928
Superintendent Don Frantz 269-***-**** Office 847-***-****
Title: Drywall/Carpentry Contractor 1/17/07- 3/1/07
Duties: Demo, Finish Carpentry Scope of work on Store Front, General Carpentry in Sales area ,And back of House.
Reframed, Store Front to new design Framed Window openings. Installed new Plywood, new Finish panels,
Wood Trim, and Window stop. Installed New 2 way Metal frame and Door on Sales to Stockroom opening. Installed F.R.P. in Stock room, new Panic Bar and hardware on new Back Door. Trimmed Store front Windows after Glass was installed. Set up Fixtures, installed new Safe, Cash Boxes, and Art Work. As a working Supervisor with a crew of 5
Starbucks Coffee Store at Citrus Park Mall Tampa Fl.
For Crane Construction LLC
Superintendent Don Frantz 269-***-**** Office 847-***-****
Title: Drywall/Carpentry Contractor 12/7/06-1/16/07
Duties: Finish Carpentry scope of work on existing Store Front and Sales area.
Installed finish Panels, and trim on existing Store Front, and Sales area. Installed New metal Frame And Door
on Stockroom to Sales area opening. Installed F.R.P. in Stock room and Restroom.
Installed new Safe, Cash Boxes, and Art Work.
Unload, and set up Fixtures, as a working Supervisor with a crew of 6.
Starbucks Coffee Store at University Square Mall Tampa Fl.
For Crane Construction LLC 343 Wainwright Suite B Northbrook Ill. 60062-1928
Superintendent Don Frantz 260-***-**** Office 847-***-****
Title: Drywall/Carpentry Contractor 11/17/06-12/8/06
Duties: Estimate, and order Material, Demo existing store Front, back of House Doors, and frames.
Drywall/ Finish Carpentry scope of work on store.
Framed new columns, reframed Store Front to new design with new Window openings.
Installed new Finish Panels, Wood Trim, and Window Stop. Hung, and finished Drywall on new Framing.
Touched up existing Drywall to Paint ready. Installed new Metal Door frames, Metal Doors, Hardware, and Panic Bar. Installed Ceramic Floor Tile, F.R.P in Back of House, and Restroom. Finished Waynes Coat, Chair Rail for other Contractor so Store could open on schedule. Unloaded Furniture and Fixtures, assembled furniture, and set up Fixtures, installed new Safe, Cash boxes, new Lockers, as a working Supervisor with a crew of 8
Starbucks Coffee Store at Country Side Mall Clear Water/Tampa FL
For Crane Construction LLC 343 Wainwright Suite B Northbrook Ill. 60062-1928
Superintendent Don Frantz 260-***-**** Office 847-***-****
Title: Drywall/Carpentry Contractor 10/8/06-11/16/06
Duties: Estimate, and order material, Demo, Drywall, Finish Carpentry, Fixture set up scope of work.
Demoed existing Store Front, reframed to new design with new Window openings. Installed Plywood,
New Finish Panels, Trim, and Window Stop after glass was installed. Installed new back metal Door frame,
metal double Doors, Hardware, and Panic Bar. Installed F.R.P., in back of House area, and Restroom. Installed Restroom Fixtures, Lockers, Cash boxes, new Safe, and Art Work. Unloaded Furniture and fixtures, assemble furniture, and set up Fixtures. As a working Supervisor with a crew of 6
Life Path Hospice Sun City Fl./R.B. Stewart Elementary School Zephyr Hills Fl.
For Raynor Company Group 9111 130 Ave. N. Largo Fl. 33773
Superintendent Randy Hester 727-***-**** Office 727-***-****
Title: Framing/Sheathing Sub 7/22/06-10/3/06
Duties: Estimating, ordering, stocking material. Layout, Heavy gauge Metal Framing, and Sheathing of Exterior Partitions, Canopy Ceilings, Entry Way Arches, and Exterior Facade Niches.
On Cold Rolled/C Channel Lathe Ceilings We installed Aluminum Vent Grill.
As a working supervisor with a split crew of 12 back and forth between both Projects.
Mac Dill Air Force Base Coalition Bld. Tampa Fl.
For Comark Building Systems Inc. 505 N. I-35 P.O. Box 789 De Soto Tx. 75123
Field Manager Tod Olson 972-***-**** Office 972-***-****
Title: Drywall/Carpentry Contractor 5/19/06-7/20/06
Duties: Estimate, and order Material for completion of Modular Building Connections. Layout Partitions,
finish decking Floors and prepped for V.C.T. Frame Metal Stud walls, and install Vinyl Panels,
Slat trim, and Vinyl Cove Base. Install Hollow Metal Door Frames, Mortised, and install Solid Core Wood, and Hollow Metal Doors, Hardware, Panic Bars, Closers, Grid Ceilings as a working Supervisor with a crew of 6
Mac Dill Air Force Base J-2 Cent. Com. Bld. Tampa Fl.
For Comark Building Systems Inc. 505 N. I-35 P.O. Box 789 De Soto Tx. 75123
Field Manager Tod Olsen 972-***-**** Office 972-***-****
Title: Drywall/ Carpentry Contractor 3/25/06-5/18/06
Duties: Estimate, order, Stock Material, for Building Skirt, And Exterior Canopy Entrances.
Design, Layout, Frame, and Sheath Canopy Entrances Columns, and Arch Openings with 6” 16 Gauge Studs, Track and Dense Glass.
Design, build, and set 16 gauge 6” Metal Trusses. Deck Trusses with Plywood. Frame Canopy Ceilings and install Dense Glass. Frame building Skirt with 6” 16 gauge Metal Studs, and install Dense Glass, install Access Panels.
Interior: Cut out and Trim Cased Opening between Buildings, install Modular Carpet Tile, Mortise, and install solid Core Wood, and Hollow metal Doors, Hardware ,Closers, Panic Bars, and Grid Ceilings with Egg Crate Tile.
As a working Supervisor with a crew of 4
Hurricane Building at Tampa James A. Haley Veterans Administration Medical Center Tampa Fl.
For Comark Building Systems Inc. 505 N. I-35 East P.O. Box 789 De Soto Tx. 75123
Field Manager Tod Olsen 972-***-**** Office 972-***-****
Title: Drywall/Carpentry Contractor 12/5/05-3/22/06
Duties: Layout, Estimate, and Stock material. Exterior: Frame and Sheath building skirt and Parapet walls
With 6” 16 gauge Metal and Dense Glass.
Interior: Deck Floors and prep for V.C.T. Layout and install Grid Ceilings. Mortise, and install Solid Core Wood, and Hollow Metal Doors, Hardware, Closers, Panic Bars, cut and install Windows on designated Doors. As a working Supervisor on a 3 Story Building with a crew of 12
Brandon Chamber of Commerce Building Brandon Fl.
For Raynor Company Group 9111 130 Ave. N. Largo Fl. 33773
Superintendent Randy Hester 727-***-**** Office 727-***-****
Title: Framing/Sheathing Sub 8/3/05-12/3/05
Duties: Layout, receive, stock materials with a Boom Lift (Snorkel Fork lift)
Frame and Deck Roof Sheer, and Parapet walls. Frame and install Dense Glass On Parapet, 16 Gauge 3 5/8 metal Overhang. Frame Suspended Cold Rolled/Hi Hat Ceilings and install Dense Glass. As a working Supervisor with a crew of 8 on a 3 Story Building
St. Pete College Garage to Classroom Conversion St. Petersburg Fl.
For Raynor Company Group 9111 130 Ave. N. Largo Fl. 33773
Superintendent Randy Hester 727-***-**** Office 727-***-****
Title: Framing/Sheathing Sub 4/12/05-7/27/05
Duties: Receive, and Stock Material. Lay out, Exterior Walls, Windows, Compound Radius Roof Sail Wall. Frame walls with windows using 8” 16 gauge Metal Studs and Track. Wrap window openings with P.T. 2x8. Frame Roof Sail Wall with 6” 16 gauge Metal Studs, Track, and 4x4 Angle. Frame walls with no windows with 3 5/8 16 gauge Studs, and Track. Hang Dense Glass, install Peel and Stick Membrane, P.V.C. Trim, and Metal Lathe, and Screed existing walls. As a working Supervisor with a crew of 8 on a 5 story building.
St. Mary’s Parrish Catholic School Tampa Fl.
For Raynor Company Group 9111 130 Ave N. Largo Fl. 33773
Superintendent Randy Hester 727-***-**** Office 727-***-****
Title: Framing/Sheathing Sub 2/8/05-4/10/05
Duties: Receive and stock Material, Layout, and establish Bench mark, and Exterior Canopy Archways, and Ceiling Elevations.
Figure out Radius’ in order to keep spring, and apex of Archways at same Elevation of different Column to Column widths.
Frame Columns and Archways with 6” 16 gauge Studs and Track, Frame suspended Cold Rolled Steel/C Channel
Lathe Ceiling, and hang Dense Glass on all 6” metal Framing. As a working Supervisor with a crew of 8.
Renaissance Hotel Tampa Fl.
For C & L Construction 2908 N. Rivers Edge Blvd. Crystal River Fl. 34429
Owner/Superintendent Chris Andrew 863-***-****
Title: Working Supervisor 5/20/04-11/24/04
Duties: Verify Layout, assign work to Interior, and Exterior Framers, Hangers, Finishers, and keep track of crews’ time. Frame Lobby ceilings, Soffits, and Elevator Fronts. Order, receive, Stock and distribute Material where needed. Make sure work is ready for inspection, set up inspections; go to meetings, supervising a crew of 20 on an 8 story building.
-Primary Trade Metal Framer/Hanger finisher/
Ceiling Mechanic/Site Supervisor
-2nd Trade Finish Carpenter