Crane Operator
Toby D. Kenton
I have ** years exp. operating cranes of variuos types.
I'm N.C.C.C.O. cerified in:
Lattice Crawler
Lattice Truck Mount
Large Hydro and Small Hydro
Tower Cranes
Austin Bridge & Road 2010 to 2010
Crane operator
built bridge over taxi way at Sky Harbor Airport ,Phoenix,Az.
set wall panels,some false work and removal,set rebar mats,some crane and bucket ,hoisted materials,2nd bridge built in the world of its kind
cranes operated:777 Manitowoc(200 ton lattice crawler)111 Manitowoc (80 ton lattice crawler) 80 ton terex R.T.C. (large hydro)
M.A. Mortenson 2009 to 2009
built solar farm for Tesersolar
set azuimth drives and sun catchers on post ,set engines on hubs.
a prototype job for renewable energy resources.
cranes operated : 8065 link-belt R.T.C. (large hydro)
Austin Commercial 2008 to 2008
built plutonium research lab in Los Alamos,New Mexico
4 story structral iron,set all the steel ,set tables,and false work set rebar mats,some crane and bucket,set wall panels and striped,set precast panels using both hoist lines.
cranes operated : 248 Link-Belt (200 ton lattice crawler )
777 Manitowoc (200 ton lattice crawler )
90 ton grove R.T.C. (large hydro)
Roel Con. 2006 to 2007
built 16 story hotel for Agua Caliente Casino in Palm Springs
set column forms and rebar,set wall jams,set tables,some crane bucket work,hoisted materials for plummers,carpenters,rodbusters,set wall panels
cranes operated: 280 pecco tower crane 220 ft. free standing 199 ft. jib
355 pecco tower crane 280 ft. free standing 180 ft. jib
A.K.I.C. 2006 to 2006
built addition to mine in Morenci,Az.
set structruall iron,set rebar mats,set wall panels,set convayer ,false work and removal,performed 2 crane ops.
cranes operated : 4100 Manitowoc series 2 w/vicon (250 ton lattice crawler)
100 ton Link-Belt R.T.C. (large hydro)
70 ton Link-Belt R.T.C. (large hydro)
75 ton Terex R.T.C. (large hydro)
40 ton Link-Belt R.T.C. (large hydro)
Maxim Crane Works 2006
shut down job in Hayden ,Az. removal of collapsed roof over the smelters,demo work
cranes operated : 8460 American (165 ton lattice truck mount)
Sunwestern 2006
built Waste Water Treatment Plant in Corona De Tucson,Az.
set steel forms using spreaders and roll blocks,set rebar mats, set scaffold,some crane and bucket work
cranes operated: 4000 Manitowoc w/vicon(175 ton lattice crawler)
Hunter Contracting 2002 to 2006
built I-8 bridge near Yuma,Az.
built V.M.O. bridge in Tucson,Az.
built Tangerine bridge in Marrana,Az.
set wall panels,set rebar mat,set columns,false work and removal
cranes operated: 60 ton Link-Belt R.T.C.(large hydro)
50 ton Link-Belt R.T.C.(large hydro)
30 ton Koerhing R.T.C.(large hydro)
20 ton P&H R.T.C. (small hydro)
25 ton mintic boom truck
KE&G 2001 to 2002
built Valencia & I-19 bridge
set wall panels,set rebar mats,crane and bucket for pier walls,set scaffold,false work and removal
cranes operated : 50 ton Link-Belt R.T.C.(large hydro)
20 P&H R.T.C. (small hydro)
Hardrock Concrete Placment 2000 to 2001
built Intergrated Learning Center @ U of A in Tucson,Az.
set wall panels,and scaffold work,set rebar mats,set precast columns,set false work and removal
cranes operated : 90 ton P&H (lattice truck mount)
55 ton Terex R.T.C.(large hydro)
Diamond Eng. 1991 to 1998
bridge department
built bridges all over the state of Nebraska
pile driving-concrete pile,H pile,sheet pile,false pile,used deisel hammer and vibratory hammer and drop hammer,clam shell work,recking ball for demo,did all false work ,ALL concrete pours were done w/ crane and bucket,set precast Ts,and steel girders,set steel forms and wood forms ,set all false work-bridge plank timbers,removed all false work w/ dragline
cranes operated:805 Koehring true friction crane (26 ton lattice crawler dragline)
References: Jan Kline (Austin Commercial)
PH.214-***-****
Richard Sena (Austin Bridge & Road )
PH.602-***-****
Mark Vick (M.A. Mortenson Con.)
PH.612-***-****
Fred Park(Hunter Contracting)
PH.520-***-****
Ron Gray(Tower Crane School Of Phoenix)
PH.602-***-****