Post Job Free
Sign in

Engineer Project

Location:
cairo, 117371, India
Posted:
March 28, 2012

Contact this candidate

Resume:

Curriculum Vitae

Career Objective:

** To obtain a challenging position in the area of project construction, , steel welding, and steel erection: boilers, tanks, piping & steel structure.

Name : Eng’r. Osama Mahmoud Abd- Elhamed Elbahrawy

Date of birth :06th June 1958

Nationality : Egyptian

Contact Tel. in Egypt : 002*********** / 002**********

Communication postal address: Heliopolis, Cairo, 12 Ismael Ramzy Street,

Apartment No 11, Cairo, Egypt

E-mail address: **********@*****.***

Education:

B.Sc. Degree in Mechanical Engineering – Power Section - in 1982 from Faculty of Engineering, Ain Shams University.

Level II NDT U-T Ultrasonic inspection. (ASNT)

Level II NDT P.T Liquid penetrant inspection (ASNT)

Level II NDT M.T Magnetic particle inspection (ASNT)

Level II NDT V.I Visual Inspection ( ASNT )

• AutoCAD 3 D training course: from Cairo University.

• Diploma in the specialty of “Heat Treatment” in the Academic year 1992/1993 from Tabbing Institute for Metallurgical Studies (TLMS).

• Training course on “Welding technology, welding metallurgy and non-destructive testing” from “Central Metallurgical Research and Development Institute (CMRDI)”.

• Training course held on “Entrance for Weldment Design” From The Egyptian Engineering Committee.

• Training course held on “Welding Technology For Engineers from Industrial Design Development Center.

WORK EXPERIENCE :

FROM 1.Feb.2011 until 1.12.2011

Technical office manager In Carlo Gavazzi Egypt (under UDHE as a main contractor) in Piping Project under Supervision of UHDE Co. as a main contractor. The Project is Ammonia / Urea fertilizers in Damietta in Egypt. Our scope is to construct the piping from compressor to turbine

My responsibility is:

Arranging project scheduling and follow up piping activities ( by Primavera)

To issue weld maps for all pipelines isometrics.

Evaluate the daily and weekly site progress, and report to the site manager

Prepare the as built drawing.

Coordinate the work with the UHDE site engineer.

Prepare Layout, and detail drawings for pipe supports. (by AutoCAD)

FROM 16 APRIL2009 UNTILL 1/2/2011

Working with “LEAD CO.”( Under Saipem as main contractor) as Senior Document Controller engineer in the UTBS

“Southern unit for treating the crude oil in “HASSI MASSOUD" ALGEREA.

Review documents/drawings submitted by the client

Classify all documents as a hard copies and soft copy

Preparing the layout for the project

Preparing the fabrication sequence for the project.

Supervising for the work shop drawings done by the draftsman

Review documents/drawings submitted by the client

Preparing the layout for the project

Preparing the fabrication sequence for the project.

DURING JUNE 2007 UNTILL March 2009

Working with WINTERSHALL PETROLIUM COMPANY(hired from Bonatti) as “Technical office engineer ”Jahkira” in Libya” Gas Oil Separation Plant (GOSP) and Gas Utility Plant (GUP),

Review documents/drawings submitted by the client

Preparing the layout for the project

Preparing the fabrication sequence for the project.

Supervising for the work shop drawings done by the draftsman

Distribute approved fabrication,W.S.D. to Yard ,material control QA/QC

Preparing the reports and weekly submitted to the client

Attend to any site problems associated with project and suggest solutions/alternatives

for the client’ approval

Issue site Queries, follow up, and close out

I am authorized person for the As-Built signing of all drawings after compilation of the project.

During April 2006 Untill May 2007

Worked with SAFARI Co. Ltd. as “Technical office & site Engineer” in Restoration Piping project in King Abdul Aziz Naval Base in Jubail, Saudi Arabia.

Prepare drafts and shop drawing for piping plane and pipe supports

Prepared the welding procedure (W.P.S)) for Carbon Steel Pipes for the application of diesel line.

Prepared the performance qualification record (P.Q.R).

Training and qualify 4 (four) welders for 6G position and 1 welder for 1G position

Supervised the Welding and Radiographic testing for diesel line pipes

Supervised the fabrication for common support pipelines.

Supervised the fabrication for Hydraulic pipe line supports

During March 2002 to March 2006

Worked as “technical office & fabrication Engineer”, with “INTERNATIONAL Co. for BOILERS & PRESSURE VESSELS IBSF”

Responsibilities were:

Preparation of route sheets, material estimation, and shop drawings for tanks, pressure vessels, and piping and steel structure.

NOTE: Route sheet is a document indicates the steps of fabrication, and the inspection needed and the hold points, type of material used..Etc.

During Nov. 1997 to Sept. 2001

Worked as “Technical Office Engineer” with KOLALY ENGINEERING Co. in Egypt.

Responsibilities were:

To prepare the workshop drawing for Steel Structure Buildings; Towers, Bridges or pipe racks

To prepare the cut sheets for tanks or vessels

To estimate the material list upon which Purchasing order is released.

To prepare Bolt list & Bolt plan, Bolt list should be sent to purchasing department.

Bolt plan is sent to erection department

To prepare Assembly list. Assembly list include: item main size, length, quantity & weight, Assembly list is sent to erection department

Examples for projects, which I participated in:

Niigata project: it was 750 ton steel structure pipe bridges TOYO project: it was a factory for petrochemicals in Sues, in which I prepare the checkered plate platform, workshop drawing for stairs and ladders.

“Ques” Newsprint paper factory project: I prepared the Workshop drawing for the main store building (300 ton) I make a complete revision for wet cleaning Building (250 ton steel structure). I make a complete design for the grating of the recovery Boiler, which was 480 ton steel structure & 40 meter height. The grating weight was about 60 ton.

Also I prepared bolt list, bolt plan, assembly list & material list for many buildings in that factory.

Workshop drawing of the steel structure of Mazout tank. Handrail & stairs workshop drawing for the Mechanical Bulb Building, Chemical bulb building & Recovery boiler building.

During 1996-1997

Worked with “MITSUBISHI HEAVY INDUSTRIES Co.” as a Technical Supervisor, for tank erection for 200 * 5 Mega watts Thermal Electric Power station in Aleppo, Syria.

My duties were:

To check the material (Bechtel Supplied) incoming of the tanks in the light of the packing list and drawing & to report to my chief about any missed items or incorrect material such as: check the shell course sheets; its thickness; its quantities; its dimension.

Check the bottom plates & annular plates.

Check the nozzles, flanges, manholes, bolts, roof steel structure, and all other items

To supervise erection work such as:

- Assembly of annular plates

- Assembly of bottom plates

- Assembly of shell plate

- Welding sequences

- Visual inspection for welding

- Assembly of roof structure & Roof plate

Witnessed in all inspection tests such as:

- Air vacuum test for bottom plate welding

- Oil leak test for shell plates welding

- Roundness test inside the tank

- Banding test inside the tank with a vertical sweep board.

Plumpness test inside the tank

Liquid penetrate test for annular plates welding

Preparation for water filling test for the tanks.

1987-1995 Nasr Boiler Co. & Babcock & Wilcox Co.

The field of work is manufacturing and erection of:

- Pressure Vessels

- Fire tube boilers

- Water tube boiler

- Heat exchangers

- Oil tanks

As a Production control Engineer in the workshop

I was responsible for the following activities:

- Distribute the new revisions of engineering drawing on the different work centers and cancels the old revisions.

- Arrange The Time Schedule( using the Primavera)

- Material list & the Inspection Plan

- Release material from stores & distribute tasks for different work centers: [cutting - edge preparation - rolling – lathing m /c’ s

- Assembly & welding

- I follow up all manufacturing stages

- I coordinated with Quality Control Department with Guidance of the Inspection Plan

- Before I request the Q.C I make pre- inspection (if possible) such as:

- Dimension check

- Nozzle opening marking

- Check opening Dim

- Check shell dimension

- Check – assembly

- Check-Welding visual inspection

- From I work as a Teacher in Technical school

1982 – 1986 : I served in the Egyptian Army as an Officer, In addition to my responsibilities in managing and Administration task, I was also responsible for technical leveling for technical military students

Skills:

- English speaking & writing.

- Thorough read for engineering drawing

- Intensive interest with details

- Good communication & co-relation

- Good follow-up

Computer Skills:

AutoCAD 2, 3 D

Solid works.

Primavera

MS Word

MS Excel

MS Access

MS Power Point

Societies:

Member in Egyptian Engineering Syndicate

Interests: reading books, playing football



Contact this candidate