Ramkumar Krishnan
480-***-****, ********@***.*** 919 E Lemon St. Apt 210, Tempe AZ, 85281
EDUCATION
**** ******* ***** **********, *** (GPA- 3.5/4.0) Tempe, AZ
Master of Science, Industrial Engineering
2010 National Institute of technology, NITK Mangalore, India
Bachelor of Technology, Mechanical Engineering
INDUSTRIAL ENGINEERING INTERNSHIP
Medtronic, Inc. Summer 2011, Tempe, Arizona
Process improvement & Supply Chain planning Intern for the CRDM (Cardiac Rhythm Disease Management) division
Implemented Design for Six Sigma framework for predictive engineering
Developed an advanced statistical inventory model for the die stack process to ensure high On Time Delivery expectations at minimal inventory holding costs.
Finance department estimated savings of $1.5 Million per year
Adapted a spreadsheet, using Oracle Crystal Ball and OptQuest, to automatically smooth and level-load the manufacturing start schedule for manufacturing hybrids (populated printed circuit boards)
Burden reduction – reduced level load manual process time by 50%, variance reduction
MECHANICAL ENGINEERING INTERNSHIP
CADES Digitech Pvt. Ltd, Summer 2008, Bangalore, India
Design Intern in the aerospace department
Engineered a composite structure for the tail section of a small passenger aircraft using various 3D modeling techniques with CATIA V5 R18
ACADEMIC PROJECTS
Regression Analysis, Regression model to predict stock price, Fall 2011, ASU
Analyzed significant predictors to be able to better invest in stocks in the future thereby minimizing risk and maximizing expected utility of investment
Model adequacy checking was performed
Investigated Multicollinearity amongst predictor variables
Performed Stepwise regression & Best subset regression to obtain the final reduced model
Production Systems, 4-C Manufacturing Case Study, Spring 2011, ASU
Examined the implementation of flexible manufacturing and automated part transfer systems in a production facility
Conceptualized potential layout for new production facility, analyzed cost of equipment, created production and tool loading schedule using deterministic heuristics
Information Systems Engineering, Production Scheduling & Planning, Fall 2010, ASU
Developed a tool for Production and Operations Managers to optimize the production scheduling process in the manufacture of missile components
Constructed Entity-Relationship models, database using MySQL & Implemented VBA in excel
Reduced operation time, setup time, idle time, bottlenecks given the number of work centers
LEADERSHIP AND RELEVANT ACTIVITIES
Administrative Assistant (People soft) – College of Liberal Arts and Sciences, ASU
Member IIE, ASU chapter, September 2010 - Present
Professional Indian classical music percussionist
COMPUTER SKILLS
Computer Software : CATIA-V5, Pro-E, AutoCAD, C++, VBA, HTML, MySQL
Mathematical : MINITAB, SAS, Arena, FlexiSim, AMPL, Oracle Crystal Ball (Simulation/Optimization software)