*** ******* **. *** #2-310-*******
Grand Junction Co. 81501 padtyq@r.postjobfree.com
Augusto Arzu
Designation: Geologist / Operations / Development
Nationality: Guatemalan
Languages: Spanish/English
Education: Geological engineering degree, University of San Carlos, Guatemala,
2004
Summary of Experience:
A geologist with experience in the oil industry involving exploration and development projects in Guatemala South Peten basin, geological information database manadgement, mud logging in oil drilling activities, oil tanks gauging(1996-2004). Logging geologist in USA (Nov 2005-Jan 2011) to meet oil and gas industry standards, for the collection of data in processing and recording drilling logs. Provided detailed analysis of rock cuttings samples, evaluated data for signs of oil or gas. Set up calibrated and troubleshot portable scientific laboratory and equipment including gas chromatographs, collective digital images of samples, monitored computers recordings of drilling activities, picked formation tops based on data observation and reported back daily operations geologist and/or client representative, prepared daily and end reports.
Professional Experience:
Apr/2010-Jan/11 Canrig Technology Inc.
Working as a mudlogger on wellsites for the Mudlogging division.
Jan/2005-Mar/09 USA Datalogtechnology / International Logging Inc.
Working as a mudlogger on wellsites for the Mud logging division.
Jun/1996-Mar/2004 Ministry of Energy and Mines Guatemala
Divided assignments between office and Oilfields.
Office: Clerical Control of Petroleum Contracts (Contracts Manager)
Oilfields: Oil Production and Well Drilling issues, oil tanks gauging and Mud Logging Supervisor
Accomplishments:
May/2002 Pemex, S.A. Mexico
Technical Information Interchange About the Hydrocarbon Basin in southern Mexico
Sept/2000 Petroequador and Petroproduccion Ecuador
Stratigraphy, Biostratigaphy and Digital Microscopy Class
Nov/1998 Universidad de San Juan Argentina Argentina
Image Processing of Satellite Pictures
Computer Skil
Familiar with MS Office program,
Autocad & Adobe Photoshop management.
.
Well Summary
GUATEMALA:
Approximately 31 wells in Guatemala some of them horizontal. Position involved
government operation reports collecting, mud logging activity supervision,(1996 to 2004).
USA:
Approximately 30 well from 2005 to 2011 position involved mud logging activity.