IBRAHIM BASRAWI

** ******** **** ****

Concord, Ontario L4K 5M3

905-***-****

********@*******.***

PROFILE:

• Over 10 years of experience in plastics Extrusion industry

• Pipe extrusion, PE, PP, PVC, PTU profile extrusion

• 4 Years experience in polymers cross linking

• 3D Modeling using SolidWoks and proficient in CAD

• Works independently as well as part of a team

• Master in Mechanical Engineering from University of Toronto

• A member of the Professional Engineers of Ontario (PEO)

WORK EXPERIENCE:

DSG-CANUSA, Toronto, ON 2007- Present

Product/Process Engineer Heat Shrink Tubing

• Responsible for continuous process improvement and optimize existing processes in Extrusion area and throughout the plant

• Responsible for product development of heat and cold shrink pipe to IEEE 48 and IEEE 404 standards.

• Arrange testing product to the industry standards in an independent lab upon request

• Technical resource for the areas of process specs, line support, raw materials, environmental and safety development

• Technical support to Suzhou, China plant

• Responsible for tools and dies design

• Responsible for sourcing, installing and commissioning new equipment.

• Troubleshooting extruders and down stream equipment

ESCALATOR HANDRAIL COMPANY, Oshawa, ON 2003-2007

Process Engineer-Handrail Extrusion

• Responsible for continuous process improvement and optimize existing processes

• Technical resource for the areas of process specs, line support, raw materials, environmental and safety development

• Responsible for tools and die design using Mechanical Desktop 5

• Conduct process trials, analysis and testing for new material and dies

• Demonstrated successful problem solving and Ability to analyze situations on the production floor

• As a part of R&D team I was responsible for products quality improvement and reduce scrap rate

• Responsible for preventive maintenance and routine check for equipment, tools and die parts to insure that they are in excellent conditions all the time

• Visit raw material suppliers and work with suppliers in order to solve problems related to processing their materials.

AERO PLASTICS LTD, Concord, ON 2001-2002

Project Engineer-Profile Extrusion

• Responsible for the maintenance program of all the equipment in the plant (chillers, compressors, extruders) according to the ISO 9001:2000

• Supported production personnel in order to improve the process in the extrusion department.

• Responsible for the daily productivity report and analysis

• Responsible for die design and product development for office furniture and windows.

• Provided the cost estimation for the new automotive equipment

• Material management, reuse the regrind generated from the set-up and returned goods in order to reduce the cost.

• Responsible for the UV project, Maguire Unit, and plant layout

• Selecteded new equipment in order to increase the output

CPI PLASTICS GROUP LTD, Mississauga, ON 1998-2001

Supervisor-Profile Extrusion

• Actively participated in process improvement and cost reduction programs.

• Interacted between various departments within the company

• Coordinated data collection and sampling for projects

• Developed process material flow, space utilization and manpower planning

• Analysed and enhanced quality control

• Provided launch support in house and at customer locations.

• Supervised manufacturing process of extrusion.

• Confirmed with production supervisors to co-ordinate activities of individual areas

• Attended quality and production meetings

• Prepare operating/packaging instructions and actively participate in operator training

• Performed other duties as assigned by Management

ALEPPO GENERAL PLASTICS LTD 1996-1997

Manufacturing Engineer-Profile Extrusion

• Co-ordinated manufacturing process for injection moulding

• Participated in project meetings and product development meeting

• Ensured that the projects were all completed in timely manner

• Assisted production personnel to improve the process and quality control

• Reproduced rejected parts based on specifications, reduced the cost by 20%

• Provided cost estimation and prepared engineering drawings

EDUCATION:

May 2010 Completed Dale Carnegie course.

June 2004 UNIVERTY OF TORONTO – Toronto, ON

M.ENG, Master of Engineering

Jan 2003 UNIVERTY OF TORONTO – Toronto, ON

Worked on a project with Professor Chul.Park related to the Microcellular polymer processing using Wood Fibre as filler. The process is very cost effective and can reduce the products cost significantly.

ACCOMPLISHMENTS

• Patented fibre optic splicing technology.

• Reduced scrap rate by 10% and Improved productivity by 25%

• Successfully completed installing extrusion line, commissioning, training the personnel in Suzhou China in 2009 and 2010

SKILLS, HOBBIES AND INTERESTS:

• Fluent in English, French, Spanish, Arabic and working on Mandarin

• Reading, Soccer, Traveling



Contact this candidate