PERSONAL DATA:
Name : BENNI DANIL
Address : JL.CENDANA no. 10 RT 04/ RW 04 KEL. BABUSSALAM, KEC. MANDAU, KAB. BENGKALIS
Date of Birth : June 04, 1984
Place of birth : DURI – Riau
Sex : Male
Height : 178 cm
Hand phone : +62-813-**-****-**
E-mail : ***********@*****.***
Citizenship : Indonesia
Identification Number : 1403090406846074
NPWP Number : 25.046.012.8-219.000
Passport Number : R 355431
Place of issue : BENGKALIS / RIAU
Marital status : Single
EDUCATION BACKGROUND
University : UNIVERSITAS ISLAM RIAU
Major in : Mechanical Engineering (Bachelor of Degree)
Title of Thesis : Electric Submersible pumps Design that used to Pumping Crude oil from oil well formation to Gathering station in CPI BALAM South- Field.
Grade of Study : S1 (Bachelor of Degree)
G.P.A : 3, 57 (for the scale 4, 00)
EMPLOYMENT BACKGROUND
Classification: Service Operator Frac/ Acid.
September 2009 – Now:
Halliburton Energy Service
Dept/ Position : Gravel Pack/ Field Specialist
Duties:
Make sure all of equipments and chemical are fit of purpose to sent to location as per engineering required, and have valid certification test for equipment, especially iron and pumping equipment and manifold, MSDS, and Transmittal advice, Material loading sheet from warehouse.
Perform Safety meeting to review JSA, risk assessment around field route for JM, confirm approval for JM while leaving and departure from shop/ location.
Good convoy procedure as company field trip
When at location,
Done safety meeting to review JSA for set unit at location, lay out setting unit, and risk assessment, after get explanation from access control at rig site with Costumer and Rig superintendent/ tool pusher.
Perform safety rig up procedure with crew, and prepare equipment and chemical at location.
Discuss and calculation wellbore volume, capacity, and concentrate mixed of chemical need to perform job as per tally liner program at rig site.
Mixing chemical
Lead PJM before job execution to explain and review SOP, JSA, MSDS, HSE, and job troubleshooting / action plan if abnormal condition during job performs.
In charge as pumping operator during job.
Briefing and evaluate job result with costumer/ Drilling site manager, good customer satisfaction.
Complete job ticket, job log, job summary, and other support document.
PJM, Perform safety rig down procedure, and demobilize all unit and equipment to shop safely with complete JM report, and as company convoy procedure.
November 2007 – September 2009:
Halliburton Energy Service
Dept/ Position : FRACTURING – ACIDIZING/ Pumping operator/ Frac operator at FRACVAN II Interface.
Duties:
Make sure all of equipments and chemical are fit of purpose to sent to location as per engineering required, and have valid certification test for equipment, especially iron and pumping equipment and manifold, MSDS, and Transmittal advice, Material loading sheet from warehouse.
Perform Safety meeting to review JSA, risk assessment around field route for JM, confirm approval for JM while leaving and departure from shop/ location.
Good convoy procedure as company field trip
When at location,
Done safety meeting to review JSA for set unit at location, lay out setting unit, and risk assessment, after get explanation from access control at rig site with Costumer and Rig superintendent/ tool pusher.
Perform safety rig up procedure with crew, and prepare equipment and chemical at location.
Calculation wellbore volume, capacity, and concentrate mixed of chemical need to perform job as per engineering program/ job proposal.
Done bucket test blender and confirm to blender operator to mixing chemical as per engineering program.
PJM before job execution to explain and review SOP, JSA, MSDS, HSE, and job troubleshooting / action plan if abnormal condition during job performs with all crew , engineer and costumer.
Done Pump performance test/ Priming up pump. Calibrate MC2 for external slurry rate and done pressure test line.
In charge as FRACVAN II operator during job execution.
Able to act as FRAC Pump operator, mountain mover operator.
Briefing and evaluate job result with costumer, good customer satisfaction.
Complete job ticket, job log, job summary, and other support document.
PJM, Perform safety rig down procedure, and demobilize all unit and equipment to shop safely with complete JM report, and as company convoy procedure.
September 2006 - November 2007:
Halliburton Energy Service
Dept/ Position : CEMENTING/ Svc Operator.
Duties:
Make sure all of equipments and chemical are fit of purpose to sent to location as per engineering required, and have valid certification test for equipment, especially iron and pumping equipment and manifold, MSDS, and Transmittal advice, Material loading sheet from warehouse.
Perform Safety meeting to review JSA, risk assessment around field route for JM, confirm approval for JM while leaving and departure from shop/ location.
When at location,
Done safety meeting to review JSA for set unit at location, lay out setting unit, and risk assessment, after get explanation from access control at rig site with Costumer and Rig superintendent/ tool pusher.
Perform safety rig up procedure with crew, and prepare equipment and chemical at location.
Calculation wellbore volume, capacity, and concentrate mixed of chemical need to perform job as per engineering program/ job proposal with cementer in charge.
PJM before job execution to explain and review SOP, JSA, MSDS, HSE, and job troubleshooting / action plan if abnormal condition during job performs with all crew , engineer and costumer.
Done Pump performance test/ Priming up pump. Calibrate MC2 for external slurry rate and done pressure test line.
In charge as Pump operator during job execution.
Complete job log, job summary, and other support document.
PJM, Perform safety rig down procedure, and demobilize all unit and equipment to shop safely with complete JM report, and as company convoy procedure.
COMPUTER SKILLS
MS. Office Application – Fluent
Auto CAD 2D & 3D – Fluent
Halliburton Data Acquisition program such as, Stimulation Window, UNIPRO II, HALWIN, CEMWIN, Halliburton Inside for Stimulation (IFS Software) – Fluent
Acquired Application – Fluent
I-handbook (Halliburton & Schlumberger) – Fluent
FRAC Pro Engineer – Fluent
ARC system for HQ-2000 Pump Program / BLENDER OIP System
SPECIALIZATION:
I’m able to operate almost all of Halliburton pump, such as:
Cementing Pump Operator (CPT- ZS4, CPT- Y4) and Accessories ( Bulker, bulk Mixer, etc)
Acid Pump Operator ( Combo Acid Pump Trailer) and Accessories (Acid Tank, Lp Mixing Pump)
Frac Pump Operator ( V-16, V-12, Grizzly “HQ-2000”) and Accessories (Power pack, etc)
Frac Van II Interface Operator (DAC “Data Acquisition Control”, IFS ‘Insite for Stimulation”)
Gravel Pack Pump operator , mixer, etc.
LANGUAGE:
English
Indonesia
TRAINING ATTENDED:
Jakarta : Cementing I Training
Jakarta : Stimulation I Training
- Fundamental Safe Work Practice
- Quality Rigger I Training at Halliburton Company
- Quality Rigger II Training at Halliburton Company
- Defensive Driving at Halliburton Company
- SAP Module CPI at Halliburton Company
- Respiratory Protection at Halliburton Company
- Introduction to the Code of Business Conduct online
- Essential Mathematics at Halliburton Company
- Electrical Safety at Halliburton Company
- E- Compliance and Careful communication at Halliburton
- CPI Overview at Halliburton Company
- Back Safety Training at Halliburton Company
- Radiation – Radio active Dosimeter- End User
- Explosive general awareness at Halliburton Company
- Personal Protective Equipment at Halliburton Company
- Fire Prevention and Control at Halliburton Company
- 5S overview training at Halliburton Company
- Basic nitrogen and safety at Halliburton Company
- Blood born pathogen at Halliburton Company
- Cementing I training on line at Halliburton Company
- Cementing II training on line at Halliburton Company
- Cementing II training on Malaysia
- Confine space entry at Halliburton Company
- Environmental awareness at Halliburton Company
- Ergonomic – general awareness at Halliburton Company
- Essential mathematic online at Halliburton Company
- Fall protection at Halliburton Company
- H2 S Training at Halliburton conference room- DURI
- H2 S Training on line at Halliburton Company
- Hand and finger safety at Halliburton Company
- Hand and power tool safety at Halliburton Company
- Hazard communication at Halliburton Company
- Hearing protection at Halliburton Company
- LOTTO at Halliburton Company
- Pollution Prevention at Halliburton Company
- PPE- general industry at Halliburton Company
- Radiation general awareness at Halliburton Company
- Radiation – radio active at Halliburton Company
- Radio frequency emission and well site safety awareness
- Stimulation I online at Halliburton Company
- Stimulation II online at Halliburton Company
- Substance abuse- drug free work place at Halliburton
- Waste minimization awareness at Halliburton Company
ORGANIZATION/ COURSE ATTENDED:
- CPI Training room : TOEFL/ TOEIC test (certificate)
- English conversation for advance level Course at SATNUSA English Course (Certificate)
- Jakarta : English Course – TOIEC (score is 385) (Certificate)
- Jakarta : English Course – TOEFL (score is 490) (Certificate)
- DURI : English Course – PALAPA I.E.C for Advance level (Certificate)
- RUMBAI : Award/ Certification – SPE International at PT. CPI by TORSTEN KHRITZLER
LOCATION REQUIREMENT
I will accept employment at all Company Operation Location (on- shore/ off shore/ oversees)
I hereby certify that the above information is true and correct and I agree that any misinterpretation made in this application for purpose of securing employment shall be grounds for termination or denial of employment.
REFERENCE
1. Roslan, Halliburton Coordinator at Production enhancement FRAC/ ACID Department
Mobile : +62-811-******
Email : ***.******@***********.***
2. Victoria, Halliburton SVC. Supervisor at Sand Control
Mobile: +62-812-*******
Best Regards,
BENNI DANIL