Post Job Free

Resume

Sign in

Project Control

Location:
Vadodara, GJ, India
Posted:
July 24, 2011

Contact this candidate

Resume:

CURRICULUM VITAE

POST APPLIED FOR INSTRUMENT ENGINEER/SUPERVISOR/QC

INSPECTOR (E & I)

Applicant Name Patel Pankajkumar Prabhudas.

Father’s Name Patel Prabhudas Madhavbhai.

Date of Birth 21st July 1968

Nationality Indian

Religion Hindu

Marital Status Married

Postal Address Block No: A/8 Rajsagar Society,

Near Revapark Garbas Ground,

Behind Kaladarshan, Waghodia Road, VADODARA

GUJARAT, INDIA-390019

Permanent Address As Per Above.

Telephone No. +91-997*******, +91-963*******, +91-265-*******

E mail oyjmaz@r.postjobfree.com

Passport No. H 5343384

Date of Issue 20/05/2009

Passport Validity 19/05/2019

Place of Issue AHMEDABAD, GUJARAT INDIA

Educational & Technical Qualification:

Secondary School Certificate (Gujarat Secondary Education Board. INDIA) Passed with Science Subjects in March-1986

Diploma in Process Control Instrumentation. Passed in 1988 WITH 72% MARKS, VADODARA, GUJARAT STATE. GOVERMENT OF INDIA.

Computer Knowledge:

MS OFICE, MS WORD, POWER POINT

TRAINNING UNDERGONE: Advanced Vocational Training Institute for Electronics &

Process Control Instrumentation, Hyderabad, INDIA

• Process Control Instrumentation

• Application for the Pneumatic Circuits

• Application for the Hydraulic Circuits

• Temperature Measurements

• Flow Measurements

• Pressure & Level Measurements

• Micro –XLDCS Fundamentals

• Honeywell TDC-3000

• FIRE & SAFETY

• H2S/BA Certification Course (Hydrogen Sulphide/

• Breathing Apparatus Familiarizations Course

• Permit to work training (PTW)

• Safety procedure electrical & Gas hazard

Total Years of Experience above 15 Years

POSITION: INSTRUMENT COMMISSIONING SUPERVISOR

Location: KHARIR, YEMEN

Client: TOTAL

Duration: 27TH SEPTEMBER 2010 TO 31ST OCTOMBER 2010

Work Responsibilities:

• Pri-commissioning & commissioning activities for Basement Processing Unit.

• Supervision for Commissioning and testing of Heat Detectors, Smoke Detectors, IR Detectors, Flammable, and Toxic Gas Detectors.

Witness and acceptance the Commissioning Loop Folder as per System & Sub

System, preparation of punch list and Review of Pre-Commissioning and

Commissioning dossiers.

Managing on-site Sub-contractor's Construction team

Provide assistance for commissioning of PLC (ICS), ESD (TRICONEX), CCC,

F&G (MSA) Systems and its related field instruments

) worked with yokogawa, Honeywell system

POSITION: INSTRUMENT SUPERVISOR/QC INSPECTOR

Worked under: KBR (BROWN & ROOT), SHELL GTL PROJECT, DOHA

QATAR

Name of the Project: QATAR SHELL GTL (Gas to Liquid) PROJECT.

Location: RASLLAFFAN, DOHA QATAR

Client: SHELL GTL

Duration: 21ST FEB 2010 TO 22ND MAY 2010

Work Responsibilities:

• Mainly involved in start up activities for pre commissioning and commissioning work,

• Witness and acceptance of the RFC & RFSU walk down, as per the contractor request.

• Responsible to handled, attand RFC & RFSU walk down, in area of Steam & Power, GTG, and HRSG and off site Utility.

• Directly worked with SHELL GTL as per him request.

POSITION: INSTRUMENT SUPERVISOR, JETTY (CONST & QA/QC)

Worked under TECHNIP, FRANCE

Name of the Project: YEMEN LNG Project – LNG Plant

Location: BAL HAF/REPUBLIC OF YEMEN (BAL HAF being located on the

Coast of the Gulf of Aden, approximately 160 kilometers west of the

Gulf Of Aden, approximately 160 kilometers west of AL-MUKALLA)

Contractor: YEMGAS FZCO

Client: YEMEN LNG COMPANY LTD.The LNG Plant is being implemented to

Deliver On board LNG ship six million seven hundred thousand (6,700,000) Metric

Tons per Year Of liquefied Natural Gas.

Duration: August 2009 T0 November 2009

Work Responsibilities:

• Responsible as a supervisor Jetty Area Marine section ( E & I) construction and QC Inspection activities related subsystem of Jetty Loading Arm,Hydraullic Power Unit, Berthing System, Gangway & Cranes, Anchor Capstan ,Navaid, Fire & Gas .

• Represent Company during weekly meeting consuming schedule plan activity and Project plan for marine construction (jetty) besides Co-ordination with Sub contractors, vendors and dealing of technical matters with management & client.

• I involved in Erection, Testing, Installation, preparation of instrument work procedure and inspection test plan, checking of field calibration and instrument installation, arranging inspection reports as per the RFI inspection for instrument activities., Coordinating with sub contractors and vendors to achieve the job done on expected time. Checking the daily progress report and submitted it to QC section. Coordinating with management and making planning to get job to subcontractors for their requirements of materials and ordering it to complete the job on time.

• Planning and execution of construction activities involving erection & installation Plant earthling System (IS IE.IP) Power & control cable Pulling and Termination As per cable schedule.

• Performed Catholic Protection Test.

• Managing on-site Sub-contractor's Construction team.

• Developing and Organizing Construction Team for Instrumentation

POSITION: INSTRUMENT SUPERVISOR LOOP CHECKING SV.

Name of the Project: DUNG QUAT REFINERY PROJECT, VIETNAM

Location: DUNG QUAT REFINERY PROJECT, VIETNAM

Contractor: called CONTRACTOR (means TECHNIP CONSURTEAM)

Duration: AUGUST 2008 TO APRIL 2009

Work Responsibilities:

• Performed Loop checking and fault finding as per the Loop Drawing, ILD, and Inst Datasheet & Schematic Drawing.

• Actively involved in F&G works including field detection devices installation and commissioning and control system configuration and testing.

• Loop Checking and Functional test of HV & LV Motors (PLC BASED), Super Heaters, Recycling Gas Compressors, Nitrogen package, Air Dryer, Sea Water Package.

• Preparation and Review of pre-commissioning / commissioning documents, Check Sheet, Test Sheet, performed in Loop checking and fault finding as per the Loop wiring & Schematic Logic Diagram.

• Performing functional test of Fire & Gas all type of Detectors Instruments.

• Witness and acceptance the Commissioning Loop Folder as per System & Sub System, preparation of punch list and Review of Pre-Commissioning and Commissioning dossiers.

• Provide assistance for commissioning of PLC (ICS), ESD (TRICONEX), CCC, F&G (MSA) Systems and its related field instruments.

• Logic function testing of Emergency Shutdown interlocks and fire & gas interlocks Preparation and Review of pre-commissioning Loop folder as per System & Sub System.

• Supervision for wiring of console mounted instruments and Control panels, which includes ICS (Instrument Control System), ESD (Triconex), CCC (Compressor Control Corporation) and modification of TCP (Turbine Control Panel) and F&G panels (MSA) and Relay

• Review of Construction drawings, Technical Document Preparations, Material Procurement and Manpower planning.

• Supervision for Commissioning and testing of Heat Detectors, Smoke Detectors, IR Detectors, Flammable, and Toxic Gas Detectors.

POSITION: INSTRUMENT QC INSPECTOR/CONST. SV/LOOP CHECK SV. AND

START UP ACTIVITIES.

Name of the Project: TASNEE ETHYLENE CRECKER PROJECT, IBN ZAHR 0CT

Location: JUBAIL, KINGDOM OF SAUDI ARABIA (KSA)

Contractor: SAMSUNG SAUDI ARABIA LTD.

Duration: JULY 2007 TO JUNE 2008

Work Responsibilities:

Mainly involved in construction & QC Activities with Loop Checking up to start up in Area of Demin Package, Boiler A & B and sea water intake, work inspected under by Linde Engineering.

• Planning and Execution of construction activities involving installation and Calibration of hydraulic & pneumatic,Transmiter flow, temperature, pressure and level instruments, pressure differential gauges and transmitters control valves, shutdown valves, safety relief valves, fire and gas detection equipments. As per location layout, datasheet, P&ID and hook up drawings. Cording to project specification and procedure

• Pre-commissioning and -commissioning activities such as preparation of checklist, loop folder, loop checking, interlock checking and reading providing support to the field area Instrument Technicians together with contractors, vendors and other staff in order to support instrument Team and Control system (DCS, PLC and various package control systems)

• Plan activity and project plan for commissioning besides Co-ordination with Sub contractors and dealing of technical matters with client.

• Worked with F & G System (Honeywell SMS, Tyco), VTMS (Bentley Nevada), Loading Control System (Siemens), MMS (Machine Monitoring System), VSDS (Variable Speed Driving System)

• Responsible for Supervision of day-to-day construction activities such as Instrument calibration, installation, cabling, termination, QA/QC, loop checking, pre-commissioning.

• QA/QC coordination and As-built drawings preparations.

• Inspection & witnessed Fiber optic cable with vendor

POSITION: INSTRUMENT LOOP CHECKING SUPERVISOR

Name of the Project: South Pars Gas Development Project, Phase 6, 7 & 8

Joint venture of: TEC/EDRO/JGC/DIC, SPGD

Location: ASHULIYA, IRAN

Contractor: JGC, JAPAN

Duration: JANUARY 2007 TO JUNE 2007

Work Responsibilities:

• Performed & organized the loop check teams. Coordinating with sub-contractor, QC Department and client for day-to-day loop check activities. Rectification of malfunctioning loops. Organizing the loop folder preparation of DCS, ESD, Function test package cause and effect test package. Organizing the calibration shop to carry out Bench calibration of instruments as per instrument specification

• Sheet ISS with proper test equipment having tractability of its accuracy. Organizing the leak test team and airline flushing team to perform this activity before the functional test. Carry out commissioning activities of the instruments on the completion of the construction for start up. Performing the functional test cause and effect of DCS and ESD logic as per functional test package during the startup of the process Organizing the instrument foreman / technician of team to rectify the punch list items and to do as built the drawings maintaining the proper records for the system turn over. Co-ordination with other Disciplines/Contractors. Enforcement of Safety Rules and Regulations. Implementation of Quality Control Procedures

• Extensive experience gained in all aspects of instrumentation, Fire & Gas, selected areas of loss prevention.

• Responsible for new/modify installations of Instrument Control Systems (like DCS, ESD, F&G, PLC's etc.) and field measuring and control devices

• Logic function testing of Emergency Shutdown interlocks and fire & gas interlocks

POSITION: INSTRUMENT QC INSPECTOR

Name of the Project: ORYX-GTL PROJECT (Gas to Liquid)

Location: RASALAFFAN, DOHA QATAR

Contractor: TECHNIP, ITALY

Duration: April 2005 TO JULY 2006

Work Responsibilities:

• Inspection & witnesses of Heat Detectors, Smoke Detectors, IR Detectors, Flammable, and Toxic Gas Detectors related with Fire & Gas System. Control panels, which include ICS (Instrument Control System) ESD (Triconex) and modification inspection of TCP (Turbine Control Panel) and Relay wiring. New/modify installations of Instrument Control Systems (like DCS, ESD, F&G, PLC's etc.) and field measuring and control devices.

• Conducting field inspection with client for installation of main cable trays, installation of junction boxes, local panels,marshelling cabinets ,installation of conduits & punch trays, multi & single pair cables continuity checking of multi & single pair cables, Preparation of loop folders Preparation of installation reports ,Preparation of pressure test reports ,Walk through for punch clearance

• Familiar with International Codes and Standards such as ANSI, ISO, ISA, NEC, IEC.

• QA/QC coordination and as-built drawings preparations.

• Prepared QC procedure for project based on client requirements.

• Do the material inspection for incoming material.

• Do the final inspection with client and third party.

• Monitoring the Dailey inspection with clients (RFI) as per the project inspection.

• Prepared the final documentation for the project.

• Preparing job procedures and QC Documents

• Preparation of inspection and test plan

• Preparation of method of statement

POSITION: INSTRUMENT FOREMAN

Name of the Project: RASGAS COMPANY (LNG PLAN)

Location: RASLAFFAN, DOHA QATAR

Contractor: QATAR KENTZ

Duration: JULY 2003 TOJANUARY 2005

Work Responsibilities:

• Experience include projects, installation & commissioning, operation, corrective & preventive maintenance, LNG train # 1, 2 & 3 including LNG, AGR, SRU, and Inlet Facilities, running units and shutdown maintenance of various pneumatic, hydraulic, and electronic/computer based instrumentation systems, which include basic process control system using PLC & DCS, process & emergency shutdown system (PSD/ESD), calibration of various types of field instrumentation system, final control elements, fire & gas detection system, automatic fire suppression systems, shutdown panels of well head, Bentley Nevada vibration monitoring system, Turbine control system of speedtronic Mark V TMR(HMI),SULZER TURBO Gas turbine control system Type S1, Motor operated valve of ROTORK CONTROLS LIMITED, DCS of Delta V Fisher Rosemount, ENRAF (ATG 854), compressor performance monitoring system, compressor anti-surge control system, etc. Calibration loop checking, Functional testing, start up activities of instrumentation control systems. The main systems using in this project are Foxboro I/A Invents D.C.S, Triconex PLC, field instruments of Rosemount,Yokogawa,Fisher & Rosemount Smart Positioner (DVC-6000), Experienced in interpretation of P&ID’s, Hazard Area Classification Drawings, Cause & Effect diagrams, functional logic, PLC Ladder logic and MCC schematics.

POSITION: INSTRUMENT FOREMAN

Name of the Project: Q-CHEM PROJECT

Location: DOHA QATAR

Contractor: QATAR KENTZ

Duration: AUGUST 2002 TO OCTOMBER 2002

Work Responsibilities:

• Mainly involved in start up activities for pre commissioning and commissioning work,

• Fault-finding and trouble-shooting on wide range of instrumentation systems in the Project which comprised Foxboro I/A SERIES control system, ESD system, Radar type level transmitter.

• Commissioning of Control Systems (DCS, PLC's) as well as field measurement and control devices.

POSITION: SR.INSTRUMENT TECHNICIAN

Name of the Project: INDIAN OIL CORPORATION LTD (IOCL, REFINERY)

Location: GUWAHATI (ASSAM) - INDIA

Contractor: PUNJ LLOYD LIMITED

Duration: NOVEMBER 2001 TO JANUARY 2002

Work Responsibilities:

• Pricommissioning & commissioning activities for SRU unit.

POSITION: FOREMAN (PROCESS CONTROL INSTRUMENT)

Name of the Project: MINA AL AHMADI REFINERY, (KNPC REFINERY)

Location: KUWAIT

Contractor: KENTZ

Duration: OCTOMBER 2001 TO NOVEMBER 2001

Work Responsibilities:

• Shut Down activities

POSITION: INSTRUMENT SUPERVISOR

Name of the Project: GUJARAT CHEMICAL PORT TERMINAL CO. LTD.

Location: DAHEJ (GUJARAT) – INDIA

Duration: JUNE 2000 TO SEPTEMBER 2001

Work Responsibilities:

• Responsible as a supervisor Jetty Area Marine section ( E & I ) construction and QC Inspection activities related of Jetty Loading Arm including with pre-commissioning and commissioning work particular for jetty activities.

• During pre commissioning activities to supervise loop checking, functional test for Process instrumentation and automation system with ALLEN BRADLEY, PLC

• Total 2000 Input/output’s handled from construction to loop checking, functional test of each logic’s for process equipments to ensure safety inter locks in ready positions before pre start up of process equipments. Finally hand over procedure from sections by sections to the clients as per the satisfaction.

POSITION: FOREMAN (PROCESS CONTROL INSTRUMENT)

Name of the Project: MINA AL AHMADI REFINERY, (KNPC REFINERY)

Location: KUWAIT

Contractor: KENTZ

Duration: APRIL 2000 TO MAY 2000

Work Responsibilities:

• Shut Down Activities

POSITION: INSTRUMENT SUPERVISOR

Name of the Project: OIL & NATURAL GAS COMMISSION (ONGC)

(CPF-Central Processing Facility GGS- Group Gathering Station)

Location: MAHESANA (GUJARAT-INDIA)

Duration: OCTOMBER 99 TO MARCH 2000

Work Responsibilities:

• Pri - commissioning & commissioning activities

POSITION: SR.INSTRUMENT TECHNICIAN

Name of the Project: INDIAN OIL CORPORATION LTD (IOCL, REFINERY)

Location: BARODA (GUJARAT-INDIA)

Contractor: PETROFAC INTERNATIONAL

Duration: AUGUST 98 TO SEPETEMBER 99

Work Responsibilities:

• Supervision of Shop and Field Calibrations of measuring devices and final control elements.

• Responsible for installation, commissioning and trouble shooting of various control systems & packages

• Commissioning and testing of Heat Detectors, Smoke Detectors, IR Detectors, Flammable, and Toxic Gas Detectors.

• Site Survey for preparing detailed scope of work.

POSITION: INSTRUMENT FOREMAN

Name of the Project: ARAB ’D’ GAS RECYCLING PROJECT

Location: DUKHAN, DOHA QATAR

Contractor: BROWN & ROOT

Duration: MARCH 98 T0 JULY 98

Work Responsibilities:

• Pri- commissioning & Commissioning Activities

POSITION: INSTRUMENT FOREMAN

Name of the Project: EQUATE PROJECT (UNION CARBIDE)

Contractor: JGC/BECTEL/TECHNIP

Location: SHUIBHA, KUWAIT

Duration: OCTOMBER 96 TO AUGUST 97

Work Responsibilities:

• Responsible for Construction & loop checking activities.

POSITION: INSTRUMENT FOREMAN

Name of the Project: OIL & NATURAL GAS COMMISSION (ONGC)

Location: GANDHAR (GUJARAT- INDIA)

Duration: JANUARY 93 TO FEBRUARY 95

Work Responsibilities:

• Responsible for Construction & loop checking activities.

POSITION: TRAINEE INSTRUMENT

Name of the Project: HINDUSTAN ZINK REFINERY

Location: CHITODGADH (RAJASTHAN-INDIA)

Duration: NOVEMBER 91 T0 DECEMBER 92

POSITION: TRAINEE INSTRUMENT

Name of the Project: INDIAN PETROCHEMICAL CORPORATION LTD.

Location: BARODA (GUJARAT-INDIA)

Duration: APRIL 89 TO MARCH 90



Contact this candidate