CHARLES E. PARKER

***** ****** **

St Louis, MO

63123

314-***-****)

SUMMARY

Experience on various construction projects enables me to interpret and analyze blueprints;

interface and negotiate with owners, architects, and inspectors; estimate and evaluate final project

costs; schedule and plan construction and authorize payments.

PROFESSIONAL EXPERIENCE

HBE Corporation. St Louis, MO 08/05-08/11

Chambersburg Hospital, Chambersburg, Chambersburg, PA

Lead Superintendent on this 171,000 sq ft hospital expansion including 171 new patient

rooms three cath labs. 73 million dollar contract.

Montgomery General Hospital Onley, MD

Superintendent of the 81,000 sq ft addition and 30,000 sq ft remodel including new

emergency department cardiopulmonary cafeteria outpatient physical medicine. 26 million

dollar contract.

Southeast Georgia Health System, St Mary's, Georgia

Superintendent on this 24,250 sq ft addition and 90,000 sq ft remodel. new maternity care

LDRP suites and 4 new surgery suites. 26 million dollar contract.

Paric Corporation. Ofallon, MO 02/02-02/05

Sparta Community Hospital Sparta, Illinois

Superintendent of the 17,000 sq ft hospital expansion including two new surgeries

Suites ER and laboratory. 5.1 million-dollar contract.

Boardwalk Marketplace Ofallon, Mo

Superintendent on this mixed-use multi building spec retail project with design

Build mechanical and electrical.3.9 million-dollar contract.

Parker Real Estate Development Group Inc., St. Louis, MO 05/01-02/02

Mattese Commons, St. Louis, MO

Project Manager of a 26-acre mixed-use site development including 4,200 sq ft of retail space,

29,000 sq ft office building and 276 residential units. My duties included design team

management from conception through zoning proposal.

Page 1 of 4

Haydon Building Corp., Phoenix, AZ 01/99-05/01

University Medical Center, Las Vegas, NV

Superintendent of a 64,000 sq ft 2-story hospital expansion project which included the

ER/ICU/CCU build out. The construction of the CO generation power plant for the complete

hospital facility was added as a two million dollar change order. This project had a 20 million

dollar contract.

R.A.S. Builders, Denver, CO 01/95-01/99

Wal-Mart, Fountain CO

Superintendent of a 135,000 sq ft addition to an existing 85,000 sq ft structure facilitating the

conversion to a Super Wal-Mart. This project had a 6.1 million dollar contract with a ten-month

completion schedule.

Lowe’s Hardware, Garland, TX

Superintendent: This project was 190,000 sq ft hardware store with an 18-acre site development.

This project had a 6 million dollar contract with a one-year completion schedule. R.A.S. Builders,

Denver, CO.

United Artists Theaters, Albuquerque, NM

Superintendent of a nine-theatre complex addition at the new Cottonwood Mall. This project had

a 5 million dollar contract with an eight-month completion schedule.

Montgomery Wards, Albuquerque, NM

Superintendent of a two-story 170,000 sq ft retail store at the new Cottonwood Mall. This project

had a 7 million dollar contract with a one-year completion schedule.

Porter McLoud, Denver, CO 04/93-01/95

Mervyns’, Denver, CO

Project Manager: This project involved four open remodels at the same time. This project had a

10 million dollar contract with ten-month completion schedule.

Best Buy, Aurora, CO

Superintendent of a 45,000 sq ft block building. This project had a 2 million dollar contract with a

six-month completion schedule.

Cheyenne Mountain Conference Resort, Colorado Springs, CO 01/92-04/93

New Dove Lodge, Colorado Springs, CO

Owner’s Representative/General Superintendent/Assistant Project Manager in charge of a fire

insurance claim re-design and construction of forty-nine guest suites. This project had a 2 million

dollar budget and completion date of spring 1993.

Federal Contracting, Colorado Springs, CO 04/91-01/92

Falcon Air Force Base, Colorado Springs, Colorado

Superintendent/Quality Control Engineer/Safety Engineer of a project that involved three separate

buildings with a 3.5 million dollar contract. This contract had the Corps of Engineers as the

construction manager.

Page 2 of 4

Shaw Construction, Denver, CO 07/89-03/91

Cheyenne Mountain Conference Resort, Colorado Springs, CO

Superintendent of a 26,000 sq ft two-story conference area addition to the resort. This project had

a 2 million dollar contract.

Lot 108 Condominiums, Telluride, CO

Superintendent of a four-story, stick frame structure. This project had a 2.2 million dollar contract

and one-year completion schedule.

MH Golden Company, San Diego, CA 11/87-07/89

McDonnell Douglas Office Park, Huntington Beach, CA

Superintendent of a Nine-story, steel structure 240,000 sq ft office tower on 16-acre site

development. This project had a 14 million dollar contract and a one-year completion schedule.

Children’s Hospital, San Diego, CA

Superintendent of various projects including a two-story clinical lab, complete morgue, a twenty-

bed nursery wing addition, remodel of the speech and hearing building and the intensive care unit.

Louetto Construction, Inc., Escondido, CA 06/86-10/87

Hope Elementary School, Carlsbad, CA

Superintendent of a design-build project including seven separate buildings. This project had a

7.5 million dollar contract and a one-year completion schedule.

West Village Shopping Center, Encinitas, CA

Superintendent of a 6.5 million dollar project. I was brought in after the start of this project to

troubleshoot and complete this project that was five months behind schedule.

Mellon Stuart Company, Dallas, TX 04/84-06/86

Preston Plaza, Dallas, TX

Superintendent of a 260,000 sq ft, ten-story cast-in-place concrete office tower, including 60,000

sq ft retail area, and five-story precast parking garage. This project had a 13.5 million dollar

contract and a fourteen-month completion schedule.

Sperry Computer Facility, Pueblo, CO

Superintendent of a 90,000 sq ft computer manufacturing facility with extensive electrical and

mechanical systems plus 26-acres of site development. This project had a 15.2 million dollar

contract with a one-year completion schedule.

The Ramirez Company, Houston, TX 04/83-04/84

Fire Station #74, Houston, TX

Superintendent of the construction of a new fire station. This project had a 1.2 million dollar

contract with the City of Houston as Construction Manager.

Inman Construction Company, Houston, TX 09/82-04/83

Page 3 of 4

Katy Elementary School, Houston, TX

Field Engineer of an 82,000 sq ft single-story steel structure including complete layout for all

structures, anchor bolts and total site control. This project had a 3.5 million dollar contract.

Bryan Construction Company, Bryan, TX 09/81-08/82

American Aero Crane Manufacturing Building

Carpenter Foreman: This project had a 3 million dollar contract

Armadillo Enterprises, Inc., Houston, TX 01/78-08/81

Owner/Manager of remodeling and subcontracting company

Brown & Root, Inc., Houston, TX 10/75-12/77

Journeyman pipe fitter

EDUCATION

Meramec Community College, St. Louis, Missouri

Lindbergh High School, St. Louis, Missouri

Page 4 of 4