|QUALIFICATIONS |
|Masters in Mechanical Engineering (Texas A&M May 2006) |
|Registered E.I.T in Texas |
|BS in Mechanical Engineering (Texas A&M Dec 1999) |
|SKILLS |
|ENGINEERING |
|Six Sigma Blackbelt |
|Scanning Electron Microscopy utilization |
|Mechanical Machining |
|Design and implement computer based interface for hardware based sensors |
|Initial design feasibility studies |
|Studies and simulation for fluid flow |
|Design with emphasis on ease of manufacture |
|Interaction with both the design phase and problem solving phases of manufacturing.|
| |
|Design, testing, review and analysis of new concepts |
|PROJECT MANAGEMENT |
|Supplier and Product quality plans |
|Matrix evaluation/feasibility studies for bid evaluation |
|Bid evaluation packets for project analysis |
|Project communication, tracking and updating with the use of budget and timeline |
|Estimate, budget, bid, award and supervise various construction projects |
|Coordinate activities for design, construction, permitting |
|Contractor safety inspections |
|Site work as project manager in the field |
|Submit government grant paperwork |
|SOFTWARE |
|AutoCAD 2005 |
|Minitab for statistical analysis in accordance with six sigma principles |
|MS Project timeline and resource allocations in project management and project |
|bidding applications |
|MS Excel for simulation with use of macros for project tracking and simulation |
|MathCAD for design analysis documentation |
| | |
|WORK EXPERIENCE | |
|Neuropace |January 2008- June 2011, June 2011- Currently |
|Quality Engineer |Contracting |
|Mountain View, CA |Risk management in accordance to ISO 13485 and 14971, |
| |rewrote risk management SOP (including FMECA and risk |
| |assessment), support PMA application process. |
| |Regular duties involve nonconformance dispositions, |
| |Internal and Supplier Audits, Incoming inspection |
| |procedures, vendor management, Supporting Design V&V and|
| |process V&V, Risk assessment and Management, Supporting |
| |the implementation of statistical basis for decisions. |
| |Author SOPs for risk analysis and management. |
|Stryker Endoscopy |April 2006-December 2007 |
|Quality Engineer |OEM product quality support. 3 product launches. |
|San Jose, CA |Regular duties involve nonconformance dispositions, |
| |Internal Audits, Supplier and product quality plans, |
| |Incoming inspection procedures, vendor management, |
| |Design V&V, Risk assessment, Risk Management, product |
| |launch process, Lean initiatives, 5s, CAPA for |
| |instrument design and sterilization |
|Texas A&M University |August 2005- December 2005 |
|Research Assistant |Retrofit a control and monitoring system into an older |
|College Station, TX |tribometer. |
| |Perform initial studies for feasibility of converting |
| |current system to a cryotest apparatus. |
| |Implement software based controls to allow motor speed |
| |control, heat control, monitor temperatures and friction|
| |force (Labview application). |
|Ellis Williams Engineering|August 2004- November 2005 |
|Company Engineer |AutoCAD 2005 drafting for production of pumps for |
| |drilling mud applications. |
| |Initial studies for new pumps as well as technical |
| |drawings for projects on the manufacturing floor. |
|Texas A & M University |Spring/Summer 2004 & June-July 2005 |
|Research Assistant & |Manufactured Ni-Ti drawn tubing for research use in |
|Technician - |superconducting magnets. |
|for Dr. Peter McIntyre |Member of multidisciplinary design team for |
|(Physics) |modifications of superconducting magnets at CERN with |
| |design driven by the ease of build and assembly. |
|Texas A & M University |January 2003 -December 2003 |
|Physics Machine Shop |Basic machining to assist shop as needed. |
|Student Worker |Establish drawing organization scheme for shop projects |
|Marathon Ashland Petroleum|March 2000 -August 2002 |
|LLC |Project manager for high profile, large environmental |
|Engineer/ Project Manager |rehabilitation project. Coordinated several divisions |
|- Pipeline |of the company to simultaneously work on goal. |
|Houston, TX |Communicated successfully, in writing the basis for |
| |additional funding to upper echelons of management. |
| |Provided weekly updates to key personnel and management.|
| |Performed several engineering studies on topics ranging |
| |from pipeline hydraulics to contingency plans in the |
| |occasion of line plugs or blockages. Prepared budget |
| |estimates for several construction projects ranging from|
| |small buildings and piping runs to large scale |
| |environmental rehab work. |
|Co-op Engineer/ Project |Summer 1999 |
|Management- Service |Coordinate activities for service station design, |
|Stations |construction, permitting, as well as, conducting |
|Findlay, OH |contractor safety inspections |
| |Worked with local and state officials on approval |
| |processes |
|Co-op Engineering/Project |August 1998-January 1999 |
|Management Pipeline |Project manager and inspector during bidding, |
|Houston, TX |construction, and completion phase of pipeline manifold |
| |modification. Applied company standards during |
| |construction. Problem solving in the field with a "Make|
| |it work" approach, while keeping time, human and |
| |environmental safety as the primary factors. Performed|
| |engineering studies in pipeline elevation hydraulics. |
|FMC |January1999 -November 1999 |
|Engineering Intern |Design engineering facility. CAD operations in |
|(Subsea) |Unigraphics and implementation of CAD operations into |
|College Station, TX |design process. Worked with team, which designed ball |
| |valve and authored subsequent manufacturing drawings and|
| |design documentation. |
|FMC |Summer 1998 |
|Engineering Intern |Research and Development for subsea actuators. Authored|
|(Subsea) |design documentation for actuator in development. |
|Houston, TX |Actively participated in testing and analysis phases of |
| |actuator. Worked in a design to manufacturing |
| |environment with on-site engineering and manufacturing |
| |facilities. High level of interaction between |
| |manufacturing and engineering through problem solving |
| |phases such as non-conformance reports, engineering |
| |change notices and quality assurance. |
| | |
|PUBLICATIONS |
|Sudeep P. Ingole, Sharmili Datta, Pranay Asthana, Pravansu S. Mohanty, Hong Liang |
|"Friction-Induced Phase Transformation in Nickel-Titanium Thermal Spray Coatings", |
|Materials Research Society Fall 2005 meeting, Boston, USA |
|Richard Griffin, David Zuniga, and Mili Datta, "Coating Adhesion for Mg Alloy |
|ZE41A", Magnesium Technology 2007. |
|Extrusion of a hole for tin core insertion in the subelement billet for |
|internal-tin superconductor. (with S.Datta and X. Fu), IEEE Trans. on Appl. |
|Superconductivity 15, 3430 (2004). |