Post Job Free
Sign in

Quality Engineer

Location:
Katy, TX, 77494
Salary:
70/hr negotiable
Posted:
November 15, 2012

Contact this candidate

Resume:

|QUALIFICATIONS |

|Masters in Mechanical Engineering (Texas A&M May 2006) |

|Registered E.I.T in Texas |

|BS in Mechanical Engineering (Texas A&M Dec 1999) |

|SKILLS |

|ENGINEERING |

|Six Sigma Blackbelt |

|Scanning Electron Microscopy utilization |

|Mechanical Machining |

|Design and implement computer based interface for hardware based sensors |

|Initial design feasibility studies |

|Studies and simulation for fluid flow |

|Design with emphasis on ease of manufacture |

|Interaction with both the design phase and problem solving phases of manufacturing.|

| |

|Design, testing, review and analysis of new concepts |

|PROJECT MANAGEMENT |

|Supplier and Product quality plans |

|Matrix evaluation/feasibility studies for bid evaluation |

|Bid evaluation packets for project analysis |

|Project communication, tracking and updating with the use of budget and timeline |

|Estimate, budget, bid, award and supervise various construction projects |

|Coordinate activities for design, construction, permitting |

|Contractor safety inspections |

|Site work as project manager in the field |

|Submit government grant paperwork |

|SOFTWARE |

|AutoCAD 2005 |

|Minitab for statistical analysis in accordance with six sigma principles |

|MS Project timeline and resource allocations in project management and project |

|bidding applications |

|MS Excel for simulation with use of macros for project tracking and simulation |

|MathCAD for design analysis documentation |

| | |

|WORK EXPERIENCE | |

|Neuropace |January 2008- June 2011, June 2011- Currently |

|Quality Engineer |Contracting |

|Mountain View, CA |Risk management in accordance to ISO 13485 and 14971, |

| |rewrote risk management SOP (including FMECA and risk |

| |assessment), support PMA application process. |

| |Regular duties involve nonconformance dispositions, |

| |Internal and Supplier Audits, Incoming inspection |

| |procedures, vendor management, Supporting Design V&V and|

| |process V&V, Risk assessment and Management, Supporting |

| |the implementation of statistical basis for decisions. |

| |Author SOPs for risk analysis and management. |

|Stryker Endoscopy |April 2006-December 2007 |

|Quality Engineer |OEM product quality support. 3 product launches. |

|San Jose, CA |Regular duties involve nonconformance dispositions, |

| |Internal Audits, Supplier and product quality plans, |

| |Incoming inspection procedures, vendor management, |

| |Design V&V, Risk assessment, Risk Management, product |

| |launch process, Lean initiatives, 5s, CAPA for |

| |instrument design and sterilization |

|Texas A&M University |August 2005- December 2005 |

|Research Assistant |Retrofit a control and monitoring system into an older |

|College Station, TX |tribometer. |

| |Perform initial studies for feasibility of converting |

| |current system to a cryotest apparatus. |

| |Implement software based controls to allow motor speed |

| |control, heat control, monitor temperatures and friction|

| |force (Labview application). |

|Ellis Williams Engineering|August 2004- November 2005 |

|Company Engineer |AutoCAD 2005 drafting for production of pumps for |

| |drilling mud applications. |

| |Initial studies for new pumps as well as technical |

| |drawings for projects on the manufacturing floor. |

|Texas A & M University |Spring/Summer 2004 & June-July 2005 |

|Research Assistant & |Manufactured Ni-Ti drawn tubing for research use in |

|Technician - |superconducting magnets. |

|for Dr. Peter McIntyre |Member of multidisciplinary design team for |

|(Physics) |modifications of superconducting magnets at CERN with |

| |design driven by the ease of build and assembly. |

|Texas A & M University |January 2003 -December 2003 |

|Physics Machine Shop |Basic machining to assist shop as needed. |

|Student Worker |Establish drawing organization scheme for shop projects |

|Marathon Ashland Petroleum|March 2000 -August 2002 |

|LLC |Project manager for high profile, large environmental |

|Engineer/ Project Manager |rehabilitation project. Coordinated several divisions |

|- Pipeline |of the company to simultaneously work on goal. |

|Houston, TX |Communicated successfully, in writing the basis for |

| |additional funding to upper echelons of management. |

| |Provided weekly updates to key personnel and management.|

| |Performed several engineering studies on topics ranging |

| |from pipeline hydraulics to contingency plans in the |

| |occasion of line plugs or blockages. Prepared budget |

| |estimates for several construction projects ranging from|

| |small buildings and piping runs to large scale |

| |environmental rehab work. |

|Co-op Engineer/ Project |Summer 1999 |

|Management- Service |Coordinate activities for service station design, |

|Stations |construction, permitting, as well as, conducting |

|Findlay, OH |contractor safety inspections |

| |Worked with local and state officials on approval |

| |processes |

|Co-op Engineering/Project |August 1998-January 1999 |

|Management Pipeline |Project manager and inspector during bidding, |

|Houston, TX |construction, and completion phase of pipeline manifold |

| |modification. Applied company standards during |

| |construction. Problem solving in the field with a "Make|

| |it work" approach, while keeping time, human and |

| |environmental safety as the primary factors. Performed|

| |engineering studies in pipeline elevation hydraulics. |

|FMC |January1999 -November 1999 |

|Engineering Intern |Design engineering facility. CAD operations in |

|(Subsea) |Unigraphics and implementation of CAD operations into |

|College Station, TX |design process. Worked with team, which designed ball |

| |valve and authored subsequent manufacturing drawings and|

| |design documentation. |

|FMC |Summer 1998 |

|Engineering Intern |Research and Development for subsea actuators. Authored|

|(Subsea) |design documentation for actuator in development. |

|Houston, TX |Actively participated in testing and analysis phases of |

| |actuator. Worked in a design to manufacturing |

| |environment with on-site engineering and manufacturing |

| |facilities. High level of interaction between |

| |manufacturing and engineering through problem solving |

| |phases such as non-conformance reports, engineering |

| |change notices and quality assurance. |

| | |

|PUBLICATIONS |

|Sudeep P. Ingole, Sharmili Datta, Pranay Asthana, Pravansu S. Mohanty, Hong Liang |

|"Friction-Induced Phase Transformation in Nickel-Titanium Thermal Spray Coatings", |

|Materials Research Society Fall 2005 meeting, Boston, USA |

|Richard Griffin, David Zuniga, and Mili Datta, "Coating Adhesion for Mg Alloy |

|ZE41A", Magnesium Technology 2007. |

|Extrusion of a hole for tin core insertion in the subelement billet for |

|internal-tin superconductor. (with S.Datta and X. Fu), IEEE Trans. on Appl. |

|Superconductivity 15, 3430 (2004). |



Contact this candidate