STAN HAYES, JR.
**** *.*. ***** ***. Telephone: 360-***-****
Vancouver, WA 98683 Email: ***********@*******.***
OBJECTIVE: To obtain a position a General Superintendent utilizing my experience and expertise in construction coordination, scheduling and project management.
HIGHLIGHTS OF QUALIFICATIONS:
• Managed multimillion-dollar projects and ensured cost effective on-time completion of all deliverables.
• Managed 38 projects, totaling more than one billion in construction costs.
• Proven history of providing effective coordination, scheduling and management of construction projects.
• Highly reliable and resourceful in supervising sub-contractors.
• Tracked record of staying within budget and completing project on or ahead of time.
• Maintained an organized job site, including the construction office.
• Ensured that all company employees and contractors are adhering to the company safety policies.
• Promoted site safety, encourage safe work practices and rectifies job site hazards immediately.
PROFESSIONAL EXPERIENCE:
• Managed all field operations, supervised all sub-contractors.
• Reviewed and approved shop drawings, submittals, forwarded to field personal.
• Developed master schedule and three-week look-ahead schedules to include crew and task progress, direct crews and sub-contractors.
• Update monthly schedules of values and billing input.
• Conducted weekly sub-contractor coordination and progress meetings.
• Updated weekly labor budget for tracking of direct field operations and master schedule.
• Order equipment, materials and labor forces for field operations.
• Detail and set-up each new field operation, such as form systems, construction joints, rebar layout, door
and window installation, structural steel layout, framing operations, building exterior finishes, finish work and hardware installation.
• Developed inspection sign-off sheets for each section of work progress and obtained sub-contractor
signoffs before covering up any related work.
WORK HISTORY:
2005-2009 General Superintendent Andersen Construction, Portland, OR
Lovejoy Block I / Safeway, Portland, OR
Kohler Pavilion OHSU Hospital, Portland, OR
2003-2005 General Superintendent Dolan Construction, Irvine, CA
Sepulveda Storage, Van Nuys, CA
Hazel Dell Towne Center, Vancouver, WA
2002-2003 General Superintendent Silco Construction, Portland, OR
Lower Columbia College, Longview, WA
1999-2002 General Superintendent PCS Companies, Seattle, WA
OPUS IV, Seattle, WA
Fred Meyers, Ballard, WA
Sea-Tac II, Sea-Tac III, Hotels
1997-1999 General Superintendent Swinerton Incorporated, Portland OR, Fred Meyer Corp. Office & Legacy Hospital
MAJOR ACCOMPLISHMENTS:
LOVEJOY BLOCK I / SAFEWAY, PORTLAND, OR
Implemented and oversaw building of a 2,000 piece precast hybrid movement frame structure with double “T’s” and hollow core panels. This proto type building had never been built before. Erection was done with a tower crane due to downtown full square block site location which was extremely limited for staging area. This also included all the tenant improvements for other floors.
KOHLER PAVILION HOSITAL, PORTLAND, OR
Implemented and oversaw construction of building and civil work including a precast bridge and all site work. Oversaw installation of site artwork and statues, designed all seismic connections.
HAZEL DELL TOWNE CENTER, VANCOUVER, WA
Implemented and oversaw storm water filtering system using Chitosan treatment which was only the second time approved by the State of Washington Dept. of Ecology. This system filtered storm water runoff and underwater dewatering from a 42-acre site during heavy rain conditions for five months. A total of three million gallons of water were treated and discharged into Clark County storm system with their approval. This system was to correct the design of the Storm Water Run-off Plan, which would not function because of the type of fine soil.
• Supervised installation of four intersections of new traffic signals, upgraded fifth intersection with tie-ins, and updated Fire Dept. signals.
• Supervised installation of all civil underground utilities, sewer, water, natural gas, power supply, telecommunications and storm water system with on-site filtering system.
• Cement treated complete site and County roadways for stabilization of grade.
• Supervised installation of 280’ by 180’ 96” detention system 28’ below finish site grade.
• Coordinated relocation of Pacific Corp. high voltage power transmission metal towers, Clark County Public power grid with telecommunication overheads services and Bonneville fiber feeds to their sub-station.
FRED MEYER CORP. OFFICE STRUCTURE, PORTLAND, OR
Performed all General Superintendent duties of scheduling, coordination, and oversaw all field personnel.
ALTA SIERRA MIDDLE SCHOOL, CLOVIS, CA
Performed all duties of Project Manager in addition to all General Superintendent functions. Project was a prototype setup at Swinerton Walberg to cut overhead costs consisting of 27 buildings on 39 acres. Drew up master Schedule and achieved a $450,000 motivation bonus for reducing an 18-month schedule by six months. Buildings were wood framed with 1,000,000 board feet of lumber.
CALIFORNIA STATE PRISON, MADERA, COUNTY BID PACK #5, MADERA, CA
• Achieved a three-month reduction in a 15-month schedule.
• Coordinated 19 buildings on 600 acres.
• Coordinated deliveries of all building materials from staging area up to a mile away from their installation location. (I.E. 2,700 doorjambs, 2,200 windows, 2,800 trusses).
• Coordinated with up to fifteen other General Contractors onsite during their bid pack contract work.
• Coordinated up to 475 tradesmen and five superintendents under me during our own bid pack contact work.
• Coordinated up to three concrete pumps on site at a time and placed 12,000 yards of concrete in a two month period.