Post Job Free
Sign in

Engineer Project Manager

Location:
Texas
Salary:
90,000 to 100,000 Per year
Posted:
August 17, 2011

Contact this candidate

Resume:

Herman H. Vest

Phone: 409-***-****

Email: ******@*****.***

________________________________________

OBJECTIVE:

I am seeking a Sr. Project Engineer position performing project installations.

ACHIEVEMENTS:

•Developed Auto Sketch drawings of site Utility & WTP distribution systems up to each unit’s block limits. These Auto Sketch drawings were used later to develop or update the official distribution drawings on Micro Station.

•Developed computerized hydraulic models on PipeNet for all Utility & WTP site-piping systems.

•Accurately stated necessary expansions to site distribution systems for the inclusion of new and expanded units on site.

•I reviewed modifications to the site firewater system to ensure compliance with insurance carrier and NFPA guidelines.

•Worked within a team to plan and estimate piping modifications and equipment necessary for a $1.2M Utility & WTP distribution system expansion. Expansion was necessary to support the installation of a new unit on site. System performed as required when complete.

•Approver for modifications to Utility & WTP distribution system piping and drawings.

•Participated on team to develop initial project plan for site energy reduction initiative using data collected by assigned team members. The site energy savings expected is $2M per year.

•Suggested modification while participating on site storm water team that resulted in savings of $1M when the project was installed in 2004 and 2005.

•Installation of a $2.5 million Regenerative Thermal Oxidizer for destruction of residual hydrocarbons.

•Installation of a 120 ft flare with new vent header system and utility headers.

EXPERIENCE:

GOODYEAR TIRE AND RUBBER

Technology Engineer (Production Engineer) 2009 to 2011

Ran various spreadsheets daily to maintain and document production to include First Pass Prime, In Process, Plant Clean Up , and Off Spec rubber. Reduction of energy use while maintaining quality and production quotas. Work with operations to maintain systems in the process and finishing building areas.

Technical Engineering Services 2005 to 2009

Primary responsibilities as project engineer/manager include: operations support, analysis, design , and installation of projects for the plant. Working with onsite and offsite designers to ensure P&ID's and construction drawings were complete and up to date when the project was installed and started up. I have performed estimates, time line schedules, drawing checks, ensure MOC is documented and complete. I have used SAP and AutoCAD at both BASF and Goodyear.

Projects include, cooling water header systems, steam header systems, a 120 foot flare and all required utility headers , knock out pots, pumps, pipe racks, and installation of a Regenerative Thermal Oxidizer. These projects ranged from $50,000 to $2,500,000.

Herman H. Vest

Phone: 409-***-****

Email: ******@*****.***

________________________________________

BASF 1990 to 2004

Technical Engineering Services (Utilities Plant/Water Treatment Plant)

Primary responsibilities as project engineer/manager include: operations support, analysis of projects affecting utility site systems, and capital projects.

Perform as team leader on capital projects from front-end development to successful closure. Projects performed as primary engineer range from $10,000 to $2,000,000. These projects include the installation of new air compressors, temporary boilers, generators, pumps, pipe racks, upgrades to compressor and boiler controls, continuous emission monitoring systems, modifications within WTP, and many header systems. I assisted as both operations and engineering support on a $52,000,000 Gas Turbine Cogeneration Plant installation.

Responsible for development of computer aided hydraulic models and primary contact for the Utility & WTP site distribution systems.

Trained as PSM Auditor in 1993 and performed at least one internal audit per year while with BASF.

Programs used in performance of duties include: SAP R/3, Word, Excel, PowerPoint, Suretrac Project Manager 2.0, AutoDesk (Auto Sketch), Powerdraft, and PipNet

Texaco 1980 to 1985 (Oil/Water Separation Group)

In this position, my duties were two-fold. While in the research facility, I used varied analytical equipment for group research projects. Secondly, I traveled to field locations to solve various oil/water separation problems, as well as trouble shooting the production unit if necessary.

U. S. Army – 3 years active duty Attended Primary Non-Commissioned Officers Course

EDUCATION:

New Mexico State University (NMSU) 1990

Las Cruces, New Mexico

Bachelors Of Science Chemical Engineering

ENMU-R

Roswell, New Mexico 1980

Associate of Applied Science Petroleum Production Technology

Attended the following courses presented by Global Power Generation Services for GE Power Systems in 1998.

Fundamentals of Gas Turbine Construction and Maintenance

Fundamentals of Gas Turbine Construction and Operation



Contact this candidate