Post Job Free
Sign in

Manager Supervisor

Location:
Qatar
Posted:
May 25, 2015

Contact this candidate

Resume:

Manoj Poojary

Krishna Bettu,

Kowdoor, Bailoor Post,

Karkala Taluk, Udupi District,

Karnataka.

PHONE: +974-********

E-mail: ************@*****.**.** *************@*****.***

Passport No.: G0385168

OBJECTIVE:

To be associated with a rapidly growing organization with global reach where I can utilize my operational and special skills to produce time bound exceptional results.

PERSONAL INFORMATION: MANOJ POOJARY

Date of Birth : 20th May 1982

Father’s Name : KRISHNA POOJARY

Marital Status : Single

Nationality : Indian

Religion : Hindu

Driving License : Holding LMV Indian, Saudi Arabia & Qatar

Language Known : English, Hindi, Kannada, Tulu and Tamil

EDUCATION QUALIFICATION:

Year School / College Board /University Course

1997 GPUC, Bailoor Karnataka Secondary Education SSLC

1999 GPUC, Bailoor Dept. of Pre University Education PUC

2005 Sri Niranjan Swamy Poly Technic, Bajpe Bangalore Diploma

(in Mechanical)

2011 C.V. Raman University C.V. Raman University Bachelor of Commerce

ADDITIONAL QUALIFICATION:

Year Name of the Institution Course contents

2002 Megatech Computer Education Center 3 months course in (IASC) Intergrated (Advanced Software Course.) (Windows, MS-Word, MS-Excel, DOS, Auto CAD)

RELEVANT EXPERIENCE :

Working as a Logistics Cooridinator in Habtoor Leighton Group ( HLG) at Qatar Feb 24th 2012 to till date.

Job Handled:

1 Coordinate transportation of material to designated areas for storage or material handling areas. •

2 Identify materials weight/size and position correctly for movements by crane or Tele handler

3 Coordinate with crane crew for size and weight of material for handling •

4 To arrange the transportation of manpower (to and from the site) in order to ensure that the manpower arrives on site as per the production schedule without any interruption to the construction program. •

5 To ensure the timely removal of wastes from the site in order to avoid health and safety issue and any delay in construction program that caused by the wastes. •

6 To arrange and monitor the construction equipments and machineries on site as per daily requirements in coordination with the plant and transport department in order to avoid any delay in production caused by unavailability.

7 Controlling Tower crane operators, Riggers, Mobile crane operators, Heavy Equipment operators and Labors

8 Prepare the time sheet Rental equipments and tower cranes and hand over to commercial department

9 Mobilization and allocation of machines and heavy equipments to the site’s staff

10 Coordination of banks men and riggers for each machine

11 Maintain in proper conditions the amenities for labors and develop them during the progress of construction.

12 Organization of storage areas (Steel yard, scaffolding yard,…)

13 Develop and maintain the conditions of the roads and pedestrians

Working as a Transport, Stockyard & Loading supervisor in AL ABNIAH Precast (Tilt & hollow core) Company Ltd at Saudi Arabia Dec 5th 2010 to Feb 10th 2o12.

Job Handled:

1 Coordinate arranges proper & safe delivery of precast components between factory and Site and accordance to site requirements regulation.

2 Follow up with site in charge delivery preference and report back action

3 Follow up casting and curing details from production in PIMS system and check availabilities of precast components with production planning

4 Ensure precast components are released from factory only after the completion of the curing period or only after obtaining the approval for early release of product

5 Ensure correct flow and distribution of relevant documents for delivery.

6 Ensures any required permission (police or other ) for the delivery is valid

7 Ensure availability at the right time transport equipment and drivers according to delivery requirement.

8. Preparing in due time, the daily loading program for stock yard /loading In charge

9 Report scheduled and actual delivery on daily basis to production planning department and production manager

10 Follow up delivery notes in PIMS system on daily basis

11 Allocating work for transport foreman and coordinate jobs for the drivers and operators.

12 Report daily delivery matters to production Manager.

13 Coordinate service department and maintenance department about vehicles maintenance.

14 checking all the hired and own vehicles /drivers time sheet and delivery notes and submit to account department on weekly basis

15 Ensure that the fleet of transport equipment and drivers at all the time is in accordance with the requirements and arrange hire and off hire in due time as per the agreements.

16 Arrange the proper stock finished goods (Tilt & Hollow core) as a project wise at stock yard.

17 Coordinate finishing foreman about proper finishing & repair elements before delivery

18 Coordinate Q C department for checking the elements before delivery

Working as a Transport & Stockyard Loading Foreman in BINA ADVANCED CONCREET PRODUCTS Company Ltd from June 25th 2008 to Oct 7th 2010 at Saudi Arabia

Job handled:

1 Supervising workers in a shift like as Drivers, riggers, masons, operators etc

2 Coordinating with planning manager for load out programs.

3 Collecting daily production data and checking the products for any damages.

4 Responsible to store the concrete products in stock yard according to size & project to which they are allocated.

5 Loading vendor trailers safely to avoid damages to concrete blocks as well as for trailers.

6 Controlling moving equipments like as Trailers, Tippers, Shawls, Forklift, Mobile cranes, over head cranes, pick ups, buses & ensuring periodic maintenance, service, repairs, insurance & fuel filling etc. is done within correct time.

7 Coordinating with Quality department to ensure right equipments before loading the trucks.

8 Taking care of workers safety & guiding them to wear proper PPE

9 Preparing delivery tickets for materials loaded to sites & handing over to supervisor on daily basis.

10 Coordinate planning department about erection program in advance

11 Coordinate erection engineers about their erection sequence in advance

RELEVANT EXPERIENCE :

Working as a Senior Yard Foreman in Petro serve Limited on contract with Ras Gas Drilling & Completion Warehouse (Oil & Gas Company) from 20th Aug. 2007 to 20th April. At Doha Qatar

Job Handled:

1. Controlling around 175 workers in a shift.

2. Planning of loading the equipments to trucks and then onto supply boats for dispatching offshore rigs within the schedule.

3. Coordinating with office staff to ensure daily load-outs.

4. Supporting eight Offshore Rigs & one Land Rig.

5. Relieving Port Foreman on his day off’s by taking care of cargo loading, bulk & fuel pumping to the boats.

6. Responsible for timely maintenance of machineries such as mobile cranes, forklifts, generators, pressure washers etc.

7. Responsible for Worker safety. Nominating crews for safety trainings which will be organized every month.

8. Submitting day to day reports to supervisor like man hours, machine hours, load-out details, fuel consumption and maintenance did etc.

9. Ensuring housekeeping at work premises.

10. Distributing crews to work on two shifts depending on work load.

11. Ensuring all the lifting equipments are certified they lifted to move around.

12. Coordinating with supervisor to organize quarterly inspection of lifting gears such as slings, chains, cargo baskets & containers etc.

13. Coordinating with supervisor to procure correct tools required for daily operations.

14. Responsible to provide a detent report on incidents occurred during shift to safety department.

• Sole in-charge of the Bulk Plant house-keeping.

Working as a Shift Supervisor in NEW MANGALORE PORT TRUST., Mangalore, which deals with large scale imports & exports in India from 1st June 2005 to 10th Aug. 2007 in India

JOB HANDLED:

1. Supervising around 150 labors per shift.

2. Maintaining proper stock of Iron Ore (For Export Min. Qty is 40,000 tons) and taking care of loading and unloading of the same.

3. Checking the weight of cargo (Tipper wise) before and after loading and unloading.

4. Supervising the loading and unloading of Iron Ore, Rise, Groundnut, Timber, Granite, Coke etc to ship.

5. Maintaining Proper Time Records for Various Hires Machineries like JCB, Hitachi, Tippers, and Cranes Etc.

6. Effectively using wastage handling methods for Precious products Like coke etc. to minimize the loss.

7. Efficiently handling Machine Breakdown by keeping necessary spare parts in stock, and keeping sufficient stock of fuel etc. to reduce the machine idol period and the loss of time and money.

8. Supervising the staff welfare like - Providing refreshments and lunch in due course.

9. Providing Shift wise Tonnage of loading and unloading to the office.

10. Preparing Trip wise details of Tippers along with Number. Of drivers, conductors etc.

11. Shift distributing the labors to run the job smoothly and effectively.

12. Submitting shift wise detailed report to the office in time.

Worked as a Trainee in Canara Engineering Baikampady Mangalore 6 months. (Dec. 18/2002 to May 17/2003] Working as a Fitter In that Period We are Conducting Assembly of. Condenser.

Working at Cafe Coffee Day in Bangalore as Maintenance Executive 3 Months (July 14/2003 to Oct. 13/2003) where I was Conducting Assembly of Coffee Machine.

HOBBIES

Sports - Athletics, Cricket, Volleyball, Swimming, Reading news papers & magazines, Internet Browsing.

Date : Manoj Poojary

Place : Qatar +974********



Contact this candidate