Post Job Free
Sign in

Power Plant Manager

Location:
Greer, SC, 29651
Salary:
80000
Posted:
June 11, 2011

Contact this candidate

Resume:

Gerard P. LaBarge

** **** ****** **.

Greer S.C. 29651 407-***-****

***********@*******.***

OBJECTIVE:

To seek a challenging position in the safety field, where my

experience would lend valuable application to an organizations

HSE program.

WORK HISTORY:

BMW Spartanburg Automotive Assembly Plant- 9/2010- Present

Greer, South Carolina

Logistics Associate- Provide line side delivery of automotive parts to the door line.

Graver Tank Co./ Trillium- 8/2010-9/2010

Haverhill North Coke Co. Stack erection/ demo.

Franklin Furnace, Ohio

Safety Supervisor- Oversee HSE policies for company and client for demolition of existing exhaust stack and erection of new 200’ stack at the Haverhill facility.

Meyers Engineers/ BP- 6/4/2010-8/20/2010

BP Deepwater Horizon Response- MS Canyon 252

Pensacola, FL- Gulf of Mexico

Safety Observer/IH- Patrol strategic areas of the Gulf to provide support to vessels in the Vessels of Opportunity program. This includes air quality monitoring, oil spotting and safety assurance and support.

Aker Solutions- 1/2010-5/2010

Progress Energy-Crystal River ESP Rebuild,

Crystal River Power Plant, Crystal River FL.- Shutdown, Rebuild

HSE Manager/Trainer- Oversee and implement Aker and OSHA safety regulations on a Progress Energy power plant facility in Crystal River Fl.

Conducted new employee orientation and other specialized training such as Confined Space, LOTTO, Environmental and other training specific to the needs of the project. In addition, also conducted weekly safety audits.

Procedures Initiated and Overseen:

Scaffold Plan- Inside and around the Electrostatic Precipitator.

Fall Protection- Inside, on and around the Electrostatic Precipitator.

Confined Space-For working inside Electrostatic Precipitator.

Lockout-Tagout- For working inside and on Electrostatic Precipitator.

Critical Lift Plans- For Removing and Loading Modules in the ESP.

Spill Prevention Control & Countermeasures

Aker Solutions- 3/2008-12/2009

Gulf LNG Clean Energy Project,

Pascagoula, MS. New Construction

HSE / Environmental Manager- Oversee and implement Aker and OSHA safety regulations on a new Liquid Natural Gas terminal in Pascagoula Ms. for Gulf Energy.

Also managed environmental policy in accordance with the Federal Energy Regulatory Commission who was the governing authority on that site.

In addition, also coordinated and conducted weekly safety audits.

Procedures Initiated and Overseen:

Scaffold Plan- Around and Inside LNG Tanks, Pipe Racks, etc.

Fall Protection-Tanks and other Structures associated with the Project.

Excavation and Trenching- Underground Plant Water Piping, Firewater Water Piping, Sumps and Electrical Utilities.

Confined Space- Tanks, Vessels and Sumps.

Lockout-Tagout- Temp Power Installation, Plant Process System Componets.

Spill Prevention Control & Countermeasures

Storm Water Pollution Protection Program

Burns and McDonnell- 5/2007-3/2008

GRU Utility Plant for Shands Hospital,

Gainesville, FL. New Construction

Site Safety Manager- Oversee and implement Burns and McDonnell HSE policies on site for a new utility plant( chill water, electric, etc.) for Shands Hospital in Gainesville, Fl. Conducted new employee orientation.

Procedures Initiated and Overseen:

Fall Protection-Utility Plant Erection.

Excavation Procedure- Deep Underground Utility Corridor.

Lockout –Tagout- Installation and Commissioning of

Plant Equipment.

Aker Solutions- 11/2005-5/2007

Cameron LNG Project,

Hackberry, LA. New Construction

Safety Supervisor / Environmental Manager- Oversee and implement Aker and OSHA safety regulations on a new Liquid Natural Gas terminal in Hackberry, La for Sempra Energy. Managed environmental policy in accordance with the Federal Energy Regulatory Commission who was the governing authority on that site. SPCC and SWPPP plans were developed and initiated. In addition, also coordinated and conducted weekly safety audits.

Procedures Initiated and Overseen:

Fall Protection- LNG Tanks and other structures.

Confined Space- LNG Tanks, Sumps

Excavation and Trenching- Underground Utilities, Sumps

Lockout-Tagout- Temporary Power Installation, Plant Components Installation and Testing.

Spill Prevention Controls & Countermeasures

Storm Water Pollution Protection Program

Scaffold Plan- Around and Inside LNG Tanks, Pipe Racks, etc.

Respiratory Program- For Welding Materials Containing Hexavalent Chromium( OSHA 29 CFR 1926.1126 % 1910.1026)

Tepsco Inc.- 8/2004-11/2005

Florida Power and Light- Meter Station,

Indiantown FL.- New Construction

Air Liquide Cold Box Restoration,

Orlando FL.- Rebuild

Hess Oil- Piping and skid installation,

Erath LA. -Add On

Conoco Phillips- Piping for new flare,

Sweeney, TX- Add On

Site HSE Supervisor. - Oversee and implement Tepsco and OSHA regulations at these facilities working closely with client policies and answering directly to the corporate safety director for Tepsco.

Conducted new employee orientation, fire watch training, confined space training and any other training specific to the needs of the sites.

Procedures Initiated and Overseen:

Fall Protection- Pipe Racks and other Structures.

Confined Space- Cold Box Rebuild. (Air Liquide)

Excavation and Trenching- Underground Utilities, Sumps and Gas Pipeline.(FP&L)

Lockout-Tagout- Temporary Power Installation, Meter Station Components Installation and Testing.(FP&L)

Hot Work Permitting- Conoco Philips Refinery.

Fagen Inc.- 6/2004-8/2004

Philip Morris Electrical Upgrade

Concord, NC.-Add On and New Construction

Safety Director- Oversee and implement Fagen and client safety policies for electrical upgrade work and new electrical installation for the Philip Morris cigarette plant in Concord NC. Conducted new employee orientations and daily safety meetings. Answered directly to the corporate safety director.

Procedures Initiated and Overseen:

Fall Protection- Automated Warehouse Racks and other Structures.

Lockout-Tagout- Temporary Power Installation, Switch Gear Upgrades.

Excavation and Trenching- Underground Utilities.

Aker Solutions- 7/2002-6/2004

Calpine Osprey Power Project,

Auburndale FL.- New Construction

Safety Inspector- Working in the field on a new power plant project (HRSG) to insure that safety policies are being observed and making corrections when necessary. Conducting weekly safety audits, providing topics for weekly safety meetings. Answering directly to site safety manager.

Procedures Initiated and Overseen:

Confined Space- Sumps, Inside HRSG’S, Underground Duct Banks.

Lockout-Tagout- Temporary Power Installation, Plant Components Installation and Testing.

Fall Protection- Pipe Racks and other Structures.

Excavation and Trenching- Underground Utilities, Sumps

Foster-Wheeler Constructors-2000-7/2002

Sanford Repowering Project, Sanford, FL.

Welder

Remainder of work history upon request.

Education:

Bay Path Vocational Technical School

Charlton MA.

Metal Fabrication and Welding

UMASS-Beverly MA. Campus

Foundations for Occupational Education

Certifications:

CSST- Construction Site Safety Technician

Competent Scaffold Person

Certified Vocational Welding Instructor-Massachusetts

Certified Vocational Welding Instructor-Florida

Basic First Aid and CPR

TWIC Card

OSHA 40 Hour HAZWOPER

OSHA 30 HOUR

Qualifications and Training:

Experienced in construction, power plant construction and outage work, industrial fabrication, and vocational education with a strong emphasis on safety.

Behavioral Based Safety Observer.

Developed safety programs, manuals, bulletins and training materials.

Incident investigation and root cause analysis.

First aid and CPR.

Educational Employment:

North Shore Regional Vocational Technical School

Beverly MA.

Welding and Metal Fabrication Instructor.

Mid Florida Technical Institute

Orlando, FL

Welding Instructor.

References :

David Eng- Aker Solutions Corporate Safety Director.

979-***-****

Mike Meyers-Medic, co-worker

337-***-****

Dave Jackson-Burns and McDonnell Project Manager

816-***-****

John Glenn- Medic, co-worker

813-***-****

John Buentello-Baker Concrete Safety Supervisor

281-***-****

Donnie Passman-Aker Solutions HSE Site Manager

281-***-****



Contact this candidate