Post Job Free
Sign in

under ground utilities lead man/ pipe layer

Location:
Fontana, CA, 92337
Posted:
September 08, 2009

Contact this candidate

Resume:

Thomas Lorberter

**********@*****.***

***** ******* ** ******* **, 92337

909-***-****

909-***-****

***** ******** **

Alta Loma CA 91701

Executive Summary:

•

Well-organized and efficient.

•

Work well in a high pressure environment.

•

Self-motivated and assertive.

•

Excellent professional references available upon request

Experience:

Excel Commercial

Constructors

pipelayer

1605 Grand AVE ste #2 San Marcos, Ca 92069 760-***-****

10/15/2008 to 6/07/2009

•

Executed daily operations (layed pipe, water, sewer ,stormdrain all different types).

•

Checked slope, using carpenter's level and lasers.

•

Tapped and drilled holes into pipe to introduce auxiliary lines and devices.

•

Dug trenches to desired and required depth by hand and using trenching tool.

•

Covered pipe with earth and other materials.

•

Graded and leveled base of trench, using tamping machine and hand tools.

Oliva Engineering INC6440 Carol Ave, Rancho Cucamonga, ca 91701, 951-***-****

pipelayer 4-28-2008 to 10-10-2008

•

Checked slope, using carpenter's level and lasers.

•

Tapped and drilled holes into pipe to introduce auxiliary lines and devices.

•

Covered pipe with earth and other materials.

•

Graded and leveled base of trench, using tamping machine and hand tools.

MGM Construction Enterprises, 41725 Elm St. Suite 201 Murrieta CA, 92562

Inc 760-***-****

Pipelayer 10-2005 to 03/18/2008

•

Laid out route of pipe, following written instructions and blueprints.

•

Executed daily operations.

•

Checked slope, using carpenter's level and lasers.

Under ground sewer,water,and storm drain installation.

•

Tapped and drilled holes into pipe to introduce auxiliary lines and devices.

•

Was instrumental in daily production.

•

Dug trenches to desired and required depth by hand and using trenching tool.

Thomas Lorberter

Page 2

•

Trained and managed several employees and achieved significant improvements in

their productivity.

•

Covered pipe with earth and other materials.

•

Trained new employee's in pipe line operations.

•

Graded and leveled base of trench, using tamping machine and hand tools.

•

Laid pipes in trenches and silver sauader, cemented, glued and otherwise

connected pieces together.

•

Successfully managed a four man crew in the daily operations.

•

Successfully handled Stressfull environments.

West Cost Under ground858-***-****

Lead man / Pipelayer

San Diego CA

09/04/2001 to 09-2005

Education:

References: Available upon request



Contact this candidate