Post Job Free

Resume

Sign in

Manager Power Plant

Location:
Moss Point, MS, 39562
Salary:
US $156,000
Posted:
June 16, 2012

Contact this candidate

Resume:

CLAYTON ELY

QA/QC Manager--Construction Manager

228-***-**** Home 228-***-**** Cell

Summary:

• Site Preparations, Site Logistics, Management Programs, Safety Programs, Quality Control Programs and Document Control Programs acceptable to the Client, US Gov’t and governing jurisdictions

• Coordinate Construction and Maintenance Activities with the Client and Sub-Contractors

• Vendor Inspections-Material Receiving Inspections-QC Lab testing-NDE testing-IMTE maintained

• Site monitoring and coordinating of all Construction efforts and phases to include Heavy Civil--Roads-- Buildings Infrastructures Railroad Refurbishment-- Concrete Placements-- Electrical installations above and below ground-- Mechanical to include equipment setting and testing-- Piping installations above and below ground and review and assure construction efforts are per drawings, specifications and contract

• Initiate, train and manage multicultural Construction and QC Teams

• Lead Auditor Training--Perform Audits of Contract Adherence, Sub-Contractor QC Plans and work performance. Implement and monitor corrective actions.

• Established Concrete Mix Designs

• Welder testing and qualification per Sect IX or governing code

• Direct repair, testing, documentation and inspections of ASME Sect VIII Vessels, ASME Sect I, B31.3 and B31.1 weld inspections and documentation. API 650 and API 620 Tanks.

• Initiate Pipe and vessel Integrity Programs through scheduled UT or various NDE examinations and testing

• Assist Field and Support Teams in NCR tracking and quick resolutions.

I am a highly motivated, site oriented results-focused QA/QC Manager. I possess strong leadership and successful team building capabilities and excellent communication, client service and people skills. Resourceful problem solver with proven ability to bring quick resolution to challenging situations as well as build lasting relationships with site supervision and client.

Experience:

SR QA Manager---Iron Ore Mine Construction---Lunsar, Sierra Leone---May 1, 2011 to Nov 28, 2011

London Mining Company (LMC)---Contract

Initiated QA/QC Manual, QC Plan and Site Specific Procedures to include Inspection and Test Plans (ITP’s). Monitored and assisted LMC and LMC Contractors during the installation of all equipment and Construction phases to assure Site Specific QC plans, ITP’s, examinations, testing and required documentation were performed and accepted by Client. Mine Ore Process Plant and Diesel Fuel Combined Cycle Power Plant.

QA/QC Site Manager---Power Plant Construction---Guarenas, Venezuela---Jun 1, 2010 to Mar 2011

Pro Energy Services (PES)---Contract

Closely monitored all construction installations to include Civil, Structural, Mechanical, Piping, Equipment, Electrical and Instrumentation to assure the drawings, specification and contract was represented. Assisted and supported the construction efforts and safety efforts throughout the phases of construction and installation of 2 (two) LM6000 and 2 (two) LM2500 Gas fueled Turbine Generator Power Plants.

SR QA Site Representative---Levee Repair and Improve---New Orleans, Louisiana---Mar 1 to May 25, 2010

URS Corporation---USACE---Hourly

Oversee Contractors repairing and improving Levee surrounding the city of New Orleans. USACE specifications and drawings. Liaison between URS, Contractors and USACE.

Site Project Coordinator---Fossil Fuel Power Plant Turn Around---Pensacola, Florida---Oct 5 to 13 Nov 2009

Coordinated Time and Material Hard Dollar Contracts to assure all material, personnel, equipment, demolitions, replacements, repairs, and installations were per the contract, jurisdictional codes, specifications and drawings. Coordinated all Contractors and Sub-contractors and worked closely with each to assure their needs were met in order to complete job assignments within schedule and within budget. Contractors replaced and/or installed new inline Hand Valves and Actuated Operated Valves up to 24”. Installed electrical conduit and cable. Removed and replaced ash hoppers and associated steel structure. Removed and replaced all Level Indicators and Transmitters. Established Safety meetings with Contractors and Sub-contractors. Monitored all installations to assure quality of installation per Client’s satisfaction.

QA/QC Site Manager---Refurbish 243 km Railroad---Buchanan, Liberia---May 2008 to Mar 25, 2009

Odebrecht Servicos Exterior no Ltd (OSEL)---Salary Plus

Establish site specific Quality Control Program and QC Plan. Coordinated all efforts of the 30 site Inspectors/ Technicians stretched throughout the 243 km track. Trained all local inspectors/technicians. Set up QC Lab with necessary equipment to perform all contractually required tests. Scheduled and performed all required tests and examinations per contract, specification and drawings. Coordinated all examinations with client. Documented, distributed and filed all tests and examinations. Fined tuned multi-culture teams. Assisted in all the Construction efforts.

Construction Manager---Seven Camp Expansion Project in El Fasher, Darfur---Nov 2007 to Feb 2008

Pacific Architect & Engineering (PAE)---Salary Plus

Coordinated Construction activities and multi-culture teams to assure completion of the Seven Camp Expansion Project in Darfur. Site Preparation and Security to include mostly intra-structure. Erection of Living accommodations, showers/toilets, kitchen/dining expansions, and all above ground and below ground utilities associated and required for the additional peace keeping troops deployment to Darfur.

QA/QC Site Manager---New US Embassy Compound---Khartoum, Sudan---Oct 2006 to Nov 2007

B.L. Harbert Construction Company---Salary Plus

Established site specific Quality Program and Safety Program. Coordinated, monitored and supervised all construction efforts to assure the QC specifications and procedures were maintained during the installation and construction phases. Day to day safety walk to constantly remind construction personnel of the safety requirements. Coordinated all efforts of QC Team, Site Supervisors and Client QA personnel in order to assure the construction efforts were completed per the drawings, specifications and contract. Monitored all construction efforts on the US Embassy Compound Buildings and utilities. Established Document Control Department.

Established a QC Team consisting of local personnel. Trained the individuals on what to look for and how to identify problem areas. Worked very well with day to day training.

Established a Safety Team which monitored to assure safe practices during the construction efforts. Scheduled safety meetings and classes for the construction personnel.

QA/QC Site Manager---New Embassy Compound---Freetown, Sierra Leone---Aug 2004 to Aug 2006

Caddell Construction Company, Inc---Salary Plus

Direct coordination with home office engineers, Turkey contractor’s site management and the US Gov’t QA Team. Worked directly with site project management to assure daily activities and tasks were accomplished. Maintained budget/schedule utilizing on-time and prompt inspections and examinations. Monitored all construction of US Embassy Compound Buildings, utilities, perimeter fence and security. Monitored and tested all Electrical and Mechanical installations. Established QC team and performed all inspections, testing and examinations. Established Document Control Team. Scheduled client witnessing of all testing.

Set up an initiative program to inspire the local personnel to come to work on time and perform their work with pride.

Established Quality and Safety walk through to enhance the local personnel to perform with quality and safety as their goal. Pointed out and explained to the local personnel the quality and safety issues in their work areas.

QA/QC Site Manager---(2) 300MW Fossil Fueled Power Plants---Jacksonville, FL Mar 1999 to Jun 2004

Zachry Construction Company Parrish, FL; Cross, SC; Jacksonville, FL---Salary Plus

Established and initiated a QC program for Zachry’s Construction and Maintenance responsibilities. Tested and Qualified welders per ASME Sect IX. Directed and documented over 50 ASME Sect VIII Vessel Repairs. Erected, installed and tested (4) Combustion turbines, (4) Heat Recovery Steam Generators and (1) Steam Turbine. Fabrication, erection, installation and testing of a Selective Catalytic Reduction (SCR) reactor module for the purpose of reducing NO2 emissons. Maintained dual role as Jacksonville Electric Authority (JEA) site QC Manager and Zachry QC Manager during the construction and erection of (2) 300MW Centrifugal Fluid Bed Boilers in Jacksonville, FL. Testing and examination of all pipe and vessel welds.

Mapped all welds and gave each weld a number. QC team monitored all welding, testing and examinations of welds. Assured all welds were inspected per specification and contract.

Coordinated all QC functions of Zachry QC personnel as well as JEA QC personnel. Scheduled all third party inspections and testing.

QA/QC Site Manager Petro Chemical Maintenance and Capital Projects--McIntosh, AL--1993 to 1999

Brown & Root Construction Co, Inc---Salary Plus

QC Site Coordinator Exxon Oil/Gas Refinery---Theodore, AL---1991 to 1993

H.B. Zachry Construction Company---Salary

Area Construction Manager--Fossil Fueled 200MV Power Plant--Millinocket, ME---1989 to 1991

Rust Engineering---Salary

Boiler Maker Supervisor---Fossil Fueled Power Plant Boiler Maintenance---Indiana /Illinois---1985 to 1988

Blount International--Hourly

Yard Supervisor---Oil Rig Fabrication and Restoration---Pascagoula, MS---1982 to 1985

Ham Industries---Hourly

Owner---Residential/Commercial Contractor---Pascagoula, MS---1978 to 1982

Ely Construction

Education University of Southern Mississippi, Hattiesburg, MS 1977

B.S., Industrial Management, GPA: 3.0

BS/Business Administration---Industrial Management

Inactive Certified Welding Inspector - American Welding Society, 2000. CWI #02010461

Level II PT, MT, UT(thickness) and RT (film interpretation)

National Security Clearance, 2005. Security Clearance----Secret



Contact this candidate