Ahmed El-Shazly
Mississauga, ON, L5L 5J3
Cell phone: 647-***-****, Email: nb5s3m@r.postjobfree.com
Objective:
Obtain a more technical engineering position to strengthen my technical skills.
Skills and Abilities:
• Proficient programming and computer skills (Microsoft Office, C programming, OFM, PEEP, Accumap, HYSYS, AutoCAD-3D, and Various Operating Systems)
• Hands on experience with plant equipment
• Strong knowledge in Process Control, Optimization, Chemical Process Safety loss prevention, and Process Modeling
• Possess WHIMIS and Health and Safety Training
• Driver License (Class G)
• Ability to multitask and meet deadlines in a timely manner
• Effective organization and interpersonal skills
• Ability to work individually and as part of a team environment
Education:
Bachelor in Chemical Engineering 2005 - 2010
Ryerson University, Toronto, ON
Work Experience with Patheon:
Process Technologist/Engineer 2011 - present
• Process/manufacture products in accordance with written processing orders
• Completed roller compactor production increase project
• Prepare manufacturing areas and equipment for the production
• Clean processing equipment and rooms in accordance with written Standard Operating Procedures (SOPs) and established Good Manufacturing Practices(GMPs)
• Ensure product quality meets the standards of Patheon, our clients, and applicable regulatory agencies
• Follow the required Environmental Health and Safety (EH&S) requirements
Work Experience with Husky Energy:
Reservoir Engineering Student (Husky Tower) Jan 2009- Aug 2009
• Optimized current SAGD wells (includes subcools and deltaP calculations)
• Determined steam rates and drive patterns
• Exposed to drilling engineering operations
• Determined steam cycle plans for CSS wells
• Determined which wells required Fracturing or Acidizing jobs
• Analysed the effect of active wells on the abandoned ones and vice versa
• Researched and analysed technical information
• Handled large datasets
Process Engineering Student (Upgrader) May 2008- Aug 2008
• Completed 5 Simulation projects on HYSYS
• Regularly retrieved data from softwares or out in the field off gauges if required
• Used P&ID, and isometrics regularly to understand the process flow
• Contacted vendors for equipment specifications and quotes
Lab Technician/Operator (Ethanol Plant) Sep 2007- Dec 2007
• Witnessed plant start-up
• Performed all laboratory procedures and enhanced the tests
• Calibrated and helped setup lab equipments from scratch, including GC and HPLC
• Trained co-workers and operators to perform the required tests
• Replaced malfunctioning pump with maintenance crew
Volunteer Work:
• Training the operators to use the gas detectors safely
• Worked on the exchanger cleaning project with professional engineers
Personal Interests:
• Computer programming
• Listening to music
• Swimming and Soccer
• Traveling