Curriculum Vitae

Production Supervisor/DCS Operator

Personal Details

Name: Jinga

Surname: Liviu Fabian

Date / Place of Birth: 08.Dec.1968/Ploiesti

Nationality: Romanian

Marital Status: Married, one child

Address: Romania

Phone: +40-024*-******

Mobile: +40-072*-******

E-mail: ***********@*****.***

Web Page: No

Executive Summary

• Have a good experience of working in Petrochemical Industry.

• Actually I working in Nigeria on Production Supervisor position in a Crude oil separation FPF plant.

• DCS experience with Emerson Delta V and ABB Freelance 2000 programs.

• Naphtha hydrodesulphurization plant.

• Polypropylene plant.

• BOSIET certificate valid.

Career Objective

• I want to work in different places for rich my knowledge in this industry, for improving my career.

Bio Data

• Countries Worked In: Romania, Libya, Nigeria, Brasil

• Countries Lived In: Romania

• Foreign Languages: Good knowledge of English

Work Experience

• Period May 2012 – Present

Position: Production supervisor – Cidade de Vitoria FPSO

Company & location: Saipem Brasil / Vitoria / FPSO Atlantic Ocean

Crude oil and gas separation plant, 20000bbl/day crude oil export.

Plant is designed from several modules, like: Riser balcony – for oil & gas wells risers; Oil separation; Gas separation; Gas lifting compression unit (two Nuovo Pignione three stages turbine compressors trains); HP fuel gas system; LP fuel gas system with Flash gas compressor for LP gas recirculation; Glycol injection and regeneration unit for gas dehydration.

* My duty is to maintain the plant in normal and safe running as per design and client (Petro Brass) request. Prepare work permits and keep updated the PW system on board. Start up and shut down the plant as per procedure. Keep production superintendent informed regarding plant running and all daily activities in process area. etc

• Period: May 2008 – Apr 2012.

Position: Production Supervisor - Agbani FPF

Company & Location: Expro Nigeria Limited / Port Harcourt / River state.

Is a FPF unit, contain crude oil separation plant, 14000 bbl/day crude oil export. Three fazes separators, an electric coalescer, water injection package, 15 wells split on 2 separate platforms. Turbine Gas generators and diesel generators for power produce.

* My job here is to start up and shut down plant in safety condition and in conformity with standard start up and shut down procedures. To accomplish punch lists for shut down and plant maintenance. Hot; cold permits, isolation certificates and risk assessment must be done daily for different kind of jobs on board. Different reports and work procedure are in production supervisor daily task.

• Period: 2004 –2008 May

Position: DCS Operator Attahaddy Gas Plant

Company & Location: Sirte Oil Company Libya/Sirte Bay

* In this position I was responsible for the safe and efficient operation of all facilities within the Attahaddy Gas Plant including but not limited to gas treating, dehydration, fuel supply, refrigeration, liquid recovery, instruments and utility air system, N2 generation, water treatment and storage facilities, fire and gas control system, DCS system, emergency shut-down system. Commissioning the plant for client when this one to has been received the plant from constructor (Hyundai Heavy Industry).

This plant is capable to treat 350 MMSCFD of sour row high pressure gas with 2 trains, sales gas app. 270 MMSCFD with low CO2 content ( < 2 mol % ) and water content ( 4 lbs/MMSCFD ) and export condensate app. 31000 bpd with low water content ( < 0.02 vol % ) including 10 primary units along with utilities ( inlet manifolds & test separator, production separator, acid gas removal, MEG regenerator, dehydration, propane compressor, mercury removal, heating medium, amine, instrument/plant air system, fuel gas system/ flare system, fire and gas control system). All the dynamics equipments (booster pumps, charge pumps and propane compressor) were designed by Nuovo Pignone Italy. Need to keep close communication with other plants areas on problems affecting overall plant operations; maintaining two-way communications with the operators at all times during the shift. Ensuring communication equipment serviceability and reports any malfunctions. Monitoring and controlling the operation of the equipments in all the units. Checking lab results and data sheets and corrects as necessary. Doing maintenance work requests for minor and emergency plant equipment repairs and work permits for supervisory approval. Keep log book entries; describing maintenance needs and unusual operations for use of the next shift; Libyan operators training.

• Period:2001 – 2004

Position: DCS Operator FCC Naphtha Hydrodesulphurization

Company & Location: LukOil, Ploiesti Romania

*Startup and Shutdown the plant, operating in normal parameters this plant in safety condition

*This plant was a Exxon-Mobile project, recirculation compressor made in France by Dresser Rand

*The catalyst used in both reactors on base by cobalt-molybdenum & nickel-molybdenum, made Haldor Topsoe

• Period: 1999 –2001

Position: Panel Operator in Polypropylene plant

Company & Location: LukOil, Ploiesti Romania

* Startup and Shutdown the plant, Operating in normal parameters this plant in safety

Condition

*The appliance on the panel was pneumatically and electronic, with many interlock systems, in special in humid cake separation-Centrifuge made in Japan by Hitachi

*Entire project of this plant made by Mitsui Know How

• Period: 1993 – 1999

Position: Field Operator in Polypropylene plant

Company & Location: LukOil, Ploiesti Romania

*Good knowledge for using all field equipment, like pumps(reciprocating and centrifugal), compressor (made by Nikkon Shultzer), reactors blenders, blowers, etc.

• Period: 1991 – 1993

Position: Paletization Operator in Styrene Copolymer plant

Company & Location: LukOil, Ploiesti Romania.

*Ensuring the proper running of the extruders and the related cooling system, the vibrating sieves and the storage facilities for finished copolymer grains

* In reaction copolymer plant, used reactors with jackets and blenders for cooling with water the entire mass of reaction.

• Period: 1990 – 1991

Position: Process Operator in Styrene plan

Company & Location: LukOil, Ploiesti Romania

* Process Operator in to the Styrene separation column, using vacuum for heavy parts distillation. Is used centrifugal and reciprocating pumps.

* Industrial High School for Oil & Gas Campina, graduated in 1987

Education

* Qualification course for Chemical Operators, 1990 at PETROTEL Ploiesti . Specialty: Refinery gases chemification.

Computer Literacy

• Operating Systems: Windows XP Professional, Office: Excel/Word