BIO-DATA
Name : Mahesh R Chavan
Date Of Birth
Address
Tel.Contact no.
:
:
:
F-104, Divine co.op.soc, Gen. Arunkumar Vaidya Marg.
Goregaon (East), Mumbai – 400063, INDIA.
***********@*****.***
***********@*****.***
Mobile +47-96662559 - Norway
Resi +91-22-284*-**** - India
Designation : Sr. Piping Designer – PDMS
Educational Qualification : Diploma in Mechanical (ITI) – January 1986
Certificate in Piping D’man – June 1987
Certificate in Auto CAD - March 1991
Diploma in Computer Aided Design – May 1997
Diploma in Software Engg. – June 1999
Work Experience : Total : 20 yrs+
Mechanical Exp. : 6 years
Piping Experience : 14 years (10Yrs PDMS in Oil & gas,Petroleum,
Powerplant, Sulphuric Acid)
Specialized Experience : PDMS, KMS / MDS (Multi Discipline Support), MIPS, Time, SAP, Project wise, Smart Plant Review (Design Review), Cad / Auto Lisp, Cad Works, Auto Plant,, Micro station, True view, C++ language
Passport Details : Passport No. : Z 1893045
Date of Issue : 01 January 2009
Date of Expiry : 31 December 2018
Place of Issue : Mumbai
PROFESSIONAL EXPERIENCE:
1. Worked at Aker Kvaerner – Bergen / Egersund, NORWAY, from 18 Th Feb. 2008 to still continue
Designation : Sr. Piping & Pipe support Designer – PDMS / Microstn.
Project : 1. Oserberg B drilling upgrade – presently working
2. Alve tie-in
3. Gjøa Semi EPCH Semi submersible (floater) platform.
Client: Statoil Hydro
Location: North Sea, Norway
SALIENT FEATURES OF THE PLANT:
Platform located in 300 m deep sea. Platform dimension 125m x100m. Scope consists of Detail Engineering of Topside. Topside areas: Process, Riser, Utility. 8000 area lines, 500 tagged eqpt. /packages. Project is based on 3D PDMS
Job Profile:
Working as PDMS Piping Designer.
• Areas assigned:5nos , 950 lines & 50 equipment including Pumps(Centrifugal & Vertical),Cartridge Filters, Nitrogen Compressor, Shell & tube Heat exchanger, Floatation unit, Compact heat exchanger, Waste heat recovery unit& Fire hydrants.
• Pipe routing as per P&ID & Work instructions – DEP-Statoil Hydro.
• Equipment modeling in PDMS as Mechanical vendor drawing.
• Coordination and Follow-up with various disciplines at Norway & Mumbai.
• Preparing of the Nozzle Orientations.
• Checking of Vendor drawings.
• Prepare & Issue of Isometrics for AFC.
• Follow PEM (Project Execution Model) requirements.PEM is a systematic approach for project execution with different Control level (Different stages & Milestone) & different Execution level (Quality level, Status & Checklist)
4. Brage Platform
Client : Statoil /Hydro,
Standard Used : TR2000 –Statoil, Norsok Standard,
2. Worked at Vetco Aible – Bergen / Haugesund- Norway, from 19 th May. 2006 to 04th FEB. 2008
(Deputed by Vetco International UK.,)
Designation : Sr. PDMS-Piping Designer
Project : 1. Kvitebjørn M&M
2. Snorre A Brannvannspumpe
Client : Statoil
Standard Used : TR2000 –Statoil, Norsok Standard,
3. Worked at Global Process System Inc. – Dubai UAE, from 19TH OCT. 2005 to 16TH FEB.2006
(Deputed by Kirpalaney & Associates (Engineers) Pvt. Ltd., Mumbai,)
Designation: Sr. Piping Designer - CAD Works
Project : Maleo Development MPOU Conversion and Operating Service
Client : Santos – Madura Island
4. Worked at CiTEC Information India (P) Ltd, from 21ST FEB 2005 to 17TH Oct. 2005
for their office at Citec Engineering Oy AB –FINLAND
Designation: Lead Piping Designer - PDMS
Project : BIOPOWER
Client : Trollhaten - Germany & Baden - Sweden
Capacity: 5 MW
5. Worked at Technip-Coflexip –Abu-Dhabi-U.A.E, from 1 ST MAY 2004 to 27TH OCT. 2004
(Deputed by R. J. Associates (Engineers) Pvt. Ltd., Mumbai,)
Designation: Sr. PDMS – Piping / Support Designer
Project : FPSO TOPSIDES offshore platform
Client : Dalia mar profundo – Angola
Proc.Licens: Total E&P – Angola, South Africa
Project : KHARG ISLAND GATHERING & NGL RECOVERY offshore platform
Client : IRANIAN OFFSHORE OIL COMPANY (IOCC) – Iran
Proc.Licens: Petrochemical Industries Design & Engineering Co. (PIDEC)
6. Worked at Kvaerner Powergas India Ltd. Mumbai, from 2ND JUNE 2003 to 29TH APRIL 2004
Designation : Sr. PDMS - Piping Designer
SrN. PLANT DESCRIPTION SALIENT FEATURES OF THE PLANT SELF INVOLVEMENT
1 PTT Bongkot Client : Kvaerner E & C, Singapore
Process Licensor : Saipem Consortium
Capacity : 22000 BPD
Location : Bongkot
Duration : 7 months Sour Process Platform – PTT exploration and production
Plant includes reactor, mercury removal absorber, HP flare KO drum H2S scavenger filter
Total number of equipment: 60 nos.
Total number of lines : 750
Number of GRP/Cu lines : 130 Equipment modelling
Design of piping
Nozzle orientation
Piping layout draft
Iso draft
Piping supports Design & detailing, Report extraction.
2 K.N.P.C Kuwait Client : Shuaiba Refinery Kuwait
Process Licensor : Parsons
Capacity Enhancement of SRU’s Oxygen Enrichment
Location : Kuwait Sulphur Recovery Unit 04 and 74
Plant includes reactor, mercury removal absorber, HP flare KO drum H2S scavenger filter
Total number of equipment: 30 nos.
Total number of lines : 350
Number Stress Critical lines : 75 Preparation of isometrics.
As-built from mark-up.
Checking of isometrics
Detailing of pipe supports
Material take-off etc.
3 Non woven
Sheet Plant
(STRATUS-I) Client : DuPont Nonwovens Location : Old Hickery
Tennessee, USA Process Licensor : DuPont
Capacity : 380mmsq.yds/year
Duration : 8 months Type of equipments (Total no. 150)
Hoppers, Bag filters, Compressor
Heat Exchangers/Chillers/Dehumidifiers
Blowers / Pumps / Fans/ Dryer
Vendor proprietary items for spinning, finishing, material handling.
Types of pipe lines (Total no. 1500)
Lines for conveying PE, Polyester Dowtherm, Zonyl, Hexanol lines. Worked as PDMS Designer
Pipe modeling for chiller, dryer, winder and unwinder and spinning area on PDMS
Equipment modeling in PDMS
Support modeling in PDMS.
Extracting isometrics from PDMS.
Checking and Resolving Clashes in PDMS.
7. Worked at J Ray McDermott – Dubai-U.A.E, from December 2002 to March 2003
(Deputed by Kirpalaney & Associates (Engineers) Pvt. Ltd., Mumbai,)
Designation: Piping & Pipe support Designer
Project : N11 & N12 Wellhead offshore platform
Client : O.N.G.C – Mumbai, India
8. Worked at Kvaerner Powergas India Ltd. Mumbai, from July 2001 to December 2002
(Deputed by Wellwisher Engineering Consultants Pvt. Ltd.)
Designation: Piping / PDMS Designer
9. Worked at Poseidon Engineering Consultants Ltd., Mumbai, from April 1992 to June 2001
Designation: Cad Mechanical -Piping Design Draughtsman
10. Worked at Aarvi Encon Pvt. Ltd., Mumbai, from October 1989 to November 1991
Designation: Auto cad - Piping Draughtsman
11. Worked at Remi Process Plant and Machinery Ltd. Mumbai, from Sept.1988 to Oct. 1989.
Designation: Mechanical Draughtsman
12. Worked at Fine Flow Engineers, Mumbai, from January 1987 to August 1988
Designation: Mechanical Draughtsman
Responsibilities undertaken for the particular posts:
PDMS Designer :
Piping modelling for chillier, dryer, winder and unwinder and spinning area on PDMS. Equipment modelling in MDS Support modelling in PDMS
Extracting isometrics from PDMS Checking and resolving clashes in PDMS
Preparation of P & Ids, PFDs, Plot Plans, Plant layout Detail engineering design and drafting work for various new projects and existing plant modifications
Worked on shutdown related jobs which required fast and precise job work sketches.
Mechanical Designer :
• Detail drawing of hydraulic and pneumatic cylinder and ejector and industrial mixer vessel and agitator