Randy Nelson
Phoenix, Arizona
E-Mail: ***************@*******.***
SUMMARY:
My experience as a project manager, estimator, and sales representative provides me with a unique set of skills developed over forty two years spent in many areas of the steel industry. I am confident that it is these many years of experiences in the steel market, which now enable me to fill the role of General Manager of Redd Roc Steel, Inc. As the originator and catalyst for the idea of Redd Roc Steel, Inc., I feel a great responsibility to direct its operations according to the standards that I have learned during ownership of my own company (eight years) and my employ with other successful companies.
I am certain that my abilities in sales, client services, project management, and estimation will grant success wherever my efforts are placed. I have also gained many contacts throughout the western United States, including: Washington, Oregon, California, Nevada, Utah and Wyoming.
PROJECT EXPERIENCE:
• Estimated Industrial and Structural Jobs with regard to plate work, bins, hoppers, conveyers, ASME vessels, carbon columns, beams & columns and other miscellaneous areas.
• Estimated jobs for Erection and Fabrication including actual erection and needed man-hours.
• Responsible for bidding the Fabrication of the Structural Steel, type of equipment to be used, move-ins setup time, mobilization, and demobilization.
• Responsible for the erection of the Delta Multipurpose Center Steel, including coordinating activities of subcontractors.
• Estimated Steel Fabrication for Pressure Vessels, Conveyors, Bins, Hoppers, and Baghouse.
• Project Manager for change orders, print reviews, schedule of values and construction meetings.
• Sales Representative and Account Manager in the Fabrication of Structural Steel and Erection, which included many hours of negotiation and client services.
• Site Project Manager: New School (Tonopah, Nevada), addition on MGM Grand Hotel (Las Vegas, Nevada), UC Irvine College (Irvine, California), KOLL Office Building (Irvine, California),The Lodge (Park City, Utah), Smith’s Food King (Reno, Nevada), Smith’s Food King (Sandy, Utah), Smith’s Food King (Las Vegas, Nevada) Pilot’s Peak Gold Mine (Wendover, Nevada), Kennecott Expansion (Salt Lake City, Utah), Custom Homes (Park City, Utah), Barrack Gold Mine (Carlin, Nevada), Peppermill Hotel and Casino addition (Wendover, Nevada), Walker Furniture (Las Vegas, Nevada), and K-Mart Stores in (Park City, Salt Lake City, & Farmington, Utah).
PREVIOUS WORK HISTORY
• Fusion Steel Erectors
2006-Present Project size 100,000-1,000,000
Phoenix, Arizona
Owner/Estimator/Sales/Project Manager
Responsible for bidding the Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization.
• Redd Roc Steel Inc.
2004-2005 Project size 20,000-2,000,000
Saint George, Utah
General Manager/Estimator/Sales/Project Mgr.
Responsible for the day to day operation of the business, Payables, Receivables, had 10 shop personnel, six office personnel bidding the Fabrication of the Structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization. Also set up fabtrol with time studies
Project Manager for Four Wal-Marts, Quick N Cleans, California Cement Plant addition, CVS Pharmacy Several other projects in Arizona.
• Skyline Steel Inc
2001-2004 Project size 20,000-8,000,000
Gilbert, Arizona
Estimator/Sales/Project Mgr.
Responsible for bidding the Fabrication of the Structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization. Outside sales. Also set up fabtrol with time studies
Project Manager for SNC Lavalin, Gila River Power Plant Project.
Project Manager for the solar plant field in Prescott Arizona
Noteworthy projects include: Credit Counselor office building, CVS pharmacy, SNC Lavalin, Gila River Power Project, Solar Power Plant Prescott and Warner office building.
• Schuff Steel
2000-2001 Project size 100,000-50,000,000
Phoenix, Arizona
Estimator
Responsible for bidding the Fabrication of the Structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization.
Noteworthy projects include: Desert Ridge Shops, Marriott hotel, and ADEQ office building.
• D. H. Steel
1996-2000 Project size 1,000,000-10,000,000
Salt Lake City, Utah
Estimator/Project Manager
Responsible for bidding the Fabrication of the Structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization. I was also appointed as Site Project Manager.
Noteworthy projects include: addition to a school (Tonopah, Nevada), addition MGM Grand Hotel (Las Vegas, Nevada), UC Irvine College (Irvine, California), KOLL Office Building, (Irvine, California), and the Lodge (Park City, Utah).
• Western Steel
1988-1996 Project size 5,000,000-20,000,000
Lindon, Utah
Sales/ Estimator/Project Manager
Responsible for bidding the Fabrication of the Structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins setup time, mobilization, and demobilization. I was also appointed as Site Project Manager.
• Mark Steel
1980-1988 Project size 1,000,000-10,000,000
Salt Lake City, Utah
Estimator
Responsible for estimations on the steel fabrication for pressure vessels, conveyors, bins, hoppers, and bag houses.
• Dempco Steel
1976-1980 Project size 100,000-300,000
Salt Lake City, Utah
Sales/Estimator/Production Manager
Responsible for the project estimations for the fabrication of products. This included the scheduling, and the purchasing of the steel components, and running the shop.
Noteworthy projects include: Custom Homes (Park City, Utah), and the Barrick Gold Mine
(Carlin, Nevada).
R. N. Steel
1971-1976 Project size 100,000-300,000
West Valley City, Utah
Owner
Responsible for bidding the Fabrication of the structural Steel and Erection and estimating the needed man-hours, type of equipment to be used, move-ins, setup time, mobilization, and demobilization. Worked as the Site Project Manager, contracted and managed all the necessary subcontractors.
Noteworthy projects include: Smith’s Super Store (Las Vegas, Nevada), Peppermill Hotel & Casino (Wendover, Nevada), Walker Furniture (Las Vegas, Nevada), and K-Mart Stores (Park City and Farmington, Utah).
EDUCATION:
Box Elder High School Brigham City, Utah
Weber State – Business Management (2 years) Ogden City, Utah
Weber State – Vocational Center I the Machine Shop (1 years) Ogden City, Utah
Certified Welding Inspector Seminar Ogden City, Utah
Non – Destructive Testing Seminar Ogden City, Utah
Numerous Seminar Industry Related
CERTIFICATIONS:
Certified with the Aerospace Division in Non-Destructive Testing Level 1 (N. D. T.)
Certified Welding Inspector (C. W. I.) (Expired)
Certified with Fabtrol Estimating System