Post Job Free

Resume

Sign in

Snr.Coating inspector.

Location:
Chennai, TN, 600103, India
Salary:
400 USD PER DAY
Posted:
November 10, 2010

Contact this candidate

Resume:

Ramasamy . Ravichandran

No.**/**, Manali New Town, No.23C, East Street,

Chennai 600 103. Valangaiman –Po.,

India. Thiruvarur – Dt.,

House Ph.: +91-44-259***** Tamilnadu, India. Pin code- 614804

Cell: +91-996******* House Ph: +91-437*-******

Cell: +91-996*******.

E-mail: mqjm2i@r.postjobfree.com, mqjm2i@r.postjobfree.com.

PERSONAL INFORMATION

Age & Date of Birth : 37 Years, Dec. 21,1973

Nationality : Indian

PASSPORT DETAILS

Passport Number : E-1979279

Place of Issue : Singapore

Expiry date : 17-10-2012

EADUCATION

Chemical Engineering : International council for management studies

TECHNICAL

Coating inspector : NACE Level II certified CIP No:14272

Passive Fire Protection : CHARTEK QC Inspector for Chartek Fireproofing Systems – International Coatings Ltd., Essex, U.K,

Coating :Akzo Nobel Attended coating Technology Course, - International Coatings Pte Ltd., Singapore.

Certified PFP Supervisor CHARTEK Qualified Supervisor for Chartek Fireproofing Systems – International Coatings Ltd., Essex, U.K.,

Health, Safely & Environment : Certified Safety Supervisor, Ministry of Manpower, Singapore

EMPLOYMENT HISTORY

Total years of Experience : 16 Years

• New Construction onshore, Oil and gas, marine & Offshore projects

• Maintenance contracts onshore, Oil and Gas, Marine & Offshore

• Special skills in

• Coating, Painting & Linings

• Passive Fire Protection

2010 Sep to Still Worked M/s Transocean – D534 Project Drill ship

Supervisor cum SNR Coating inspector at

PTP in Malaysia.

2010 July to 2010 Aug M/s Transocean – DW Expedition Project Drill

ship Supervisor cum SNR Coating inspector at

Singapore Sembawang ship yard.

2009 Sep to 2010Apr M/s Transocean – GSF Explorer Project Drill ship

Supervisor cum SNR Coating inspector at Singapore Sembawang ship yard.

2009 (July – September) Akzo Nobel India – Barmer, Rajasthan

Worked as a consultant for Akzo Nobel India at the Mangala Processing Terminal of Cairn Energy India Pvt Ltd during the Construction phase.

Nature of work Inspection of Structural and pipeline coatings including surface preparation standards .

2009 (May – June) CDC Carboline India Pvt Ltd.

Worked at the ONGC – Sulphur Refining Facility Expansion – Contractor Larsen and Toubro, India

Nature of work : Monitor Appication of Fireproofing (Pyrocrete 40) and ensure project quality requirements are met.

2008 to 2009 (Sep — Feb) : M/s Transocean – Trident 1X Drilling Oil Rig

Supervisor cum Coating inspector at Singapore.

Keppel Fels.

2008 : M/s Transocean – FGMcCLINTOCK Drilling Oil Rig

Supervisor cum coating inspector at Sharjah – U.A.E

2008 : M/s Transocean – Nordic Drilling Oil Rig

Supervisor cum Coating Inspector at Johor Port, Malaysia

2006 to 2007 : M/s Transocean – Trident 2 Drilling Oil Rig

Supervisor cum Coating Inspector at Cochin Shipyard, India

1995 to 2006 : Haraco Service Pte. Ltd. Singapore 917699 Muehlhan Group

 Co-ordinator (Coating & QHSE)

Client / Contractor : Project Title & Scope of Work – New Construction Contracts

o Conoco Philips : Bohai – FPSO Phase I Top sides Coatings and Fire Proofing of Top sides modules

.

o Bechtel : Third Transmission Pipeline Project Living Quarters & Process Modules

o British Petroleum : Shah Deniz Project Production & Process Modules

o Exxon Mobil / Saipem : Erha FPSO Project Construction of Top Side Modules & Integration

Occidental Petroleum of Qatar : OPQL – ISND Phase II Expansion PS-1K Project

o Maersk Olie OG Gas AS : Dan FG Field Development Project Process Module

o Devon Energy : Panyu Field Development Project Modue 4-2 / 5-1 (Production & Process)

o Maersk Oil Qatar / Dopet : Al Shaheen Field Production Satellite Platforms (Offshore) Structural Steel, Piping & Equipment.

o Shell : Malambaya Production Platforms (Offshore) Living Quarters & Process Modules.

o BW. Enterprises : BW FPSO Project Offshore Construction of Top Side Modules & Integration

o Oil Tanking Ltd., : Storage Tanks (Refinery Tank Farm) Living Quarters & Process Modules.

o Marine : Stolt Tanker, Jo Tanker, Shell Ship, Bow Tanker, British Petroleum Ship FPSO, FSO LNG & US Naval Services.

CORE RESPONSIBILITIES

Project Management

• Key contacts for co-ordination

• Scope of work, project contractual requirements such as milestones and completion schedule.

• Design engineering, fabrication and construction sequence

• Applicable codes and standards

• Pre-Job conference records or minutes of meet

• Project history or tract record

• Identify areas in critical path, cause and effect

• Key personnel – title, function, responsibilities and authorities

• Daily report or log

• Specific field Tests & Reports

• List of plant, machinery, equipment, tools, inspection instructions & site office facility.

• Procedures

• Inspection test Plan

• daily Progress report

• Daily inspection report

• Review company procedures and inspection test pan

• Ensure effective Utilization of resources

• Monitor production performance

• Conduct co-ordination meetings

• Constant co-ordination with project management team

• Identify areas in critical path, cause and effect

• Surface preparation methods.

o Mechanical surface preparation during pre-fabrication and onsite portable centrifugal blasting

o Open air blast cleaning

o Vacuum blast cleaning

o Hydro blast Cleaning

o Wet blast cleaning

o Hand and power tool cleaning

• General uses of coatings / linings / wrappings

o Painting

o Galvanizing

o Passive fire protection

o High performance internal linings

o Tape wrappings

o Anti-skid deck coatings

• Type of coating commonly used and the major components of coatings

• General physical and chemical properties o the generic types of coatings and application process of coatings / linings

• Calibration of inspection and test instruments

• Using Coatings inspection and test instruments

• Defects affecting performance of the applied coatings

• Causes for most common coating defects

• Inspection of defects on coated surface

• Acceptable and unacceptable defects

• Identification of defects and implementation of repair procedure

• Premature failure analysis o coatings

• Protective coating inspection standards for field and shop applications

• Internal spin blasting and spray painting methods

• Plural spray method

• Hot spray method

• Documentation

• Witness applicator qualification or trade test and paint system qualification

• Measure ambient conditions surface temperature and air quality requirements

• Inspect location and suitability of access for areas of work

• Inspect type of blasting equipment and tools to be used

• Inspect type and size of blasting media

• Test Indication of oil or water in compressed air

• Inspect pre-cleaning or solvent cleaning of surface

• Measure compressed air pressure

• Inspect degree of cleanliness required

• Measure surface profile of blast cleaned surface

• Assess surface cleanliness of blast cleaned surface

• Assess surface cleanliness soluble salt contamination on blast cleaned surface

• Inspect coating material storage conditions

• Inspect type of coating material to be used

• Measure wet film thickness by notch gages

• Non-destructive measurement of dry film thickness of non-magnetic coatings applied to ferrous surface

• Non-destructive measurement of dry film thickness of non-conductive coatings applied to non-ferrous surface

• Destructive measurement of dry film thickness of coatings

• Monitor re-coating and final curing schedules

• Test film hardness

• Measure the adhesion of coatings applied

• Test pull-off strength of coatings applied

• Test discontinuity (holydays or pinholes) of nonconductive coatings and linings

ADDITIONAL RESPONSIBILITIES

Health, Safety & Environment

• Understand local and international legal and HSE regulations

• Project specific HSE requirements

• Witness tool box briefing, safety surveillance & safety audit

• Attend monthly management safety committee meeting

• Conduct project safety co-ordination committee meeting (Permit to work system)



Contact this candidate