Robert Allen
Houston, TX 77067
Phone: 301-***-****
Email: **********@*****.***
Experience 12/2011-Present CB&I The Woodlands, TX
Tank Erection Superintendent
Project Assignment:
Reficar Cartagena, Colombia
Managed the erection of new AST’s.
PWHT of several new AST’s.
Worked with safety and QC depts. to ensure all work was done safely and met all quality standards.
06/2010 – 11/2011 HMT Inspections Houston, TX
API 653 Inspector
Inspect above ground storage tanks to ensure they meet API standards.
Determine scope of work for tank repairs.
Consult with clients to ensure their specific needs are met.
01/2010 – 05/2010 Landmark Structures Ft. Worth, TX
Project Superintendent
Managed API tank repair projects
Worked with safety dept. to develop safe working procedures.
Performed constructability walkthroughs prior to construction.
07/2009 – 01/2010 DJA Inspections Bakersfield, CA
API 653 Inspector
Inspect above ground storage tanks to ensure they meet API standards.
Work with customers to find cost effective repair solutions that will maximize tank life.
Work with other contractors to ensure repairs are made to the highest quality standards in a timely manner.
03/2009 – 06/2009 MEI White Castle, LA
Pipefitter/Foreman
Project Assignment:
03/09-06/09 ExxonMobil –Furnace Revamp Baytown, TX
Prepare and fit heavy wall chrome pipe.
Remove and replace furnace tubes using an overhead trolley system.
09/2008-02/2009 Brinderson Constructors Costa Mesa, CA
General Superintendent
Communication with sub-contractors to ensure schedule and budget milestones.
Worked with customer to address changes in work scope and schedule.
Worked with safety dept. to ensure all jobsite activities were being done safe and productively.
Consulted with QC dept. to ensure all work met strict quality standards.
10/2007-08/2008 Wyatt Field Services Houston, TX
General Foreman
Project Assignment:
10/07-05/08 Shell Martinez, CA
Simultaneously managed several projects including roof and bottom replacements on 300’ tanks.
Training employees in proper work practices to ensure safety and productivity.
Reported job progress to upper management daily.
01/2005-10/2007 Pala Interstate La Porte, TX
Cad Operator/Mechanical Designer/Erection Foreman
Designed above ground storage tanks to meet customer specs. and API standards.
Designed structure and piping for use in various applications.
Assisted in preparing bids for construction projects.
Managed AST erection and repair projects.
Installation and maintenance of hydraulic security gates that meet Homeland Security standards.
Worked with safety and QC depts. to ensure all work was done safely and met all quality standards.
08/2001-01/2005 CB&I The Woodlands, TX Boilermaker/Foreman
Project Assignments:
Marathon Ashland-FCCU Turnaround Garyville, LA
Exxon Mobil-FCCU Turnaround Billings, MT
Technip-Offshore Platform Construction Aransas Pass, TX
Conoco Phillips-Coker Replacement Billings, MX
Marathon Ashland-FCCU Turnaround Garyville, LA
Chevron-Sphere Erection Richmond, CA
Sunoco-Tank Repairs Yabacoa, Puerto Rico
Tesoro –FCCU Turnaround Anacortes, WA
Shell- Coker Replacement Carson, CA
BP- Coker Replacement Carson, CA
Education 1995-1999 Lee College Baytown, TX
Associates Degree in Design Drafting
2010-2012 University of Phoenix Houston, TX
Bachelors of Science in Management
Skills/Qualifications
API 653 Certification AutoCAD
MSHA 24 Hr Training SAP
OSHA 30 Hr Training Microsoft Office
P3 Primavera Project Planner
NCCER Certifications: Boilermaker, Ironworker, Pipefitter, Advanced Rigging, and
Abnormal Working Conditions
TWIC Card
Magnetic Flux Leakage Scanning
References Furnished upon request.