JOE HUCIK
**** ******** ***** **. | El Dorado Hills, CA 95762 | 916-***-**** | ********@***.***
OBJECTIVE
Obtain a challenging position with a commercial general contractor in the Sacramento area, where I can prove to be a valuable asset and a promising future to the company.
EDUCATION
Bachelor of Science, Construction Management
California State University, Chico December 2008
SKILLS
• Computer Skills - Prolog, Builder’s Axis, Microsoft Word, Excel, Power Point, and Outlook
• Strong Interpersonal Skills
• Self Starter
CERTIFICATIONS/AFFILIATIONS
• Successfully completed a 10-hour OSHA Training Course in Construction Safety and Health
• Jesuit High School Alumni
• California State University, Chico Alumni Association Member
EXPERIENCE
Intern
Roebbelen Contracting - Sacramento
May – August 2008
• Assisted with project close out for Antelope High School.
• Personally created and 90% completed a 2,400 item punch list.
• Scheduled and coordinated training seminars for future faculty and staff.
• Maintained project documents and As-built drawings.
• Participated in commissioning meetings and Owner Architect meetings.
• Created a layout plan for bird protection for all of the buildings.
• Performed quantity take offs, as well as purchased materials.
• Reviewed subcontracts with different trades to confirm scope of work.
• Delegated various work to Roebbelen’s work force.
May – August 2007
• Returned to Antelope High School project, that was 60% completed.
• Maintained as-built drawings and project documents.
• Made frequent safety walks through the jobsite looking for potential safety hazards and violations.
• Assisted in preparing our jobsite trailer for an internal operations audit.
May – August 2006
• Interned for Roebbelen Contracting on Antelope High School project.
• Learned the basic fundamentals of Prolog.
• Measured productivity in the field.
• Updated the As-Built drawings with close to 400 RFI’s. Sacramento, CA
Intern
Viking Construction Company - Sacramento
June - August 2005
• Interned for Viking Construction in Rancho Cordova.
• Performed minor engineering calculations and revised temporary structure designs using AutoCAD.
• Purchased construction materials, performed quantity take offs, and assisted with general office work. Sacramento, CA