Michael Hake
**** ****** ****** - *****, **** *4093 435-***-**** home email: mhake07@gmail.com________________________________________
OBJECTIVE: Seeking a long term supervisory position with a reputable company with the potential for advancement.
POSITION: CONCRETE SUPERINTENDENT
QUALIFICATIONS:
Comprehensive knowledge in all phases of Pre Construction, Design Build and General Construction procedures possessing 35+ years of experience successfully working on projects ranging from $1.5 million to $465 million. Projects including but not limited to multiple disciplined CIP Structures, Military, Educational, Public Works, Pre Cast Concrete, Water Tanks, Health Care, Hospitality, High Rise, Casino, Concrete Tilt Up, Warehouse, Big Box, Commercial, Retail, Industrial, Single Family & Multi Family Residential applications.
General Superintendent with 6 years experience successfully scheduling and coordinating all related construction trades on medium size military and public works projects with values from $2 million to $10 million. Assistant Superintendent with 6 years experience assisting with scheduling and coordination of all sub contractors with emphasis on Earthwork, Underground Utilities, Concrete, Concrete Reinforcing, Structural Steel, Framing, MEP, Insulation, Painting, Drywall, Interior Finishes & Punch List Items for Final Walk through and Certificate of Occupancy on projects with values $12 million to $52 million.
• Thorough review and understanding the Scope of Work during Project Startup establishing complete confidence and trust with clients
• Design Build experience clarifying discrepancies and conflicts in project drawings while reducing RFI Submittals, Change Orders and potential project delays by 70% or more
• Accurate documentation of As Built Drawings providing a complete recording of pre-existing conditions and/or the project drawings conflicting with the completion of the project.
• Contract Review assuring sub contractors scope of work is complete and includes requirements by other trades to complete their work in a timely manner while minimizing Extra Work Authorizations and schedule delays
• Precise recording of back charges to subcontractors not completing their contract obligations recuperating numerous unforeseen costs to the General Contractor and minimizing project delays
• Field Engineering experience minimizing additional survey expenses due to loss of staking during construction
• Knowledge of Contract Specifications and Product Submittals minimizing project delays while assuring the highest standards of Quality Control are maintained within the project
• Consistency with all Daily Reports, Certified Payroll and Quality Control Reports assuring all information to be accurately documented and compliant with procedures eliminating unforeseen delay’s in progressive payment
• Experience with RFI, RFP, Submittal, Change Order, Inspection, Job Costing, Short Term Scheduling, Labor Projection, Contract Negotiations and Safety Procedures
• Supervision of 40-75 employees self performing framing, drywall, insulation, exterior siding, windows, doors and interior finishes
21+ years successfully managing and supervising sub contractors and self performing crews in Structural Concrete Forming, Placement & Reinforcement, Pre Cast Concrete, Embedded Metals, Structural Steel, Water Proofing, French Drains, Backfill & Compaction, On Site & Off Site Infrastructure, Underground Utilities, Paving, Landscape, Elevations, Lines, Grade and Layout. Familiar with high strength concretes, corrosion resistant high strength reinforcing, High Altitude, Cold and Hot Weather applications, wet and dry utilities. Projects estimated value from $2 million to $265 million
• Supervision of self performing crews with 75 + employees on multiple projects at one time in 2 different states
• Form, Grade, Place and Finish 500,000+ cubic yards of Slab on Grade Concrete
• Erect Scaffold, Deck, Place and Finish 300,000+ cubic yards of CIP subterranean parking structures
• Construct, Erect and Place Concrete in 15,000+ linear feet of 12-32 foot high wall structural concrete
• Layout, Form and Place Concrete in 10+ miles of onsite and offsite work
• Layout and Placement of 10,000+ tons of concrete reinforcing
• Layout, Form, Place Concrete and Panel Erection on 5+ million sq feet of concrete tilt up
• Supervision of self performing crews with 20-25 employees installing 10+ miles of Underground Utilities
• Over-excavate and re-compact more than 3.5 million tons of earth creating accurate GPS mapping of testing and samples for as built documentation
6 years experience with Land Acquisition, Conceptual Master Planning, Entitlement Process, Pre Construction Management and Design Build interfacing with Planners, Architects, Engineers, Designers and Tenants as the Owner’s Representative for several Mixed Use Residential Master Planned Communities comprised of more than 4,000 total acres. Projects included several 3 star hospitality projects, two 4 star hospitality resort & spa projects, 4,700+ multi and single family residential units, 3+ million sq. ft of commercial, retail, restaurant, office and warehouse projects, elementary and high school properties, fire stations, realignment of collector roads, upgrading of existing infrastructure, new electrical sub stations and water tanks with numerous detention facilities, community parks, recreation centers and more than 15 miles of trails systems.
Performed research and due diligence on a multiple other projects for large development groups throughout Arizona, Nevada, California and Utah consisting of 2,500 to 15,000 acres of land for future development of mixed use master planned communities including golf courses and other major recreational development. Projects would have required the development of new and complete infrastructure systems including water systems, roads, electrical sub stations, gas, fiber optics, waste water treatment plants, educational facilities and much more.
• Resolved Public Community, School District concerns and pre development issues by 90% prior to Development
presentation to City Planning and Zoning minimizing delays in project approval
• Commended by School District for addressing and resolving issues of concern regarding traffic, school crossing and child safety in new and existing communities.
• Commended by Town Council members for completing thorough due diligence research in preparation and professionalism in means and methods of presentation.
• Town Council noted recommendations to consider restructuring the Cities current procedures incorporating into their land planning requirements for future development projects.
• Commended by Fire Department for a variety of accessibility to all structures within the project design
• Design Build recommendations eliminating numerous additional costs for improvements to existing infrastructure while reducing impact on production, scheduling, traffic congestion and potential unforeseen project delays.
EQUIPMENT
Capable of operating various types of machinery and equipment such as; reach fork lift, fork lift, boom lift, scissor lift, bobcat, skip loader, water truck, ditch witch, air compressors, sand blasting, articulating loader and backhoe.
OFFICE
Computer experience includes Microsoft Word, Word Perfect, Excel, Works, Outlook, Xactimate, Quick Books, Citrix and Pro Log. I am currently learning Microsoft Office Project and researching online and evening schooling requirements to obtain an Associates and/or Bachelors Degree in Construction Management and Project Management.
CERTIFICATIONS
During the last 6 years, my employment has been in the master planning and development field where certification requirements were not necessary and I unfortunately allowed them to expire. I am currently reviewing the most recent issue of the EM385-1-1 manual while researching online requirements to recertify for EM385 10 Hour, OSHA 30 Hour, SWPPP, Hazwopper, CPR, Fall Protection, Scaffolding and several others.
1976-1983 Emergency Medical Technician / State of Utah
LANGUAGES
Advanced Beginner / Spanish - Currently improving language skills through Rosetta Stone web based software
REFERENCES
A full list of supervisory and executive references to verify all work listed is available and will be provided upon request
PROJECT SUMMARY:
2009 GENERAL SUPERINTENDENT / CHINA LAKES NAVAL WEAPONS AIR STATION / RIDGECREST, CALIFORNIA
Coordinate all activities for the start up of three projects at China Lake Naval Weapons Air Station. Review and comment on structural, civil and architectural drawing during design build phase, identify existing underground utilities, set up main office and job site office trailers, map and install construction fencing. Temporary 90 day employment to assist past employer with project start up allowing GC the time required to staff the project accordingly. Contract value at $63 million.
2003-2009 PRE CONSTRUCTION MANAGER / PROJECT FACILITATOR / STATE OF UTAH
Project Development and Land Acquisition for several Mixed Use Master Planned Communities including Entitlement Procedures, Pre Construction and Design Build requirements interfacing with Master Planning Groups, Architects, Engineers, Real Estate Brokers, Designer’s and City Municipalities as the Owner’s Representative including sub contractor selection and pre-qualification. Projects encompassing 100 to 2,450 total acres with property values of $15 million to $165 million with constructed values from $65 million to $650 million each.
2000-2003 STRUCTURAL SUPERINTENDENT / CONCRETE SUPERINTENDENT / CALIFORNIA & ARIZONA
Coordinate and supervise all sub contractor activities for Structural Concrete, Concrete Reinforcing, Structural Steel, Embedded Metals, Pre Cast Concrete, Brick Veneer, Waterproofing, Paving, Landscaping and Underground Utilities at various Military and CIP Structure. Supervise self performing crews of 12-18 employees performing all phases of concrete construction on military and educational projects. Estimated value $38 million.
1999-2000 CONCRETE SUPERINTENDENT / LAS VEGAS, NEVADA / PROJECT EMPLOYMENT
Supervise and manage concrete crews of 50 to 75 employees self performing all phases of grading, forming, reinforcing and concrete work on a 5 month fast tracked concrete tilt up warehouse project with 55 loading docks. Usage of laser grading, laser screed concrete placement of 50,000 sq ft SOG each day and 30,000+ sq. ft of tilt up panels per day. Project consisted of one building at 700,000 sq ft SOG w/340,000 sq ft concrete tilt-up panels & 1.2 million sq ft of parking area. Fast track project starting September 15, 1999 with Cof O January 7, 2000 Estimated value $52.5 million
1998-1999 STRUCTURAL SUPERINTENDENT / ASSISTANT PROJECT SUPERINTENDENT / LAS VEGAS, NEVADA
Supervising and working with self performing crews of 12 to 20 employees performing all phases of concrete work including layout, onsite, offsite, SOG, grading, concrete placement and finishing. Assist with schedule and coordination of all sub contractors successfully completing projects on time and within the budgets. Estimated value $19 million.
1997-1998 LAYOUT CREW FOREMAN / LAS VEGAS, NEVADA
Supervise 4-6 crews of 2 persons while self performing all layout, grade and elevation responsibilities at two major casino expansion projects with estimated values of $195 million to $380 million. Projects included Mandalay Bay Water Park, Mandalay Bay Special Events Center and Texas Station Casino Expansion and Pre Cast Parking Structure.
1996-1997 STRUCTURAL SUPERINTENDENT / ASSISTANT PROJECT SUPERINTENDENT / LAS VEGAS, NEVADA
Supervising and working with self performing crews of 12 to 20 employees performing all phases of concrete work including layout, onsite, offsite, SOG, grading, concrete placement and finishing. Assist with schedule and coordination of all sub contractors successfully completing projects on time and within the budgets. Projects ranging from $19 to $38 million.
1996 PROJECT MANAGER / QUALITY CONTROL / LAS VEGAS, NEVADA / PROJECT EMPLOYMENT
Oversee various crews of 30 to 75 employees self performing all phases of grading, forming, reinforcing and concrete work on a 5 month fast tracked concrete tilt up warehouse project with various loading docks. Buildings range in sizes from 46,000 sq ft to 112,000 sq ft with 86 to 120 panels per building. Use of laser screeds for SOG and roller screeds for panels during concrete placement assuring successful completion of the project within the budget as per the contract documents with no loss work days. Project consisting of 10 total buildings with approximately 560,000 total sq ft of SOG and 450,000 sq ft of tilt up panels with an estimated value of $26.5 million
1996 PAINTING & DRYWALL SUPERINTENDENT / TEMPORARY CONTRACT EMPLOYMENT
Company troubled with inadequate supervision, insufficient labor and more than 90 days behind schedule on a 560 unit high end multi family residential project in Fresno California creating potential legal issues for sub contractor. Reestablished schedule of values and confidence with owner’s representative and general contractor, developing a sufficient labor pool, open local office, established local vendors for supply and bring scope pf work current with construction schedule. Eliminated all 90 schedule delay date penalties and $280,000 in additional back charges from General Contractor within a temporary 60 day period allowing the sub contractor adequate time to properly staff the project with management
1993-1995 STRUCTURAL CONCRETE SUPERINTENDENT / CIVIL SUPERINTENDENT / LAS VEGAS, NEVADA
Supervise 15 to 45 employees self performing all concrete work on various retail shopping centers, grocery stores, cold storage facility, military, CIP industrial and public works projects ranging in size from 50,000 sq ft to 1 million sq ft. Estimated project values from $1.2 million to $21 million. Work included layout, onsite, offsite, SOG, grading, reinforcing, water stops, interior columns, shoring, decking, embedded metals, tilt up panels, concrete placement & finishing and panel erection. Supervise12-20 employees self performing excavation and installation of wet & dry underground utilities, backfill and compaction with 11,000+ feet of underground utilities with estimated values ranging from $2.5 million to $6 million.
1992-1993 CONCRETE ESTIMATOR / QUALITY CONTROL / SEATTLE, WASHINGTON
Estimate and perform Quality Control on all phases of concrete projects in Washington State and Oregon including residential condominiums, bridges and overpasses, state truck scale, state and federal prison additions and a multiple of other government projects within their bid limits of $800,000-$2.5 million each
1987-1991 PROJECT / CONCRETE SUPERINTENDENT / SAN DIEGO, CALIFORNIA
Supervise self performing crews of 12 to 35 employees in all phases of concrete work and coordinate all sub contractors on various multi million dollar military and public works projects throughout Southern California successfully completing all projects on time and within designated budgets. Project values range from $1.2 million to $22.9 million and vary in sizes from 29,000 sq ft to 165,000 sq ft. Responsibilities included all layout, grading, forming, reinforcing, shoring, decking, anchors, concrete placement and finishing of SOG and all levels of multi story steel framed buildings & CIP Structures in addition to multiple waterfront projects requiring numerous dewatering wells. Complete all daily reports, material orders, and inspections while maintaining a zero lost work day safety record.
1983-1987 GENERAL / STRUCTURAL / CIVIL SUPERINTENDENT / SOUTHERN UTAH
Supervise self performing crews of 20 to 75+ employees in all phases of concrete work on multi million dollar projects in 2 different states including layout, grading, forming, reinforcing, shoring, decking, anchors, concrete placement and finishing. Supervise self performing crews consisting of 15-25 employees in all facets of underground utility work including excavation, installation, backfill and compaction of wet and dry utilities on various multi million dollar projects. Supervise self performing crews of 40 to 75+ employees in all phases of framing, drywall, insulation, interior finish and exterior siding work on multi million dollar multi family projects. Multiple projects located at 9,500 feet elevation with 7 foot frost levels and extreme cold weather conditions.
1972-1983 FRAMING CARPENTER / CONCRETE FINISHER / CREW FOREMAN / UTAH & ARIZONA
1970-1972 PLUMBERS HELPER / CARPET INSTALLER & TILE SETTER / PHOENIX, ARIZONA
A more complete and detailed work history is available upon request.