Post Job Free
Sign in

Engineer Project

Location:
Kota, RJ, 323307, India
Salary:
45,000
Posted:
July 15, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

SUBODH KUMAR DEY

E-mail: med6ze@r.postjobfree.com, med6ze@r.postjobfree.com

Mb: 075********, 080********

Career Objective

To develop my career as a highly talented associate where I will be a valuable team member, contributing quality ideas and work for an organization where there is an ample scope for individual as well as organizational growth.

Educational Qualification

Bachelor in Mechanical Engineering (B.E) From R.C.E.R.T. College, Jaipur, (Rajasthan University.)-2007

Additional Qualification

Welding awareness program (2 days) from JSNT Gurgaon.

The two days program covers the following contents as given below:

• Familiarization with different types of Welding processes and joint preparation.

• Introduction to Welding metallurgy, Preheating and Post Weld Heat Treatment (PWHT) Processes.

• General introduction of ASME section IX (PQR, WPS and WPQ).

• C, C++, AutoCAD, MS Office & Power Point from NIIT,(National Institute of Information & Technology, Rawatbhata, Kota.Rajasthan.

• Holder of ASNT-SNT-TC-1A-Level-II for Ultrasonic Testing

• Holder of ASNT-SNT-TC-1A-Level-II for Magnetic particle Testing

• Holder of ASNT-SNT-TC-1A-Level-II for Liquid Penetrant Testing

• Holder of ASNT-SNT-TC-1A-LEVEL-II for Radiographic Testing.

• Holder of ASNT-SNT-TC-1A-LEVEL-II for Visual Testing.

• Training for Inspection of Storage tanks. (2 weeks).

Work Experience: 05 Years

From 09 Jun.2011 to TILL DATE

Working as : QA/QC ENGINEER

Company Name: SHANDONG ELECTRIC POWER CONSTRUCTION NO.1 COMPANY

Project Name : TALWANDI SABO PROJECT (4x660MW).

: SUPER CRITICAL BOILER.

Client Name : VEDANTA

Role & Responsibility:

• To do PMI and spector analysis for all alloy metal and welding like T12, T22, T91, P12, P22, P91.

• Procedures Qualification (PQR, WPS) as per the guide line of ASME section IX.

• Qualification of Welder’s performance (WPQ) as per the guide lines of ASME Sec-IX.

• To arrange all Fabrication work for all IBR Welder in pressure parts(Economizer system, Circulation system, Super heater system,Re-heater system) and alignment check up and carry out the inspection work.

• Interpretation of RT films as per ASME code.(skill)

• Welder Qualification test (IBR)

• Prepair DPR for Pressure part weld joints.

• We are working all material like (SA335P91, 12Cr1MoVG, 15CrMo, SA210 Gr.C, SA10Gr.C etc.)

• Maintaining all PHWT Report.

• To study the P & ID and other circuit diagrams in the test pack

• To carry out line punching during the test pack internal review and assistance for the report preparation Witness of hydro test and pneumatic test of piping.

• To check and prepare flange alignment report.

• To carry out PT and report preparation. Preparation of RT selection list for the daily radiography work. Inspection and testing activities as per the inspection procedure.

• To check the fit up stage prior and confirm the root gap, off set, bevel angle are within to witness MPT of fillet joints and check the surface defect.

• To select the joint for the NDT as per the welder coverage and line class percentage.

• Control calibrated measuring and test equipment used on the project.

• Maintaining of all inspection report and related documents in QA/QC department.

From 27 Jan. 2011to 01 Jun. 2011.

Working as QA/QC ENGINEER

Company Name: METAL CRAFTS CONSTRUCTION PVT. LTD.

Project Name: DFCU & AU PROJECT, DAHEJ, GUJRAT

Client Name: SAMSUNG ENGINEERING CO. LTD.

PMC : EIL

Role & Responsibility:

• Review job specification/codes/standards for requirement for project/Owner

• Tool Box talk of welders, fitters and helpers about joint design, types of materials, use of different type of welding consumable, cause of welding defects & method of control welding defects during welding etc.

• Visual & stage inspection of welding(GTAW,SMAW,GTAW+SMAW)

• Welder Procedure qualification.

• Co-ordination with NDT inspectors (RT offering,status of daily radiography clearance,repair status, final clearance of spool related to NDT)

• Witness of pressure testing as per the requirements of approved procedure and final clearance of records by client in all aspects

• Inspection of wrapping & coating work in U/G piping

• Inspection of Holiday test & peal test in U/G piping.

From 01 Oct, 2008 to Jan.21, 2010.

Working as ASST. QA/QC ENGINEER

Company Name: L&T

Project Name: Mundra Power Project (Gujarat )

Client Name: Adani Power Ltd.

Job Description:

• Visual & stage inspection of welding(GTAW,SMAW,GTAW+SMAW)

• Monitoring welders and control repairs

• Welder Procedure qualification.

• Stress relieving of joints, Non-destructive testing (RT, DPT, MPT, and UT).

• Pneumatic testing, Hydro testing

From 01 July, 2007 to 21 Sep. 2008.

Working as EXECUTIVE ENGINEER

Company Name: Kidde India Limited

Project Name: Rajasthan Atomic Power Project 5 &6, Kota, Rajasthan.

Client Name: NPCIL

Job Description:

• Fabrication & Erection of CS piping(GI)

• Fabrication & Erection of Structural supports

• Analysis of discrepancies in drawings, Preparing Protocols,DCR

• Preparing the monthly target with completion schedule.

• Estimating of materials in case of supply and fabrication

Personal Details

Fathers Name : Suresh Kumar Dey

Nationality : Indian

Marital status : UnMarried

Languages Known : English and Hindi

Permanent and communication address : T-IV Anu Tara Colony

Rawat Bhata, Via-Kota

Rajasthan-323307

Declaration

Here by I declare that the information produced is true to the best of my knowledge.

Date:

Subodh Kumar Dey



Contact this candidate