Ir. MUHAMMAD NADZRI HUSIN
PERSONAL DETAILS
Date of Birth : 09 May 1974
Marital Status : Married
Nationality : Malaysia
I/C No : 740***-**-****
Tel No. : +601*-*******
Email : *******@*****.***.** or
***********@********.***.**
Address : No.6 Jalan 7/2E Bangi D’7 Bandar Baru Bangi 43650 Selangor Malaysia
EDUCATION/QUALIFICATION
Degree in Naval Architecture & Ocean Engineering - University of Glasgow.
Registered Professional Engineer with Board of Engineer Malaysia ( Reg No. 13361)
Corporate Member of Institute Engineer Malaysia (IEM)
COURSE ATTENDED
Super User for Ship Design software “FORAN” in Madrid, Spain.
Basic Design - Hull Form Design
Basic Design - Stability & Damage Stability
Ship Management Audit Training
Project Planning & Implementation
DNV Superintendent Management Course
ISO 9001/2000 Course
H.S.E.M.S PETRONAS Course.
Writing and communication Skill.
Workshop for SBM maintenance.
BOSET Course for PCSB Offshore Passport
Port Facility Safety Officer (FPSO)Course
Floating Production Storage Offloading (FPSO)Course
CSWIP 3.1 Welding Inspector Level 2.
EXPERIENCE
1. PRESENT EMPLOYER : PETRONAS MARITIME SERVICES SDN BHD
Level 16, Menara Dayabumi
Jalan Sultan Hishammudin
50050 Kuala Lumpur
DEPARTMENT : MARITIME SERVICES AND CONSULTANCY DEPARTMENT
GENERAL JOB SCOPE (from 2002 to 2005):
1. Conduct Consultancy Services and Study.
I.e. A. Conditional Survey for Upstream Activities PCSB
B. On-Hire/off Hire Survey
C. Construction Supervision of Vessel and Marine Project.
2. Conduct Tendering Exercise and Develop Technical Specification.
PETRONAS Tendering Process
Pre-Tendering
• Technical Specification/Scope Of Works
• Pre-Screening Of Bidders
Contracting Strategy
• Project Brief And Scope Of Works
• Contracting Approach And Schedule
• ITB Synopsis
• Bidders’ List
Bidding
• Bid Issuance
• Pre-Bid Conference/Tender Briefing/Site Visit
• Communication With Bidders
• Receipt And Custody Of Bids
Evaluation Of Bids
Evaluation Criteria
3. Conduct Marine Audit on PETRONAS Term Chartered Vessels for
Downstream and Upstream activities. (MITCO, LPPG & PCSB)
4. Conduct SBM Inspection & Maintenance.
5. Project management on Vessels construction for KPSB, SUPSB & PCSB.
Sept. 2010 – Current 2012
Project Assignment : Conversion and Life Extension of FSO SEPAT for PETRONAS Carigali Sdn. Bhd.
Position : Head of FSO SEPAT
Scope of Work : Managed and lead the plan, execution, control and supervise engineering work activities and perform project execution activities from contracting strategy, technical & commercial evaluation, contract execution and budget observation throughout conceptual and detail design, fabrication, installation, testing and commissioning.
April 2007 – August 2010
Project Assignment : Conversion and Life Extension of FPSO RUBY II for PETRONAS Carigali Vietnam Ltd
Position : Senior Naval Architect
Scope of Work : Plan, execute, control and supervise engineering work activities and perform project execution activities from contracting strategy, technical & commercial evaluation, contract execution and budget observation through out conceptual and detail design, fabrication, installation, testing and commissioning of surface facilities particularly in Naval Architect/Structural Engineering for FPSO RUBY project in line with company policy/objectives to ensure reliable and successful implementation which is critical to operational needs.
Provide total technical integrity solutions and expertise through technical review/compliance check and specialised studies; and continuously assess and enhance facilities design concepts, strategies, philosophies, standards and specifications to domestic and international.
Involve in Project activities such as Hazard and Operability Study (HAZOP), Project Integrated Review (PIR), Project Risk Assessment (PRA) etc in compliance with PETRONAS Technical Standard (PTS); international codes and standard, and best practices; local authorities or government regulations.
Detail scopes but not limited to the following:-
Responsible for management of FPSO conversion/modifications work, including hull, turret, topsides and mooring system.
Responsible for turret & helideck engineering & construction
Responsible for Ship Accommodation area modification and renewal.
Responsible for PLEM & Risers engineering & construction
Conduct material inspection as per applicable codes, standards and clients specifications
Check the welding procedure/processes as per approved welding procedure specifications.
Check/review IFC drawings to ensure fabrication is working according with the latest revision.
Monitor the works in progress and ensure conformity and consistency of application of the inspection procedure and other technical specifications.
March 2008
Project Assignment : Special Survey of MOPU and FPSO for PETRONAS Turkmenistan at Turkmenistan
August - Sept 2007
Project Assignment : Special Survey of FPSO RUBY PRINCESS for PETRONAS at Vietnam.
: Route Survey and Soil Boring Survey at Block 01 & 02 Vietnam water.
Jan 2006 – March 2007
Project Assignment : Conversion and Life Extension of FSO ABU CLUSTER for PCSB at MMHE, Pasir Gudang, Johor.
Position : Senior Naval Architect
Detail scopes but not limited to the following:-
Responsible for management of FSO conversion/modifications work, including hull, topsides and mooring system.
Responsible for turret (650 MT) & heli- deck (120 MT) engineering & construction
Responsible for 74” piles fabrication and installation.
Responsible for Ship Accommodation area modification and renewal. (30persons to 45 persons)
Responsible for Mid Water Arch & Anchor Block engineering & construction
Conduct material inspection as per applicable codes, standards and clients specifications
Check material specifications and types prior to layout, cutting and fit-up.
Check the welding procedure/processes as per approved welding procedure specifications.
Check/review IFC drawings to ensure fabrication is working according with the latest revision.
Monitor the works in progress and ensure conformity and consistency of application of the inspection procedure and other technical specifications.
Monitor weld repair works to ensure it is being carried out in accordance with the technical specification.
Inspect the installation of structural steel works for conformity ensuring correct configuration and weld preparation (i.e. straightness, levelness and ovality)
March 2006 – September 2006
Project Assignment : Construction of Turret and cantilever for FSO ABU CLUSTER at B.T Engineering Tuas, Singapore.
Position : Naval Architect
March 2006 - September 2006
Project Assignment : Construction of Mid Water Arch for FSO ABU CLUSTER at Hup Seng Engineering Services at Tuas, Singapore.
Position : Naval Architect
November 2005 – December 2005
Project Assignment : SUDAN Project for SBM-2. Operation and maintenance of SBM -2. Bidding the contract for Petronas Maritime Sdn Bhd.
Position : Project Coordinator
September – November 2005
Project Assignment : Pressure test and Installation Floating hoses for Armada Perkasa and Baram-E Platform at Baram Field, Miri.
Position : Project Coordinator
January – September 2005
Project Assignment : Construction of 2 units Tug Boat at Sumber Samudera Shipyard, Teluk Intan, Perak for Kerteh Port Sdn Bhd.
Position : Naval Architect
Jan 2005 – August 2005
Project Assignment : Construction of one unit Patrol Boat 7.5 m. at Sumber Samudera shipyard, Teluk Intan, Perak for Sungai Udang Port Sdn Bhd.
Position : Naval Architect
Jan 2005 – August 2005
Project Assignment : Construction of one unit Mooring Boat at Port Shipyard, Port Klang for Kerteh Port Sdn Bhd.
Position : Naval Architect
August 2003 - Dec 2003
Project Assignment : Project Maintenance Dredging & Beach Nourishment at Kerteh Port Sdn Bhd
Position : Maintenance Dredging’s Superintendent
January 2003 – Dec 2004
Project Assignment : Single Buoy Mooring (SBM-5) SKO - Quarterly
Inspection & Maintenance
Position : SBM Surveyor & Project Engineer.
May 2003 - July 2003
Project Assignment : Tug Boat Modification on Armada Teja at Miri
Position : Naval Architect
December 2002 - Feb 2003
Project Assignment : Tug Boat Modification on Armada Lekiu at Miri
Position : Naval Architect
June 2002 – Dec 2004
Project Assignment : Shipmanagement & Vessel Audit
Project Assignment : Vessel Inspection (Upstream vessel)
Position : Auditor & Surveyor
2. EMPLOYER : PSC NAVAL DOCYARD SDN BHD
TLDM NAVAL BASE
Lumut, Perak
Oct 2001 - May 2002
Project Assignment : Offshore Patrol Vessel (OPV) for Royal Malaysia Navy
Project Assignment : Penang Ferry for Penang Port
Project Assignment : Tall Ship for Royal Malaysia Navy. (Proposal - Fwd Design)
Position : Naval Architect
Scope of Work : Perform Basic & Detail design of Hull Structure design. Perform Intact & Damage Stability calculation.
Sept. 2000 - Sept. 2001
Project Assignment : Project Attachment at Blomn & Voss Shipyard, Hamburg, Germany for OPV RMN.
Position : Naval Architect
Scope of Work : Attached to Blomn & Voss Design office:-
Perform Basic & Detail design of Hull Structure design. Perform Intact & Damage Stability calculation.
Jun 2000 - August 2000
Project Assignment : Foran Super User Training in Madrid Spain
April 1999 - May 2000
Project Assignment : Conceptual Design - Forward Design Department
Diving Tender Vessel - (RMN)
Landing Ship Troop (LST) - (RMN)
Offhore Patrol Vessel (Iran)
Fast Ferry Various Type - RMN, Iran & Others
Target Barge (RMN)
Position : Naval Architect
3. EMPLOYER : LINTASAN KIRANA SDN BHD
Kota Bharu, Kelantan
Sept. 1998 - March 1999
Project Assignment : Sub- Contractor on Building and Structure Construction for Kementerian Kesihatan
Position : Site Engineer
4. EMPLOYER : DREXEL BAKTI OILFIELD SERVICES SDN BHD
Kemaman Supply Base
Kemaman, Terengganu
Nov. 1995 - June 1996
Project Assignment : Maintenance Services for PETRONAS CARIGALI & ESSO
Blasting & Painting
Pipeline
Fabrication
Position : Project Estimation
References:
1. Tuan Hj. Ir. Intizam Ayub
Ex PETRONAS Maritime Services Sdn. Bhd.
Resident Engineer for FPSO CTOC, Korea
Resident Engineer for FSO ABU CLUSTER, MMHE
Marine Engineer for MOPU Project PCPP
HP: 006-019-3521385