Post Job Free

Resume

Sign in

Project Manager Engineering

Location:
Huntersville, NC, 28078
Salary:
90k
Posted:
November 29, 2011

Contact this candidate

Resume:

**** ******** ****, ************, ** *****

704-***-****

E-mail m4rj1s@r.postjobfree.com

Theodore R. Harmon

Objective

Field Experience

A position that will foster growth potential, utilizing my field experiences as well as my financial background within a corporation, in order to further my career.

September 2009-Present

Merryman Excavation Inc., Woodstock, Il Estimator/Project Manager

• To analyze plans in order to price and develop constructability

• Contact subcontractors and vendors to get project pricing

• Develop construction strata gee to build the project with the bid price

• Get questions answered on project prior to bid time to make bidding more equal

• Work with vendors to get better pricing for bid

• Work with Subcontractors to get better pricing

• Worked with the City of Indianapolis on the installation of a 42” Force main, installing it through residential streets that rehabilitate the streets after.

• Prepared schedules for Project

• Prepared the Pay Estimates

• Prepared Change orders to the contact

March 2009-September2009

City of Charlotte with Association with Hinde Engineering

• Work with Engineers to provide budget estimates for up coming projects

• Review plans and specs on projects for problems in constructability

• Work with Engineers and City Project Engineers for Change Order Pricing

January 2009-March 2009

Southeast Pipe Survey, Inc. Atlanta GA Project Manger

• Schedule 9 new projects from Myrtle Beach to Columbus GA, and monitor them daily

• Set up material and Sub-contractor submittals to project engineers

• Worked as project superintendent as well as project manager in getting projects started and maintain schedules

• Negotiate change orders with Owners Representatives

• Set up Sub-Contracts

• Visited projects weekly and met with owners representatives as well as site field supervision

• Monitored Jobs daily with HCSS Heavy Job

• Schedule project with Microsoft Project

May 2006 thru November 2008

KIP Corporation Charlotte, NC Project Manager

• To schedule and receive in coming potential jobs to bid

• Bid the projects with HCSS Heavy Bid

• Dirt and Pipe takeoffs with Agteck

• Take off the potential jobs and estimate there valves using Agtek and Heavy Bid Software

• Negotiate them owners or owners representatives for the work

• Schedule the work and monitor the work for potential job cost savings

• Monitor the jobs

• Oversee the hiring of the field workers

• Organize the office for more efficient paper work flow

• Oversee the monthly billings of the jobs

• Oversee the sigh off of payables

• Help develop new areas in which to expand the company’s future

August 2002 thru March 2006

Allied Resources USA, LTD. Huntersville, NC General Manger/ Vice President Operations

• Administered contracts through all phases of jobs (inception and occasionally through litigation)

• Oversee the take offs and estimates of the plans and prices of perspective jobs

• Oversee and guide the Financial Administration team through the processes of P&L, cash flows, billings, and capital purchases

• Work with the Project Mangers in scheduling and problem solving to increase the profitability of ongoing contracts

• Train Production Managers in how to best make use of company assets

• Recruiting of new employees to fill the key positions

• Develop a feasible long term growth plan for the company while identifying new target areas to increase client base/market share

• Developed and trained employees in the use of the Computer systems

• Worked with the Local Municipalities and Project Owners to cut costs by value engineering of their projects in order to increase our profits and reduce client expenditures

• Maintain strong client and subcontractor relations

• Evaluate equipment needs and handle purchasing process

• Worked with Paydirt software for project takeoffs

While I started my professional career in 1981 as an accountant and went from a Sr. Plant Accountant to a Controller within 2 years. I later became a Financial Controller for a Retail/Manufacturer till 1988, when due to the down turn in this retail business I started working as a pipelayer and quickly vaulted to project formen/superintendent. I have worked on all aspects of utilities and road improvement, including bridge installations over the thruway and canal. I have worked on NCDOT, SCDOT and NYDOT projects and various City projects. I also have vertical construction experience as a project manager/superintendent on various schools in NC and SC. I am very willing to share all my experiences through in future contacts.

Education/ Certificates

B.S. Degree in Business Administration/Accounting (R.I.T.) 1980

N.C.D.O.T. Roadway Tech (Asphalt)

Mecklenburg Country Land Development - Erosion Control

Trench & Safety Competency Certificate

10 hour OSHA Training

AIA Contracts

References

William Deal, PE Utilities Coordinator Charlotte Meckl Utilities

704-***-****

Chris Pool, VP Mainline Supply

704-***-****

Kevin Hinde President Hinde Engineering

704-***-****



Contact this candidate