Derrick Lim, Geotechnical Engineer, M.Eng.

#***-**** ****** ****** ******* B.C. Canada, V5H 1P2 • 778-***-**** • *********@*****.***

OBJECTIVE

Geotechnical Engineer, with 7 years experiences in Geotechnical projects seeking a geotechnical engineering position where I can contribute for your company.

SUMMARY

M.Eng. in Geoinfometric Engineering, Applied Geophysics

B.Sc. in Mining Engineering

Eligible to register as an Engineer in Training in BC

More than 7 years of experience in Geotechnical projects

Extensive experience in site investigations, laboratory testing, QA/QC of materials testing, geotechnical field inspection

Worked on projects totaling in excess of C$200 million

Proven experience Soil and rock investigation, Field tests, Installation of geotechnical measuring instruments, and technical report writing for the Construction of Bridges, Tunnels, Power plants, and High-rise residential buildings

Exceptional knowledge of foundation stability for the construction of bridge

Proficient in MS Office and other relevant computer software

Team player with problem solving skills

PROFESSIONAL EXPERIENCE & EMPLOYMENT HISTORY

SekoGEO,.Ltd, Field Engineer & Field Manager, South Korea (2007 ~ 2010)

Geotechnical Field Engineering Manager 2009 ~ 2010

Main duties :

Supervised of Site investigation, Fulfillment various field tests, Geophysical surveys and field engineer, data analysis

Consultation with client, technical report writing and presentation for clients

Project: Subsoil and rock investigation for construction of Gyung-In Canal and across bridges

About C$2.2 Billion project for 80m width, 18km length canal, 2.1km, 6 lanes and 2.2km, 6 lanes across bridges

CPT, Field Vane test for marine deposit soft clay layer and point load test, pressure meter tests for highly weathered rock layer which is the foundation of bridges

Geotechnical Field Engineer 2007 ~ 2009

Main duties :

Planning project, Site investigation, fulfillment various field tests, Geophysical surveys and management field operation

Data analysis, technical report writing and preparation of presentation for clients

Project: Sub soil investigation for the extensional construction of floodgate in A-San Bay (Yellow Sea)

About C$105.8 Million project

Investigation, geophysical survey, and other field tests carried out on the sea

Careful planning and execution of project caused by 8.5 m difference between low and high tide

Project: Investigation for the construction of Number 1 highway in Se-Jong new City

About C$250.8 Million project for 2.4km 8lanes open cut method tunnel

Obtained parameters for the consideration stability of 30 to 50m Cut slop

Project: Investigation for the construction of Gum river first bridge in Se-Jong new City

About C$200 Million project for 740m, 8 lanes great-bridge, three of small bridge(35m, 40m, 50m) , and 1.3km banking embankment access road

Project: Investigation for the construction of access-bridge to Song-Do International City

About C$200 Million project for 340m 6 lanes, 300m 6 lanes bridges

Made determination of existence of over 40m marine deposit soft clay layer

Dong-A consultant,.Ltd, Field Engineer, South Korea (2006 ~ 2007)

Geotechnical Field Engineer 2006 ~ 2007

Main duties

Planning project, Site investigation, fulfillment various field tests, Geophysical surveys and management field operation

Data analysis, technical report writing and preparation of presentation for clients

Project: Investigation for the construction of first apartment in Se-Jong new City

About C$643 Million project for 15 to 26 floors High-rise 2,242 householders residential Buildings

Field tests for anti-earthquake design (P-sP well logging test, downhole test)

Project: Investigation for the construction of energy facilities in southwest part of Dea-Jeon City

About C$149 Million project for 47.4MW Combined Heat and Power Plant

Field tests for anti-earthquake design (P-sP well logging test, downhole test)

Project: Sub soil investigation for the construction of Jack Nicklaus Golf course in Korea

946,852 m2, 18 hole Golf course with USA Company, Arup

Field tests for excess 40m marine deposit soft clay layer

Seismic P-sP well logging test, Piezometer installation and measurement, and long term consolidation test

Project: Investigation for the construction of flood control facilities in Yung-San River

About C$1.6 Billion project for flood control facilities include earth dam

Search through leaking point of clay core earth dam with geophysical survey and provided geotechnical parameters for the design of earth dam

Project: Investigation and foundation stability consideration for the construction of Am-Sa Bridge in Seoul

C$340 Million project for construction of 2.8km 6 lanes duplex bridge and Consideration stability of foundation

In-depth investigation for detecting faults

Project: Investigation for the construction of the proton accelerator

About C$128 Million project for 20MeV proton accelerator

Provided geotechnical data for the strong earthquake-proof design

Project: Geotechnical instrument installation and measurement for the construction of landfill in soft foundation

About C$885 Million project

Installation of clinometers, settlement plates and piezometers

Measurement of those instruments by log scale time

Project: Investigation for the construction of the Busan New port

552,000m2 reclamation project

The project included 6 floor office building, about 10km road and rail road

Siwon Development,.Ltd, Field Engineer & Research Assistant, South Korea. (2005 ~ 2006)

Geotechnical Field Engineer &Research Assistant 2005 ~ 2006

Main duties :

Planning project, Site investigation, fulfillment various field tests, Geophysical surveys and management field operation

Data analysis, technical report writing and Paper presentation

Project: Academic-industrial collaboration research

Consideration for Application of pole-dipole electrical resistivity array in borehole

Consideration for Application of alternative square electrical resistivity array

Soil and Rock logging, Field tests(pressure meter, shear strength meter, and Geophysical surveys)

Data analysis, technical report writing and write a thesis

Nakwon Construction,.Ltd, Field Engineer, South Korea (2004 ~ 2005)

Project: Land development for Mae-Gok factory

Planning the schedule of drilling machine and technician, Soil and Rock logging, Field tests for Residual soil and Highly weathered rock layer and Bed rock layer (Geophysical surveys, P-sP well logging test, Pressure meter test, and Selecting laboratory tests sample), Data analysis, and Technical report writing for 12 months

The project consisted by power plant, 6 floor main control building, 8.5km road, and 3floor low-rise residential buildings for employee

Hydoro Geotech,.Ltd, Field Engineer, S.Korea (2003 ~ 2004)

Project: Ground water development (tube well) for agriculture and livelihood water in country side

Geophysical survey(electrical resistivity survey), Management drilling, Construction of gathering groundwater well, Installation of water pump, Water quality analysis, and Technical report writing for the Construction of water supply system during 12 months

PROFESSIONAL EDUCATION

B.Sc. (Mining Engineering): Inha University, Incheon, South Korea

M.Eng. (Geoinfo Engineering, Applied Geophysics): Inha University, Incheon, South Korea

Registered in KCEA(Korean Construction Engineer Association) as a junior civil construction and Soil Foundation Engineer

Instructed safety education for field work

Scientifically trained by Korean Society of Earth and Exploration Geophysicists and The Korean Society for Geosystem Engineering

Instructed English technical report writing class

ADDITIONAL INFORMATION

Writing mathematics books of 10 grade, 11 grade, 12grade and AP calculus

Volunteer work in VICSS(Vancouver Immigrant Culture Service Society) as a AP Calculus teacher (2010)

Academic Research, The Limit of application Consideration in field, and Write a Thesis for Application of geophysical pole-dipole survey in borehole (2005)

Paper presentation in The Korean Society for Geosystem Engineering (The Korean Society for Mining Engineering, 2003)

Research Assistant for Application of geophysical alternation currency survey (2003)

Teaching Assistant for physics experiment (2003, 2004)

Academician of Mining Engineering Scholarship Forum (2003)

Teaching Assistant of Mining Engineering Data processing (2001. 3 ~ 2003. 3)

Second chairman in students' Union of Mining Engineering Department (1997)

Students' Union operation member of Mining Engineering (1996)

Computer Skills : AutoCAD, Res2D, Golden Suffer, MS Office, Illustrator, Photoshop etc

Interests : Studying English, Volunteer work, Academic, Travel