Post Job Free

Resume

Sign in

Construction Project Manager/Engineer

Location:
Glen Carbon, IL, 62034
Salary:
60,000/yr
Posted:
October 27, 2010

Contact this candidate

Resume:

Chad A. Bollman

*** ****** ***.

Glen Carbon, IL. 62034

Cell: 618-***-****

Email: ley787@r.postjobfree.com

QUALIFICATIONS

16+ years of surveying including 11+ years as crew chief. Experience in the following survey disciplines: topographic, boundary, commercial and residential construction layout, and industrial sites. Excellent communication skills with the ability to perform under pressure and meet deadlines. Honest, hard worker who enjoys working in the civil engineering field.

EDUCATION

1989-1993 Graduate of Edwardsville Senior High School

1993-1994 Belleville Area College - Attended on Athletic Scholarship

2008-2009 Lewis and Clark Community College - Started taking classes towards CAD degree before deciding to switch majors.

2010- ITT Technical Institute- Currently enrolled in Construction Management Degree Program

Other Training:

10-HR OSHA

Completed Level 1 Certified Survey Technician Exam

24 HR. Hazwoper Training

3 HR. Harness and Aerial Lift Training

2 Day Autocad Land Desktop and Civil 3-D Training

3 Day GPS RTK Training

Student Member of IPLSA

Survey Equipment:

Trimble S8, Wild T-1000, Leica TC-1100, Leica TCRP 1203 Robotic Total Station,

Wild T-2, Nikon NPL-522, Sokkia Set 3B2, Trimble 4700/4800 GPS w/TSC1, Leica DNA10

Digital Level, Leica NA2002 Digital Level, Leica NA2 and NA700 series Automatic Levels,

Trimble DiNi.

Data Collectors:

Trimble TSC2

Leica on-board Data Collector System

Sokkia SDR-33

HP-48 w/TDS

CAD Software:

Microstation V8

AutoCad Land Development Desktop 2i

AutoCad 2008 and 2009

Leica Geo Office Tools and Combined

Microsoft Office 2007

EMPLOYMENT

Dec 2009-Sep 2010

Survey Crew Chief: Parsons Corporation

Supervisor: Bo Mclauchlan

Survey Crew Chief responsible for work pertaining to construction of Salt Waste Processing Facility building at Savannah River Site as part of contract with the U.S. Department of Energy. Specific duties include, but are not limited to, layout and verification of formwork, layout and as-built of anchor bolts, layout and verification of wall penetrations and embed locations, layout of horizontal and vertical control lines, among various other duties.

May 2009-Dec 2009

Field Engineering, Survey Crew Chief: Bechtel Corporation

Supervisor: Steven Hall

Survey Crew Chief responsible for accurate data collection, topography, as-built data, construction layout,and field and office calculations. Heavy Industrial Construction of new coker unit as part of Conoco Phillips Wood River Refinery 3 Billion dollar+ expansion project. Specific duties included layout and as-built of anchor bolts, layout and as-built of formwork, checking plumb of various structures including tanks and pipe racks, process sewer and fire water line layout and as-built, performed routine maintenance of all survey equipment

2000-Now Survey Crew Chief: Crawford, Murphy, & Tilly, Consulting Engineers

Supervisor: Larry Stahlhut

1full year of working alone with robotic total station. Lead surveyor for topographic survey on MODOT’s I-64 pier retrofit project. Lead surveyor on construction layout of Erickson Retirement Community’s Welcome Center site in St Louis, Mo. Performed multiple surveys for The City of Edwardsville, IL., including; Gerber Road improvements, Hadley Ave. improvements and Lindenwood Ave. improvements. Lead surveyor on re-construction project for Greenmount Road in Ofallon, IL. Lead surveyor on layout of fiber optic lines on Lambert International Airport expansion for Schupp Construction from New York, NY. Performed various surveys for Wal-Mart, Applebee’s, and Supervalu. Crew Chief on numerous surveys involving $3 billion core project for Conoco Phillips Wood River Refinery. Lead surveyor for as-builts and stakeout on construction of new coker unit in Conoco Phillips Wood River Refinery as sub-contractor for Bechtel. Crew Chief on establishment of control and construction layout for Mckinley Bridge in St Louis, MO.

1999-2000Survey Crew Instrument Person: Kuhlmann Design Group

Supervisor: Ronald Bright

Member of survey crew responsible for locating all sewers in The City of Belleville, IL for sewer relief project. Member of survey crew responsible for surveying all parking lots for the Parkway School District in St Louis, MO.

1998-1999 Survey Crew Instrument Person: Zambrana Engineering

Supervisor: Michael Green

Responsible for construction layout of bolt patterns on piers of $75 million expansion of METROLINK in St Clair County, IL. Member of survey crew responsible for construction layout of downtown St. Louis City Jail. Member of survey crew responsible for topographic and r.o.w. survey for re-construction of Highway 21 in southern Missouri.

1994-1998 Survey Crew Instrument Person and Crew Chief: Koch & Associates

Supervisor: Ross Koch

Started at Koch & Associates as an instrument person and worked my way to crew chief. Crew member responsible for complete survey work on residential subdivisions from start to finish. Crew member responsible for construction layout on Motomart Gas Stations in southern Illinois.

1994-1994 Survey Crew Member/Rodman: Madison County Surveyors

Supervisor: Jeff Pauk

Worked as a rodman on such projects as subdivision layout, lot

surveys, cell phone tower lease areas, and construction layout. Responsible for maintenance of survey equipment and upkeep of survey work truck.

References:

Thomas Wille- PLS 618-***-****

Ross Koch- PLS and owner of Koch Surveying and Engineering 618-***-****

Larry Stahlhut- PLS 618-***-****

Jonathan Hipp- SIT 618-***-****



Contact this candidate