Amando B. Mendoza
Phone: 862-***-**** / 973-***-****
Cell Phone: 862-***-****
********@*****.***
Objective:
To obtain employment as Construction Cost Estimator, Civil/ Heavy Estimator, Project Management
Skills and Abilities:
Cost Estimator and Project Management with over 12 years of estimating experience working with US general contractors in the New Jersey/New York area. prepare cost estimates using required software. Budget preparation, quantity take-offs from blue prints, Prepare Changes Order based on RFI or RCO. Assist in preparing Cost/Duration Schedule, Contract Review and Administration. Coordinate with other departments to ensure a timely and successful end result.
Computer skills: Microsoft Office 2010 (Excel, Word, Access, Outlook)
•Timberline Estimate with Digitizer
•On Screen Take Off
•Heavy Bid (HCSS)
•MS Success Estimate with Digitizer
•Primavera
•Database Cost Management (Updated Material Cost, Labor & Equipment Rate, RS Means & Costwork)
•Contract Administration
•On-Site Earthwork
•Training/Seminar Attended: Success Estimator (New Jersey, USA)
Achievements:
Cost/Budget Control Engineering, Cost Engineering (Computer Analysis), Contract Review and Administration, Estimator (MS Success Estimate, Timberline, Bid (HCSS), On Screen Take-off (OCS), Prepare Cost/Duration Schedule (Primavera), Project Management/Supervision, Site Development Project, Bridge and Highway, Heavy Civil Engineering & Dam Construction, Utilities & Piping Installation, Construction of Hi-Rise Building, Scheduling, Tunneling Excavation and Concreting, Power Plant Engineering, Water & Desalination Plant Construction. Waste Water Treatment facilities Construction, Industrial Plant Construction, Surveying Works, Piping, Subway Cavern, Subway Rail Track and Subway Station on Civil, Structural and Architectural Works. Construction & Project Management/ Supervisor.
Professional affiliations:
American Society of Civil Engineers (ASCE)
Association for Advancement of Cost Engineer, (AACE) International, USA
Canadian Council for Technicians & Technologist
Education:
Bicol University, College of Engineering
Bachelor of Science Degree in Civil Engineering
Legazpi City, Philippines,
Certificates:
Construction Management Seminar
TCGI Engineers – Manila, Philippines
Project Cost Control & MS Success Estimate
Training at Merck Co., Inc.
Somerset, New Jersey, USA (July 1998 - Training for 3 months)
Employment:
Toscano Clements Taylor LLC From: 09/ 2011 To: Date
Bound Brook, NJ
Cost Estimator / Project Management
• Develop competitive estimate as basis for bidding, negotiate the bid to clients, review & analyze plan before quantity take-offs.
• Estimate materials, labor & equipment for project for commercial, site & civil works, transportation, piping and utilities, waste treatment, architectural & structural (steel and concrete), demolition, deconstruction and abatement. Prepare Change Orders based on RFI’s. Assist in Contract Review and Administration.
• Prepares project cost summaries that includes cost for material, labor, equipment, general conditions, overhead, profit, escalation & markup. Obtain pricing from vendors/ subcontractors.
• City University New York (CUNY) - Medgars College, NY $8 MM
• New York City SCA School Buildings New & Renovation Project, varies up to $50MM
• DASNY New & Renovation Project, SUNY Oneonta and other project varies up to $25MM
• Westchester County Airport, White Plains, NY Baggage Screening Center Facility $25MM
• Albany County Airport, Renovation and Sand Facility $ 5MM
• New York City SCA School Buildings New & Renovation Project, varies up to $50MM
• SUNY Farmingdale Day Care Center and Conklin Hall $40MM
• NYU Langone Medical Center – Change Order for 4th Floors to 16th Floor Architectural, piping, and Structural, waste treatment area, ultrasound room, muskoeskeletal room,
• The Daily News, NY - Change Order for Architectural and equipment
• Underpass Bridge, Abutment, Asbestos Abatement & Heavy Civil work $30MM
• New York Citywide Administrative Service Building Renovation 8th to 24th floors to tower.
• Used Timberline, On screen takeoff, Heavy Bid(HCSS), MS Office 2010
VJ Associates From: 10/2006 To: 09/ 2011
Hicksville, New York
Cost Estimator / Project Management
•Estimate materials, labor & equipment for US Government Projects such as transportation, buildings, hospitals, schools, and other private companies both commercial and residential. The estimates were for site & civil works, piping and utilities, waste water treatment, architectural & structural (steel and concrete). Prepare Change Orders based on RFI’s. Assist in Contract Review and Administration. Project Management & Supervision Works.
•MTA/ NYCT No. 7 Subway Project, New York City (tunneling, civil work, high rise buildings & stations = $2.5 BILLION with Parsons/Brinckerhoff (PB) – Estimate & Project Management Works
•MTA/NYCT No. 7 Subway Project-PBTA Access Bridge
•Harrisburg, PA Multi Storey Courthouse
•New Jersey Public Health, Environmental & Agricultural Lab, NJ = $120 MM
•23-25 Wooster Street, 325-327 West Broadway, New York City = $30 Million
•Manhattan Garage District 6/ 8/ 8A, New York City, $180 Million
•Atlantic Avenue Extension & 94th/95th Avenues Road Upgrade
•Skidmore/ Scribner Village Roadways, Utilities and Dormitories Construction
•NYC DEP – Rockaway Water Pollution Control Plant
•Jacob Javits Center – Performed the Estimate for exterior and interior architectural finishes restoration
•NYC DEP - Hillview Reservoir Improvement
•Atlantic Avenue Extension & 94th/95th Avenues Road Upgrade
•City University New York (CUNY) Science Research Center, NY = $230 MM
•New York City SCA School Buildings Project Renovation, varies up to $50MM
•Used the following estimating software: Excel Spreadsheet, Timberline, Heavy Bid (HCSS), On Screen Take-Off (OCS), Plan Swift, Digitizer and Micro Station
Biosphere International, Inc. From: 05/2005 To: 10/ 2006
Clearwater, Florida, United States
Cost Estimator / Project Engineer
•Performed Project Supervision/ Management on ongoing project.
•Estimate materials, labor & equipment US Government projects such as US Military Facilities, site works, pavement, roadways, drainage, utilities, hospitals, government buildings and other private companies both commercial and residential. The estimates were for architectural, structural (steel & concrete) and civil works. Prepare Change Orders based on RFI’s. Used Timberline Estimating software and digitizer.
•Used Excel Spreadsheet, Timberline and Digitizer in estimating works.
•Assist in scheduling project work activities using Primavera.
•Performed in Assisting Contract Administration & Preparation
US Cost, Inc. From: 04/2004 To: 05/ 2005
Atlanta, Georgia
Cost Estimator
•Estimate cost and materials for US Government projects such as Federal Buildings, Court Houses, site works, pavement, roadways, drainage, utilities, GSA, US Military Facilities, hospitals and other private companies. The estimates were for architectural, structural, and civil works. Used MS Success Estimating software and digitizer.
Faithful and Gould Pte, Ltd From: 07/1998 To: 03/ 2004
New Jersey, USA and Singapore, Singapore
Cost Engineer / Project Engineer
•Estimate the cost and materials for a Merck, Sharp & Dhome Pharmaceutical plant, Phase 1 = $400 Million & Phase 2 = $215 Million Dollars (start from site development of 20 acre property, sitework, earthwork & piling works, utilities, drainage, pavement, building const to finishes)
•Performed Project Supervision/ Management on ongoing project.
•Used Excel spreadsheet, Timberline Estimating software and digitizer.
•Assist in scheduling project work activities using Primavera
•Performed in Assisting Contract Administration & Preparation
McConnel Dowell From: 05/1996 To: 07/ 1998
Singapore, Singapore
Sr. Cost Estimator / Project Engineer
• Estimate the cost and materials for a Chevron Chemical and Oil Refinery Facility in Singapore
• Estimates the site development, road pavement, drainage, utilities, excavation work, site & piling works, building construction for 2 plants facilities, research and administration buildings structural and finishes, tanks, reservoir, piping and installation.
• Performed Project Supervision/ Management on ongoing project.
• Used Excel spreadsheet, Timberline Estimating software and digitizer.
• Assist in scheduling project work activities using Primavera
International employment
Worked for several well known engineering and construction companies in Manila, Philippine, Doha, Qatar, Singapore, and Malaysia in the capacity of Estimator, Quantity Surveyor/Civil Engineer, Site Engineer/Supervisor and Resident Engineer.
Additional Key Estimated and Construction Works Undertaken
-Harrisburg, PA and Los Angeles, CA Multi Storey Courthouses
-New Jersey Public Health, Environmental & Agricultural Lab
-Chevron Chemical Plant Complex, Singapore
-Chua Chu Kang Shopping Mall, Recreation & Cinema, Singapore
-Ras Lafan Power and Desalination Plant Project, Doha, Qatar
-Teluk Datai Hotel & Resort, Langkawi, Malaysia
-Clark Airbase Parallel Runway (now PDM International Airport), Clark, Pampanga, Philippines
-Gen. Santos Airport, Cotabato, Philippines
-Kalayaan Storage Power Plant Project - National Power Corp., Manila, Philippines
- National Power Corp. Site Development & Housing Project, Manila, Philippines
-Asian Development Bank General Headquarter Building– Manila, Philippines
-Century Tuna Canning Plant and Waste Treatment Facility, Manila, Philippines
Reference Will Be Provided Upon Request