LEONARDO ARAUJO ATAIDE
Rua Jorge Yunes *** / ***, Recreio, Rio de Janeiro / RJ – Brazil ZIP: 22.795-295
Ph: +55-21-960*-**** / +55-21-243*-**** - *************@*******.***
OBJECTIVE
Pipeline Engineer
PROFILE
Industrial Engineer graduated by CEFET-RJ with experience in Oil & Gas Industry business, marketing products and services for onshore and offshore applications in Brazil.
Knowledge in activities such as technical sales, engineering, planning, quality control and pre-commissioning.
Experience in logistic, sub-contracting and installation matters.
Personal qualities: HSE-focused, team spirit, results-oriented, ease communication, takes the initiative, responsible.
PROFESSIONAL ATTAINMENTS
Increased the sale participation of products to cleaning pipelines in Petrobras UO-BC and UO-RIO.
Won the first service contract to cleaning the pipeline with pigs and tracking for TDW.
Successful completion of pre-commissioning services within company and client standards in Brazil and South America.
Consistently met and exceeded the company profit targets during management of mid size projects.
Implementation of new technologies in the welding process and development of a new technique for the mechanical protection of automatically welded joints in subsea pipelines onboard the BGL-1 barge.
PROFESSIONAL BACKGROUND
Fundação Getulio Vargas – FGV/RJ – MBA in Project Management (2009)
Prominp - Management of Construction with emphasis on Commissioning and Conditioning. (2009)
Pontifícia Universidad Católica, Post Graduation: Telecomunication Systems, Rio de Janeiro (2001)
Federal Center of Technological Education (CEFET), Industrial Electrical Engineer, Rio de Janeiro (2000)
LANGUAGES
English: Fluent
Spanish: Intermediate
Portuguese: Native Language
TRAINING
Inline Inspection Sales Training – TDW Salt Lake City (UT)
Pigging Technology – TDW – Tulsa (OK)
Hot Tapping and Plugging – Tulsa (OK)
HUET - Helicopter Underwater Escape Training - SEAL
Oil and gas E&P – Coppe / UFRJ
BST – Basic Survival Training – Falck Nutec
Leadership for front line field supervisor – Halliburton
SAP system - Saipem
Concepts and Procedures for Hydrostatic Testing of on/offshore pipelines (IBP)
Leak Detection in Pipelines, Technologies, Performance and Specifications (IBP)
Risk management - Halliburton
MS Project 2002 – MASTER PROJECT TRAINING
Integrated Management Systems - ISO 9001:2008 - DNV
PROFESSIONAL EXPERIENCE
T.D. WILLIAMSON do Brasil
Recognized name in pipeline equipment and services, delivers safe integrity solutions for onshore and offshore applications. +1500 employees/ $ 500MM/yr revenue.
Sales Specialist Engineer - (Oct/2010)
Makes regular sales of products and services for pipeline integrity - pigging; rehabilitation products, pipeline services and Inline Inspection Service in customers (E&P, gas/liquid pipelines, refineries, gas processing complexes, petrochemical plants, engineering/consulting firms, contractors, industrial accounts, etc.) in Brazil, while operating within a specified budget.
Performs technical and commercial presentations.
Costs and prices preparations for elaborations of proposals for bids to Petrobras, Vale, Samarco, Braskem, among others.
Fulfilling the requirements of CFM 2005, analyzing the Terms and Conditionings of the contract and using the benchmarking of cost and price.
SAIPEM
A subsidiary of ENI group and a large, international and one of the best balanced turnkey contractors in the oil & gas industry.
Pre-Commissioning Engineer - (Apr/2009 to Oct/2010)
My role requires me to prepare detailed engineering procedures and selection of equipment required. Responsible for all safety and performance aspects of operational job. Ensures all job calculations and paperwork are completed correctly. Perform daily reporting and maintain communications with office during offshore campaign. To liaise with clients to ensure job is completed to customer requirements and satisfaction.
Project: EPIC URUGUA MEXILHAO OFFSHORE PROJECT
Description: Pipe lay 174 km of 16” gas pipeline from Mexilhão Platform to FPSO Cidade de Santos in Urugua field at 1.300 m water depth executed with the FDS vessel and fabrication and installation of PLET, PLEM, ESDV, 5 spools and 01 rigid vertical jumper.
Client: Petrobras 2009 / 2010 in Santos basin.
GLOBAL INDUSTRIES (Jul/2008 to Apr/2009)
Senior Project Engineer
Project: EPIC CAMARUPIM PROJECT
Description: Pipe lay 52 km of 24” gas pipeline from the cacimbas beach via HDD to PLEM at 80 m water depth executed with the derrick lay barge Iroquois.
Client: Petrobras 2008 in Espirito Santo basin.
Project: MEXILHAO PROJECT – SHALLOW WATER
Description: Pipe lay 22 km of 34” gas pipeline. Initiate with a beach pull to pipe lay at 20 m water depth executed with the derrick lay barge Iroquois.
Client: Petrobras 2008 in Espirito Santo basin.
HALLIBURTON,
One of the world's largest providers of products and services to the energy industry.
Technical Professional - Pipeline and Process Services - (Feb/2007 to Jun/2008)
Pre-commissioning engineer with experience in activities such engineering, planning and execution of testing, dewatering, conditioning and nitrogen services.
Project: HYBRID
Description: Flooding, Cleaning, Gauging and Testing in the Marlim Sul Oil and Gas Pipelines.
Client: Subsea7 do Brasil. 2008
Project: PLATAFORM PPER-1
Description: Flooding, Testing and Conditioning in the Peroa-Cangoa Gas Pipelines.
Client: Petrobras. 2008
Project: PDEG-B
Description: Flooding, Cleaning, Gauging, Testing, Dewatering, Conditioning in the Marlim Sul and Marlim Leste Oil and Gas Pipelines.
Client: Subsea7 do Brasil. 2007
Project: Golfinho Phase II
Description: Conditioning of Flexible Pipelines with Mono Ethilene Glycol in the Technip base in Vitoria.
Client: Petrobras, ES. 2007
CONDUTO
A benchmark in the construction and assembly of onshore and offshore pipelines.
Project Engineer - (2002 to 2007)
Project: Pre-commissioning of Transpetro Onshore Pipelines.
Description: Flooding, Cleaning, Gauging, Testing and Dewatering.
Client: TRANSPETRO
Project: Gas Pipeline Catu-Pilar
Description: Flooding, Cleaning, Gauging, Testing and Dewatering.
Client: NEDL – Construção de Dutos do Nordeste
Project: Flexible flowline in Peroá and Cangoá Fields - PPER-1 Platform
Description: Flooding and Testing
Client: PETROBRAS
Project: GASCAB III Gas Pipeline - Barra do Furado-Macaé (70 Km x 22”)
Description: Testing, Drying and Inerting
Client: PETROBRAS
Project: Gas Export Pipeline TARIJA – VILA MONTES - AECO
Description: Testing, Drying and Inerting of the Pipelines of the Margarita Field.
Client: REPSOL (Bolivia)
Project: TEBIG 42” Angra dos Reis Terminal (TEBIG)
Description: Pre-commissioning Services of Pipelines 01 and 03
Client: PETROBRAS
Project: Yacuiba Gas Pipeline - GASYRG
Description: Testing, Drying and Inerting Yacuiba – Rio Grande Pipeline (202 kmx32”)
Client: PETROBRAS - Bolivia
Project: Guanabara Bay Terminal (TABG) – Ilha d’agua
Description: Pre-commissioning of offshore pipelines
Client: PETROBRAS
ADDITIONAL INFORMATION
• Rio Pipeline – Rio de Janeiro / RJ – Exhibitor 2005 - 2007 - 2011
• Brasil Offshore – Macae / RJ – Exhibitor 2011
• Rio Oil & Gas – Rio de Janeiro / RJ – Exhibitor 2006
• Participation in events, workshops and meetings sponsored by Petrobras, Transpetro, FIRJAN, IBP, etc.
• International Seminar of Welding in Pipelines – LINCOLN ELECTRIC