ZURAIMI ISA
Correspondence Address:
P.O. Box *0, Al-Lith 21961,
Kingdom of Saudi Arabia
Permanent Address:
*-*-* ****** *** Apartment,
Jalan 7/4 Seksyen 7,
Selangor Malaysia
Contact No:
+966*********(Jeddah, KSA)
+966********* (Jeddah, KSA)
+601******** (Malaysia)
Email:
l84bu2@r.postjobfree.com
l84bu2@r.postjobfree.com
|CAREER OBJECTIVE |
to join a highly established organization and involved in highly
prestigious and iconic construction projects and achieve the highest level
possible.
PROFESSIONAL EXPERIENCE
V MECHANICAL ENGINEER WITH 16 YEARS EXPERIENCE IN PROJECT MANAGEMENT,
INSTALLATION OF MEP EQUIPMENT, OPERATION AND COMMISSIONING.
V Proficient in handling MEP installations, including maintenance of power
plant.
V Extensive experience in managing and coordinating various aspects of MEP
works.
V Ability to conduct engineering & techno-commercial evaluations as well as
interact effectively with Client and consultants.
V Possess effective communication and relationship management skills as
well as analytical, problem solving and organisational abilities
AREA OF EXPERTISE AND SIGNIFICANT ACHIEVEMENTS
. PROJECT PLANNING AND MONITORING
V Conducting feasibility studies and evaluating the viability of new
project, technical and participating in project review meetings
V Coordinates with estimating department manager in preparing the tender
schedule, coordinate with project manager in preparing the identifying
the major mile stones to be attained throughout the project.
V Participate in the kick off meeting with clients together with the
come up within agreed project schedule.
V Manage the planning activities throughout the tie span of the
specifications, BOQ and other documents from planning point.
V Planning engineering deliverables and or engineering register in
engineer.
V Monitor and record day of day activities report progress in systems
engineering.
V Making details procurement plan; closely coordinate with procurement
expiating and timely delivery of ordered items or equipments; between
the project procurement cycle and construction cycle.
V Summarize the 3 requirements i.e. materials, machineries and projects
(resource requirement). Prepare manpower histogram and
works executions.
V Planning construction projects including budgeting, scheduling,
project progress and cost.
V Ensuring cost control within budget and cash flow management; assuring
from planning side.
V Produce the revised and recovery schedules, generate accurate daily
project reports for Project management Level.
. Operational and Commissioning.
V Pre commissioning activity; preparing the checklist of acceptance and
punch list.
V Pressure part hydro test and pneumatic test. Conduct equipments
functions test and test run. Ensuring safety devices properly
function and reliable.
V Commissioning activity; Conduct interlock test and cables checking
from DCS and PLC. Ensure all the protections are reliable and safe.
V Boiler Initial firing, chemical cleaning, pressure part blowing out,
safety valves setting, load test, performance test and reliability
test
V Operational activity such as load change, equipment change over test
and combustion tuning.
V Evaluate equipment performance and analysis. Make recommendation for
upgrading and modification.
V Perform daily operation activity and shift monitoring.
V Preparing log book and daily activity reports to project management
team.
. Maintenance.
V Perform equipment periodic and preventive maintenance.
V Planning the service maintenance works, coordinating with supplier
and vendor for repairing and overhauling work.
V Prepare a corrective & preventive maintenance packages and lead a
maintenance team for work execution.
V Monitoring maintenance progress against schedule of subcontractor.
V Co-ordinating with design department and assisting in trouble
shooting of design problems as part of maintenances programs.
V Co-ordinating with clients for post commissioning maintenance works
and preparing inventory check lists for reliable operation and
maintenance of plant.
V Co-ordinating and supervise the boiler and related equipment as a
part of warranty inspection after handing over and report the
condition & reliability of plant.
Career Background
|Company |Position Held |Dates |
|National Prawn Company |Technical Support |Nov 2010 until present |
|Al Lith, Jeddah KSA |Manager | |
| | | |
Department : Fish Line of Business.
Nature of works: Reporting to Department General Manager.
. Prepared work task to subordinate, daily job planning and control
. Preparing the job order, material purchasing and budget.
. Handling the maintenance task, daily maintenance activities such as
pump overhaul, bearing replacement, water filtration activities and
control system.
. Liaise with supplier and contractor for new development and project.
. End of year budget preparation and Planning.
. Design review and modification.
. Evaluate employee 'Key Performance Index' to subordinate.
. Implement 5S to work area and environment.
|Company |Position Held |Dates |
|Septech- Simon Hartley |Chief Commissioning |Jul 2007-Oct 2010 |
|LLC |Engineer | |
|Dubai, United Arab | | |
|Emirates | | |
| | | |
Project Involve : Atlantis Hotel and Water Park, Palm Jumeira, Dubai.
: Saadiyat Island Golf Course, Abu Dhabi.
: Yas Island Marina. Abu Dhabi
: Jumeira Beach Hotel Marina,Dubai.
: Dubai Marina, Jebel Ali, Dubai
Nature of works: Reporting to Construction Manager.
. Handling of Mechanical room erection activity such as pump
installation, piping and instrument installation.
. Responsible for all mechanical and control system commissioning
activity
. Lead a commissioning team for commissioning and maintenance activity
. Prepare progress report and daily activity log
. Planning commissioning activity and overseeing a construction progress
. Preparing checklist and record for commissioning team
. Preparing Standard Operating Procedure for start up and operation
. System schedule maintenance and preventive maintenance activity
. Spare part inventories for pre and post commissioning activities
. In-charge of mechanical commissioning activity for water park such as
water filtration, foam fractionators, chemical injection system, sea
water intake station and desalination system.
|Company |Position Held |Dates |
|Ishikawajima-Harima |Senior Erection |April 2005-Jun 2007 |
|Heavy |Engineer / | |
|Industries |Operational & | |
| |Commissioning Engineer | |
|(IHI) Co. Ltd. | | |
Project name : Jebel Ali power Station-L. Phase 1.
Auxiliary Boiler Package P. ( 550 t/h x 2 ).
Client : Dubai Electricity and Water Authority.( DEWA)
Nature of works: Reporting to Site manager and Commissioning manager.
. Co-ordinating of boiler mechanical erection activity including job
progress and Quality assurance
. As a 2nd in charge of commissioning Group- Handled all the
commissioning activity.
. Lead a commissioning team for all fields commissioning activity.
. Responsible for all mechanical maintenance works for pre and post
commissioning period.
. Daily operational activity of Aux. Boiler
|Company |Position Held |Dates |
|Amsteel Mills Sdn Bhd |Senior Mechanical |Jan 2004 - Mar 2005 |
|Selangor, Malaysia |Executive | |
| | | |
Nature of works : Reporting to General manager and Director of work.
. Handling the mechanical maintenance work and assisting operation job
for CONTINUOS CASTING MACHINES Deparment.
. Maintain spare part inventory in order for operational reliability.
. Plant upgrade to increase production capacity and for preventive
maintenance.
. Lead a group of supervisors for job distribution and daily schedule.
. Preparing periodic maintenance schedule and job procedure.
. Preparing standard operating procedure for equipment maintenance
|Company |Position Held |Dates |
|Alstom Export Sdn Bhd |Operational & |Mar 2003 - Oct 2003 |
|Perak, Malaysia |Commissioning Engineer | |
Project Name : Manjung Power Station. ( 700 MW x 3 )
Client : Tenaga Nasional Berhad.
Nature of works: Reporting to Commissioning manager.
. Responsible for Balance of plant commissioning including HVAC system
and waste water treatment plant.
. Perform the pre and post commissioning maintenance works.
. Job includes erection and alignment of pumps and motors. Overhauling
of equipment and upgrading of systems.
. Coordinating with equipment supplier for plants upgrading works.
|Company |Position Held |Dates |
|Kaduna, Nigeria |Operational & |Sept 2001-Feb2003 |
| |Commissioning Engineer | |
.
Project Name : Kaduna Refinenary and Petroleum Company.
Boiler Rehabilitation Project. (120 th x 5)
Client : Total FinaElf (Nigeria) PLC.
Owner : Nigeria National Petroleum Company.
Nature of works: Reporting to Site Manager and Chief Commissioning
engineer.
. As a Deputy Chief commissioning engineer, job responsible for all
commissioning activity including erection and maintenance of
equipment.
. Pre Commissioning activity including equipment function test and test
run.
. Preparing site progress report and daily operational log.
. Monitoring commissioning work schedules and progress.
. Executed pre and post commissioning maintenance works.
. Co-ordinating site erection and maintenance work with customer and sub-
contractor.
|Company |Position Held |Dates |
|Ishikawajima-Harima |Operational & |May1998-Nov 2001 |
|Heavy |Commissioning Engineer | |
|Industries (IHI) Co. | | |
|Ltd | | |
Project name : SSAA Power Station. Phase 3. Kapar, Klang.
Auxiliary Boiler (500 MW x 2)
Client : Tenaga Nasional Berhad.
Nature of work : Reporting to Commissioning manager.
. Assisting commissioning engineer in pre commissioning and
commissioning work.
. Assisting commissioning Engineer in pre/post commissioning maintenance
works.
. Boiler operation and supplying steam to steam turbine activity.
. Maintain daily log report to commissioning engineer
Academic Background
. Diploma in Mechanical Engineering from Mara University of Technology,
Malaysia (UiTM)
. Certificate in Radiation Protection from Malaysia Institute of Nuclear
Technology. (MINT).
Specific Knowledge & Skills
. Computer literacy in Excel Spreadsheet, Power Point, Word
Processing;
. Possess Good Communications and Interpersonal Skills;
. Possess Malaysia, UAE and KSA Driving Licensed & International
License.
. Possess strong leadership and strong public relation skills;
. Able to communicate at all levels.
Other Information
. Willing to travels and relocated.
. Hard working and able to work in long working hours.
Personal Details
Name as in passport: Zuraimi Bin Isa
Passport Number : A15732841.
Age : 36 years
Marital Status : Married and blessed with two daughters.
Date of Birth : 13th April 1975
Language Spoken : English & Malay.
Written : English &Malay.
Hobbies : Mountain Climbing, Scuba Diving, Kayaking and
Reading
Compensation & Package
Current Salary : SR 15,000++
Expected Salary : Will provided upon request.
Visa status : Resident Visa
Availability Date : Immediately
Present Location: Jeddah, Saudi Arabia
References
|Ariffin Mamat |Human Resources | |
| |Director | |
| |National Prawn Company | |
| |(NPC), Al Lith Jeddah | |
| |KSA | |
| |+966********* | |
| | | |
S. Fukushima Project Director
Ishikawajima-Harima Heavy Industries
Tokyo Engineering Center, Japan.
+813****-****.[pic][pic]