Post Job Free
Sign in

Project Manager & Construction Superintendent

Location:
Las Vegas, NV, 89044
Posted:
June 10, 2012

Contact this candidate

Resume:

**** ******** ******, *********, ** *****702-***-****• ********.******@*****.***

Richard T Harris

Very detailed, well organized, reliable and results driven Construction Professional who is looking to join your team where I am committed to adding value, providing superior customer service and building on client relationships while exceeding the customer’s expectations.

PROFESSIONAL EXPERIENCE

2007-2009, March 2010- Present J. T. Builders, Inc. Las Vegas, NV

Commercial Project Manager & Estimator

Responsible for managing the daily operations that consist of estimating and completing take offs with On-Screen Take Off software, submitting bid proposals on the supply and installation of high end casework for the majority of all major casinos, retail shops and hospitals in Las Vegas, NV. Responsible for generating scopes of work, reviewing shop drawings in regards to plan specifications, reviewing, creating and approving construction schedules, pre-construction planning to final close-out, coordinating the delivery times and dates of materials and attending all the subcontractor weekly meetings to review safety, schedules and any project delays.

Create and process change orders for every job I oversee as the Project Manager. Submit all AIA monthly billings to make sure they are processed accurately and on time per the billing deadlines of each job. Also, I have been able to continuously ensure job profitability measures are being met on all jobs by tracking job costs and by reviewing man hours daily and weekly compared to what was allotted for each job per the scope of the work and by working closely with the foreman on each job to make sure any extra work outside the scope of work is approved prior to commencement.

Responsible for completing job walks with the on-site foreman and general contractors on a weekly basis to ensure all safety, quality control, site cleanliness, trade damage and any scheduling issues or potential delays are being communicated and documented to the appropriate personnel.

2004 to 2007 Pulte Homes/Del Webb Communities Las Vegas, NV

Construction Superintendent

Consistently managed over 30 homes at all times while constantly striving to improve quality, shorten build-cycle times, minimizing overhead, purchase orders and exceeding the customer’s expectations. In the 4 years I worked as a Superintendent I managed over 400 homes from start to finish which generated the company around $120 million in total revenue while I was still able to maintain around a 97% customer satisfaction rating with our homeowners that was conducted by J.D Power and Associates where I was recognized as being one of the top superintendents in the company several times.

Some of my responsibilities consisted of overseeing all daily field operations like scheduling, quality control, energy efficiency/building methods, coordinating subcontractors, verifying all options were installed correctly per the plans, job-site cleanliness, facilitating weekly progress and safety meetings, ensuring all required inspections were passed and documented while also mentoring and training new hires on company policies, procedures and best practices.

Also had the responsibility to manage the construction of two newly designed multi-family model homes which were both completed in roughly 35 working days from start to finish. I was also responsible for reducing the build cycle on this product by 15 working days per home at the start of the production which became one of the strictest build schedules in our division that ensured a greater profitability for each home that was built in this community.

2003 to 2004 Pulte Homes/Del Webb Communities Las Vegas, NV

Customer Service Manager

Completed quality assurance inspections, generated punch lists and followed up to make sure all repairs were completed before the initial homeowner walk through on their home. I also facilitated the homeowner walk-through/orientations and scheduled 30 day, 3 month and eleven month inspections with the homeowners to ensure the highest customer satisfaction and experience with their new home. I was also able to maintain around 97% customer satisfaction rating conducted by J.D Power & Associates with new homeowners where the company was ranked #1 several years in a row for the highest in customer satisfaction for new home builders.

Scheduled and coordinated subcontractors to complete all warranty items to the highest quality of standards, cleanliness and professionalism while maintaining constant communication and interaction with the homeowners.

1999 to 2001 Advantage Building & Design Payson, UT

Framer

Framed single family and custom homes that had an estimated value of $500,000 or more along with several commercial buildings that were in excess of $5 million.

Typical job duties included stair layouts, installing floor joists, sheathing subfloors and roofs, roof and truss layouts, installing overbuilds, wood & vinyl siding.

Also responsible for managing all tools, equipment, picking up daily supplies & materials that were put on to the company account that showed how responsible, reliable and trustworthy I was as an employee.

1994 to 1999 D.C. H. Construction Delta, UT

Laborer/Concrete Finisher

Setup footing and foundation forms for residential, industrial and commercial projects with symon concrete forms. Formed and finished concrete work for sidewalks, basement floors, suspended slabs, parking lots and foundation walls.

Was an all around laborer that included job site cleanliness, operated some light equipment like a hilti drill, chop-saws and power trowels. I also operated some heavy equipment periodically.

Also responsible for transporting equipment and construction trailers to and from jobs once they were completed. Ability to work on my own with little or no supervision needed due to being very self-motivated, safety conscious and a reliable employee throughout my years of employment.

Education

Southern Utah University Cedar City, UT

B.S., Building Construction Management

Team Member of the NAHB Collegiate Competition

Utah Valley University Orem, UT

Associate, Building Construction Management

Passed the Construction Business and Law Examination

Certifications & Qualifications

• Pursuing L.E.E.D AP BD+C Certification

• ACI Concrete Field Testing Technician Grade I Certified

• O.S.H.A 30 hour Certification

• Recent On Screen Take Off Estimating Software Experience

• AIA G-702 & G-703 Monthly Billing Software

• Proficient in Microsoft Word, Excel & Outlook



Contact this candidate