JERRY W. COLEMAN
Shreveport, Louisiana 71118
Cell 318-***-****
Home ***- ***-****
SUMMARY OF QUALIFICATIONS:
Over 30 combined years experience in the Drilling industry as Drilling Supervisor and Consultant for companies such as PDO, Repsol Petroleum .Experience in well planning and production. Dedicated to completing each job with an emphasis on safety and quality. Possesses strong instructional and motivational skills to enhance Co-workers performance.
Experienced in Drilling, H2S, HTHP, HSE, Well Control, down hole problems, production, and completions.
Extensive experience in:
Conventional, Directional, Horizontal, H2S / CO2, Sidetrack, Rotating Head.
Completions / Workovers, Coiled Tubing, Well Stimulation, Fracture, Cementing, Gravel Packing, Well Testing / Flow Back, Fishing Techniques, Fishing Tools, P&A Plug and Abandon.
Bottom Hole Pressure Analysis, MWD/LWD/PWD.
International assignments: Oman, Algeria, India
Domestic: Louisiana, Arkansas,Mississippi,Oklahoma,Texas.
Computer skills: Master View, Well View, Rig View, Tadpro
Languages: English
EXPERIENCE:
BOOTS & COOTS IWC, HOUSTON TX. 1/2007-7/2010
v Repsol Algeria 3 years
Drilling Supervisor
Drilling Supervisor in remote locations, on HTHP and H2S wells as consultant to PDO , Repsol.
Down hole problems , drilling, completions, and production.
Visually inspect all company property and leased equipment before utilization. Anticipate future operations and obtain the require resources in a timely manner. Maintain communication with the Rig, Office, and Service personnel. Complete all required reports promptly.
Rig type,1800 HP Diesel Elect Well type, Gas TVD 8,753’, MD 9,548’, 650psi, MW 10.2ppg.
v PDO Algeria 18 months
Drilling Supervisor
Rig type 1800 HP, Well type Gas, TVD 19,653’, 1100 psi, Oil Base Mud MW 14.5ppg.
v PDO Algeria 1 year
Drilling Superintendent
Rig type1800 HP, Well type Gas, TVD 8033’, MD 8243’, HTHP Temp 230, 1500psi BHP, Oil Base Mud MW 12.2ppg.
v PDO Algeria
Drilling Supervisor
Rig type 2000 HP, Well type Gas, TVD 18,556’, 750psi. OIL Base Mud MW11.2ppg.
DALMA ENERGY, MUSCAT,OMAN 2004-2008
v Repsol 3 years
Drilling Superintendent
Rig type 1500 & 3000 HP, Well type Gas, TVD 10,841’, MD’s11,418’.
NABORS DRILLING, OMAN 2001-2004
Drilling Superintendent/ Rig Manager 3 years
750Hp Diesel Elect double drilling to 9750 oil wells
Duties were to maintain high standards of safety, oversee all aspect of drilling operations, plan maintenance of all equipment, and manage operating budgets for all operations.
Responsible for well planning, down hole problems, drilling programs, P&L, bottom hole assembly (BHA). Ensure that the work progress is in accordance with the management program.
Visually inspect all company property and leased equipment before utilization.
Anticipate future operations and obtain the require resources in a timely manner.
Maintain communication with the Rig, Office, and Service personnel. Complete all required reports promptly. Observe operations critical to the success of the well:
POOL WELL SERVICE, LONGVIEW , TX. 1995-2001
Drilling Superintendent 7 years
Oversaw five rigs in east Texas, Louisiana. Asia.
Responsible for well planning, down hole problems, drilling programs, and work with contractor to overcome any problems.
Anticipate future operations, and obtain the require resources in a timely manner.
Maintain communication with the Rig, Office, and Service personnel.
Complete all required reports promptly.
GULF COAST DRILLING, LAFAYETTE, LA. 1990-1995
Rig Manager 5 years
Oversee all aspect pertaining to the day-to-day drilling operations of offshore and land rigs.
Consult with Production Company on rig operation, safety programs, and training matters to ensure effective operations. .
Maintain communication with the Rig, Office, and Service personnel.
C&C PRODUCTION CO, HOUMA , LA. 1983-1990
Operations Manager 7 years
Responsible for operations, reports pertaining to completion and production of well sites on and offshore Gulf of Mexico.
Responsible for P&L and well planning, down hole problems, drilling programs, bottom hole assembly (BHA), and insure safe working practices .
Ensure that the work progress is in accordance with the drilling program. Inspect all company property and leased equipment before utilization. Anticipate future operations and obtain the require resources in a timely manner. Maintain communication with the Office, Rigs and Service personnel. Complete all required reports promptly.
Consult with Production Company on rig operation, safety programs, and training matters to ensure effective operations.
Maintain communication with the Rig, Office, and Service personnel.
H&H WELL SERVICE, HOUMA , LA. 1981-1983
Drilling Superintendent 3 years
Oversee all aspects for field operations, oversee the day to day Operation of Field Office, all field personnel, Order and maintain all field equipment. Maintain all field reports. Responsible for safe working practices and make sure that they are utilized properly. Ensure that the work progress is in accordance with the management program. Visually inspect all company property and leased equipment before utilization. Anticipate future operations and obtain the require resources in a timely manner. Maintain communication with the Rig, Office, and Service personnel. Complete all required reports promptly. Observe operations critical to the success of the well.
Maintain communication with the Rig, Office, and Service personnel.
S&C PRODUCTION & COMPLETION CO, MORGAN CITY, LA. 1977-1981
Field Supervisor 4 years
Oversee and report all well aspect’s of drilling & completion, maintain well cost, plan and order tools and equip. Maintain, and record each phase of the project.
Responsible for safe working practices. Ensure that the work progress is in accordance with the management program.
Visually inspect all company property and leased equipment before utilization. Anticipate future operations and obtain the require resources in a timely manner.
Maintain communication with the Rig, Office, and Service personnel. Complete all required reports promptly. Observe operations Critical to the success of the well.
BUTLER AND JOHNSON DRILLING CO. 4 YEARS 1973-1977
Floors, Derrick, Driller, Toolpusher
EDUCATION:
Thibodaux High School
TRAINING / CERTIFICATES:
2012 Well Control IADC School
Lock-out Tag-out Procedures
Offshore Survival
Personal Protective Equipment
Incident Investigation
Job Safety Analysis
Safety Leadership
Safety Management
Quality check drilling proposals
Drilling contracts tendering
Monitoring contract performance
Plan and put in place contingencies and solutions for expected drilling problems
Authorization for expenditure
End of well report and analysis
Analysis of supporting services performance
Daily drilling reports
Look into new technology and methods that could benefit the company
HTHP Training Course
Firefighting
HSE