James P. Evans 253-***-****)
Day or evening
kx2xfw@r.postjobfree.com
Senior Mechanical Design Engineer / Project Manager.
Sr. Construction Estimator / Project Manager
Design / Energy consultant / Mgr.
Construction Project Manager
Education
BS Mechanical Engineering, 1975, California Western University, CA
Memberships and Affiliations
American Society for Heating, Refrigeration & Air Conditioning Engineers, ASHRAE
American Society for Mechanical Engineers, ASME
PROFESSIONAL EXPERIENCE- HIGHLIGHTS
• Proficiency with AutoCad 2000
• Extensive knowledge of co-generation and renewable energy systems
• Extensive knowledge relative to energy efficiency of central plant equipment types and installations.
• Extensive knowledge of piping design.
• Extensive knowledge of building load calculations
• Extensive knowledge of LEED applications
• Extensive usage and knowledge of building load calculation programs such as HAP (carrier) and Trace 700.
INTRODUCTION & SUMMARY
I have over 30 years experience as a mechanical engineer. I have served as Project Manager, for plan /spec design projects, (HVAC, piping & plumbing)
My construction expertise includes roles as Sr. Cost Estimator, Construction Manager, , and resident engineer on various projects.
I have extensive expertise in design and construction administration of a variety of mechanical systems for air distribution, (HVAC) hydronic heating and cooling, the layout and design of central plants, large industrial pump systems, waste treatment plants, refrigeration equipment, plumbing, and fire protection including equipment and system application (s).
Specifically, I have expertise in design of HVAC systems relative to hospitals & health care facilities, laboratories, commercial, government, and marine applications, schools, power plants, hydroelectric & cogeneration plants, industrial & commercial buildings, high rise buildings, pharmaceutical, refineries, co-generation systems, office buildings as well as commercial institutions such as high rise / mixed use buildings, large grocery stores, warehouse conversions and telecommunication facilities (i.e.; plumbing, piping and related specifications, etc.), and many others.
My field project management construction experience includes high rise, mixed use facilities, industrial facilities as well as commercial and specialty applications such as data centers, hospitals, laboratories, and large civil projects including airports, pipelines and projects involving excavation, concrete construction and structural steel.
Activities included but not limited to, development of CPM schedules, cost estimates including line item costs for sub-contractors, long lead equipment identification and preparation of purchase orders.
OTHER INFORMATION
I have mentored engineers in my last 5 positions and have enjoyed that experience and looking forward to continuing.
I have taught classes for HVAC design, plumbing and estimating to insurance adjusters, and hosted presentations for the PLRB organization for insurance adjusters at the Westin Hotels located in Rhode Island, Chicago and Austin, Texas.
This was necessary for the insurance adjusters yearly license renewal requirements. T
The classes gave the insurance adjusters and attorneys the edge and information they needed to identify problems in claims, and knowledge gained to present information to the various experts as required.
Proficient in marketing, presentations to prospective clients.
WORK EXPERIENCE
______________________________________________________________________
From: November 2007 to 2011
(Note: Layoff occurred in October of 2011- Still working for CASE but on an as needed or part time basis.
Case Forensics Corp
Mountlake Terrace, WA.
Sr. Mechanical Engineer / Project Manager
My main duties would include review of contract documents, field examination of HVAC, piping, plumbing and other mechanical systems in light of construction defects or engineering design flaws that would cause either injury to personnel or mal-functions of the system, and to include damage to the building.
Writing of reports to indicate causes, develop conditions of findings and to conclude expert opinions.
Main clients were insurance companies and law firms.
Preparation of cost estimates for recommended changes
Hultz/ Cross Engineers
Tacoma, WA.
From about June of 2007 to November of 2007
Sr. Mechanical Engineer
Project Manager
In working with architects I designed systems for municipal projects, schools & local government. The designs would include HVAC, and related hydronic systems, including plumbing design. Other designs would include steam systems and other specialties related to industrial applications. Preparation of cost estimates for architects used for construction purposes.
Other duties would include preparation of load calculations using Carrier HAP® or Trane Trace® and the preparation of cost estimates.
Air Systems, Inc.
3602 So. Pine St.
Tacoma, WA. 98409
From about December of 2006 to June of 2007
Pos: Project Manager /Engineer
Design of all mechanical systems for high rise mixed use building to include 4-pipe fan coils for hotel rooms, air to air heat pumps for condominiums, and small packaged systems for retail areas and pre-function areas of hotel.
I also performed High school HVAC system design to include separate zoning for classrooms and separate package systems for gymnasium. All work included plumbing design performed by me.
Preparation of cost estimates for architect.
I completed a mechanical system design for a large hotel to include HVAC and the related hydronic system including pumps, piping and related instrumentation. Also, design of the chilled water variable primary and the heating water system included boilers with primary secondary piping distribution.
Other projects including a police station HVAC design. Performed related building load calculations. The design included zone terminal boxes, and plumbing design.
PSF Mechanical
Seattle, WA.
From about September of 2006 to January of 2007
Position: Sr. Mechanical Engineer
Responsible for the mechanical design of a mixed use building including hotel portion, high end condominiums, retail center and underground parking garage.
Work consisted of performing building load calculations, selecting and sizing all chiller equipment, boilers, pumps, valves, air handlers, etc. Design of central plant for the building, design of split air handlers for condominiums, design all piping systems including chilled water, heating water and condensate drains.
HVAC system for Nintendo. Involved reviewing the existing system for add on due to zone expansion.
Laboratory air exhaust system, including designing of air flows, and piping system design.
Various other similar project including HVAC design for Virginia Mason clinics.
Keen Engineering (Presently Stantec)
1932 1st Ave.
Seattle, Wa.
98101
Pos: Sr. Mechanical Engineer / Project Manager
From about December of 2004 to August of 2006 – Due to Layoff.
I was the Project Manager for a large collision repair center located in Bellingham. I worked with an architect out of Mt. Vernon for this project.
The project consisted of an extensive exhaust system for welding stations, an air scrubber application, HVAC, MUA ( make up air) units for heat & recovery, piping hydronics, for heating water with major components in the mechanical room, and plumbing design.
Office DX cooling system with baseboard fin tube hydronic hot water heating system.
LEED project.
I was the Project Manager for the Western Washington University design of a vivarian lab. The work included (2) two five story buildings, HVAC, Strobic Air exhaust system with run-around loop heat recovery, application of Phoenix valves for supply and return including ultrasonic humidity system, piping for hydronics, plumbing, and central plant design, i.e., chillers, cooling towers, and on-site steam systems.
Special application of steam/cage washing system.
Special heat exchanger heat recovery system for hydronic hot water and domestic water feed systems. Perform cost estimating for equipment purchases and general construction including time lines (CPM scheduling)
The building required a combination of natural ventilation in the West building along with under floor mechanical cooling in the lecture hall.
I was in charge of other smaller projects.
McGowan Broz Engineers, Inc.
15405 37th Ave.
Suite 200
Bellevue, Wa. 98006
From about February of 2002 to December of 2004
Sr. Mechanical Engineer / Project Manager
Manage all MEP requirements for tenant improvement projects at SeaTac airport. Applied knowledge of airport POS (Port of Seattle) standards as required to the various projects. Interface with the Facilities and Infrastructure groups (F& I).
Interface with various Architects for the TI (Tenant improvement) facilities. TI’s consisted of design for Type 1 hood applications, HVAC, plumbing, electrical, and hydronic systems.
I performed the HVAC design & supervised plumbing for Terminal 30 Princess Line baggage claim building for the Port of Seattle.
HVAC & plumbing design for $5M high end home in Woodinville, using a 7 zone multizone air handler, design of all ductwork, radiant floor heating, boiler applications, and humidifier systems.
Flack & Kurtz
1417 4th Ave. Ste. 200
Seattle, Wa.
From about late December of 2001 to February of 2002- I left because of a slow-down in work and to avoid layoff.
Sr. Mechanical Engineer / Project Manager
For this international company but small local MEP office – Manage TI projects in high rise office buildings ( 4th & Madison high rise building for Preston, Gates, & Ellis) involving fan-powered terminal box placement, duct design, CRAC unit placement and water system connections. (11 floors at 25,000 sq. ft. / floor) Prepare bid package.
Similar work in same building for 4 floors, for Deloitte- Touche Accountants.
Convention Center-Yakima – Addition to existing building. New 110 ton rooftop air handler, zone terminal boxes for meeting rooms and offices.
Run Trace Load Calculations, specified equipment i.e., HVAC, plumbing, interface with electrical, structural, etc. Prepare bid package
Glumac International, Inc.
1324 4th Ave.
Ste. 1300
Seattle, Wa.
From March of 1998 to December of2001
Pos: Project Manager & Lead Mechanical Design Engineer
HVAC system design, duct design, central plant layout incl. HW & CHW hydronic system design. Operating cost analysis for chillers & boilers, & system design for various projects in Seattle area.
Port of Seattle – Seatac Airport – Various projects involving HVAC, plumbing and electrical coordination. Interface with airport personnel and architects.
Multicare Hospital – Auburn: HVAC design for operating room, including special drain systems in the OR.
University of Washington (UW) I.V. laboratory, HVAC system design. Ductwork, placement of 2 speed chemical hoods, exhaust system design. I performed the design of a plumbing drain system and fixture application.
Prepare CSI division 15 specifications.
U.S. Courthouse – System study for re-furbish and tenant usage. Ugrade of air handling system, main mechanical room and various floor tenant improvement requirements. – Architect – Merritt – Pardini.
High rise condominium and hotel. HVAC, mechanical room layout, load calcs using Trace software, penthouse design systems, boilers, primary and secondary hydronic chilled water and Hot water systems, steam systems, . Electrical system coordination.
Other: Various system developments ( HVAC) and heat/cooling load determination via trace load calcs, for various mechanical contractors.
Westin Hotel – Detroit – Design of central plant, kitchen systems, hotel room AC units & riser design, Plumbing, piping, HVAC, load calcs, etc.
WASHINGTON STATE HOSPITAL – HVAC – duct design, air handler placement, existing chiller and boiler plant expansion.
MCI Worldcom – Perform building load calcs, and state energy calculations for building loads for permit. Application of CRAC units in switching area (Telecommunications) chilled water piping, and distribution, pump sizing system sizing, including air handler application HVAC and building envelope system applic. Plus the equipment heat load (100 watt/sq. ft.) etc.
Halvorsen, Beach & Bower
North Seattle, Wa.
& The Austin Company
From about February of 1996 to March of 1998
Sr. Mechanical Engineer / Project Manager
City of Olympia – Courthouse – mechanical system upgrade, and re-zone analysis (court room) & application of new mechanical systems, i.e., new rooftop air-handlers, fan coils, & fan powered terminal box, zone applications.
HVAC System for offices and warehouse / storage area including chilled water system design including special air handling system, compressed air, pumping system and design of mechanical room operation, DDC system, etc. Architect Interface and other disciplines, for offices and warehouse for the Washington State Liquor Control Board.
King County Pump Station – Developed “DD’s”, (design development) drawings, and on to construction documents , including pumping requirements, HVAC, application of air handlers, duct design / exhaust system, odor control plumbing & drainage.
Gordon Hauch- Elementry School – System upgrade, HVAC, & Plumbing.
Working with Architects – Huttebal & Oremus – Kirkland
THE AUSTIN COMPANY – Renton, WA.
Sr. Mechanical Engineer / Project Manager
From about July of 1993 to February of 1996
COMMMERCIAL AIRPLANE GROUP, RENTON, WASHINGTON
HVAC for industrial & commercial applications including equipment
application, i.e. chillers, pumps, fans, system design, piping,
Special systems for HVAC, i.e. clean rooms, exhaust, including
Special material for piping systems.
BOEING COMPUTER SERVICES – BELLEVUE
Design and construction management of heat exhaust and mechanical cooling system for switchgear and UPS system heat emission. Applied DX coil arrangement for cooling, including roof top unit, and system arrangement, necessary to avoid water above the switchgear and UPS systems.
BOEING COMMERCIAL AIRPLANE DIVISION- EVERETT
Note: I worked at this Boeing facility on contract for the Roh, Inc. company from 1988 to 1993. Then went to work for the Austin Company who at the time had various Boeing contracts including the 800,000 sq. ft. sheet metal building south King County where I designed many small projects including HVAC and steam applications. Supervisor was Ivan Ittner who is now retired.
Project Manager – mechanical portion, for the addition of 440,000 sq. ft. of office space for the 747 xs & 777 program involving application of air handlers for the HVAC requirement, chilled water
piping, & development of the required P & ID’s, (Process & Instrumentation Diagram)
Evaluation and the correction of the chilled water piping network throughout the plant and the addition of 1 1,000 ton (.48 kw/ton) Trane centrifugal chiller for the additional heat load (s). located in the chiller plant, bldg. 60.
Bldg. 30, & 32, - Chemical exhaust system design for fume evacuation including mechanically abating heat from existing equipment to atmosphere, and chemical exhaust to wet scrubber using potassium permanganate as caustic scrubbing agent.
OTHER PROJECTS WHERE I WAS PROJECT MANAGER OR LEAD ENGINEER
Supplement to resume available on request.
From 1986 to 1988
MECHANICAL DESIGN ENGINEER & PROJECT MANAGER - For JPL (Jet
Propulsion Laboratory) , Pasadena, Calif., clean room design and
constuction management, including HVAC, piping, pumps, etc.
Frederiksen Engineering – Long Beach, California
From 1981 to 1986
POINT LOMA, CALIF. WASTE TREATMENT PLANT – System design for odor scrubbers and towers. Outfall sewer design, primary and secondary treatment.
HYPERION WASTE TREATMENT FACILITY – Public Works, _ Co-generation system using Carver-Greenfield system. Steam generation, 40 MW.
PERG – Co-generation – turning Methane gas into 100MW, using field erected boilers, (Zurn), to 382,000 lbs/hr steam to 13 stage, turbine generator set (Fuji)
LAX – City of Los Angeles, Public Works Dept. - 8 MW – Co-generation system using natural gas to two KB5 Allison engines to gearbox and generator (2) two at 4MW ea. Made 40,000 lbs/hr steam to drive 5400 ton turbine chillers for chilled water system.
Clairmont countryclub – Heat olympic size pool with hot water generated from emergency generator sets – off hours – using thermal storage- chilled water using Yazaki system.
S & T Western Consulting Engineers
From 1974 to 1981
PROJECT MANAGER- Los Angeles Unified School District- Supervised all
design and construction for 17 school renovation and new construction
projects. Value: $28, 000,000. Architect-Engineering firm
interface..
PROJECT MANAGER-Hyperion Waste Treatment facility- Design /Construction of the
Carver - Greenfield co-generation system. Included sludge drying facility to powder and usage with Carver Greenfield to Crystallizer – Boiler & steam to turbines.
My own design-build firm
J.P. Evans Engineering & Construction Co.
10835 Magnolia Blvd
North Hollywood, California
Start 1965 to 1973 after going out of business. (details available) Went out of business in 1973 – performed various Refinery Projects, i.e. , Union Oil. Co., Chevron Oil Co., Powerine Oil Co., & others.
This work included contracts with various refinery projects to include piping design, pump applications and oil storage facilities and special exhaust and HVAC systems.
Also my company performed design-build contracts for various project for the city of Glendale.
By business started with only myself and at the time I went out of business I had 17 employees which included 3 engineers, 2 draftsmen, 1 project engineer, 1 project manager and 1 superintendent, various office workers and 2 field personnel. This number did not include union craftsmen. I also owned equipment and trucks.
I held a California State Engineering contractor’s license - Class A.