Resume
Email id:***********@*****.*** Kang Ching Road,
Mobile No: 006*-******** Singapore 619064
PROFESSIONAL QUALIFICATION : API 653 Tank Inspector
-Cert No: 42575
CSWIP-Welding Inspector in TWI
-Cert No: 39771
CSWIP- Tank Bottom Inspector (MFL)
- Cert No: TBEC/KL/10/007
AWS-CWI in American welding Society.
- Cert No: 08062391
SNTC-1A, LEVEL-II
Ultrasonic Thickness Gauging
Liquid Penetrant Testing
Magnetic Particle Testing
Radiographic Interpretation
EDUCATION AND QUALIFICATION : Higher Secondary, In Boiler Plant Higher
Secondary School, Trichy, India.
Attended B.Sc Degree Course in Mathimatics.
KEY EXPERIENCE:
Welding inspection,Tank Inspection, NDT Inspection like MT,PT,UTG and MFL Scanning, witnessing PWHT, pressure test, coating inspection, internal inspection of pressure vessels, piping, tanks, structural, painting, coating, Wrapping & insulation for petrochemicals, refineries.
Employment History:
From 18 May 09 to Till Date
SGS TESTING & CONTROL SERVICE SINGAPORE PTE LTD
Engineering Inspector
Work Responsibilities/Job duties
• Inspection of Above ground storage tanks of its integrity
• Hands on experience with Silverwing’s MFL Machine and Sokia’s Total Station for inspection of Storage Tanks,
• Doing MOM inspection for Stream pipe lines.
• Material verification according to the certificates,
• Visual inspection for the welds
• Dimensional check of the structure and the tank,
• EMI inspection for drill pipes and drilling equipments.
• Witnessing for WPS/PQR, Welder Qualification
• Radiographic Interpretation
• To witness NDT inspections
• To witness PWHT after NDT inspection
• Final documentation for the clients review
Major Projects involved:
● Worked as a TPI in Single Parallel Train Project for Shaw Stone & Webster, Platong Gas Project Indonesia for McDermott,
● Worked as an Inspector in Tank inspection for Oil Tanking, Shell Eastern Singapore Pte Ltd & Fuji Oil, Senoko energy Pte Ltd and Singapore Refinery Corporation.
From 3rd Nov to 14 May 09
MUN SIONG ENGINEERING PTE LTD,SINGAPORE.
Quality Control Supervisor
Work Responsibilities/Job duties
• Material verification according to the certificates,
• Visual inspection for the welds
• Dimensional check of the structure and the tank,
• Check suitability of WPS/PQR, Welder Qualification, and Welding consumables
• To arrange for NDT inspection
• Radiographic Interpretation
• To witness NDT inspections
• To witness PWHT after NDT inspection
• Final documentation for the clients review
Projects Involved: ECC Projects for Joint Venture & Toyo ABB
15th Apr 2007 –Oct 2008
QATAR ENGINEERING AND CONSTRUCTION CO W.L.L,
DOHA-QATAR
Quality Control Inspector
Work Responsibilities/Job duties
• Material verification according to the certificates,
• Visual inspection for the welds
• Dimensional check of the structure and the tank,
• Check suitability of WPS/PQR, Welder Qualification, and Welding consumables
• To arrange for NDT inspection
• Radiographic Interpretation
• To witness NDT inspections
• To witness PWHT after NDT inspection
• Final documentation for the clients review
Projects Involved: Doing a shut down job in Dolphin Energy, Expansion of Common Low Sulphur Condensate Storage Tank.
8th Dec 2006 – 29th Mar 2007
Poly NDT Services Pte Ltd, SINGAPORE
Quality Control Inspector
Work Responsibilities/Job duties
• Material verification according to the certificates,
• Visual inspection for the welds
• Dimensional check of the structure and the tank,
• Check suitability of WPS/PQR, Welder Qualification, and Welding consumables
• To arrange for NDT inspection
• Radiographic Interpretation
• To witness NDT inspections
• To witness PWHT after NDT inspection
• Final documentation for the clients review
8th Dec 2004 – 29th Nov 2006
B.T. Engineering PTE. LTD, SINGAPORE
Quality Control Inspector
Work Responsibilities/Job duties
• Material verification according to the certificates,
• Visual inspection for the welds
• Dimensional check of the structure and the tank,
• Check suitability of WPS/PQR, Welder Qualification, and Welding consumables
• To arrange for NDT inspection
• Radiographic Interpretation
• To witness NDT inspections
• To witness PWHT after NDT inspection
• Final documentation for the clients review
.
Projects Worked:
• Metering Skids for Natco, Japan.
• Process Module for SBM, BLUE WATER FPSO projects.
• Dehydration Package for PETROCO, Singapore.
• Done a Shutdown job For DUPONT SINGAPORE in Jurong Island. Re-construction of Gas storage tanks.
• Worked as QA/QC Inspector individually For 6 months to complete the project in EAGLE 2 Ship for SBM.
8th Dec 2003 – 25th Nov 2004
B.T. Engineering PTE. LTD, SINGAPORE
Production Supervisor
• Material verification according to the certificates
• Review the engineering drawing and prepare cutting plans
• Co ordinate with the workers to fabricate structure and piping as per the drawing and allow allowances
• To check the fitups of pipes and structures for welding
• To arrange worker for welding after check up
• To arrange inspection before welding to check the weld joints and again after the welding
• Projects Worked:
• Metering Skids for Natco, Japan.
• Process Module for SBM, BLUE WATER FPSO projects.
• Dehydration Package for PETROCO, Singapore.
• Done a Shutdown job For DUPONT SINGAPORE in Jurong Island. Re-construction of Gas storage tanks.
July 3rd, 2002 – 6th Nov 2003
SBL ENGINEERING PTE. LTD, SINGAPORE
Charge Hand
• Review the engineering drawing and prepare cutting plans
• Co ordinate with the workers to fabricate structure and piping as per the drawing and allow allowances
• To check the fitups of pipes and structures for welding
• To arrange worker for welding after check up
• To arrange inspection before welding to check the weld joints and again after the welding
• Material verification according to the certificates
Projects Worked: Construction of New Riggs like B252 for SANTA FE, B256 for OCCEAN ROVER
Dec 1998 – May 2002
SPIC JEL ENGINEERING AND CONSRUCTION LTD. INDIA
Supervisor
• Instruct fabricator to fabricate according to clients drawings
• Quality inspection on completed welds
• Arrange NDT inspections on completed welds and to documentations.
Personal Details:
Name : C. Ramanathan
Father’s Name : J.Chockalingam
Date of Birth : 29 – 09 – 1976
Nationality : Indian
Marital status : Married
Passport No. : G2910399
Place of Issue : Trichy
Date of Issue : 17 – 07 – 2007
Date of Expiry : 16 – 07 – 2017
Declaration:
I hereby declare that the above information is true of the best of my knowledge.
Yours faithfully,
C. RAMANATHAN