Post Job Free

Resume

Sign in

Power Plant Thermal

Location:
Varanasi, India
Salary:
5.5-6 lacs
Posted:
September 19, 2010

Contact this candidate

Resume:

MITALI MADHUSMITA DEY

P G.D.C. – Thermal Power plant (NPTI,Nagpur)

B.E. (Mechanical)

Email Id : jyxs24@r.postjobfree.com, jyxs24@r.postjobfree.com

Mobile: 099********

Experience Summary

2+ years experience years of experience in Hindalco industries Pvt, Ltd. Thermal power plant performance monitoring (Turbine, Boilers & its Auxiliaries), Provide technical data for designing of power plant related solutions.

Role and Core Responsibility:

Thermal power plant performance monitoring (Turbine,Boiler & its Auxilliaries).

Engineering review

To plan, monitor, review & implement all jobs related to the Thermal Power Plant.

Provide technical data for designing of power plant related solutions.

Monitoring of execution / Co-ordination of site activities

Thermal power plant performance monitoring (Turbine,boilers & its Auxiliaries).

To monitor, review & implement all jobs related to the Thermal Power Plant.

Key responsibilities:

 Efficiency & Performance monitoring of pump, turbine, Boilers, cooling tower

& other equipments.

 Efficiency of boilers after & before survey and shut down.

 Efficiency performance monitoring of turbines after & before overhauling.

 Energy audit of various systems like Ash plant, Coal handling plant & coal mill.

 Daily MIS report preparation & calculation of Turbine heat rate.

 Various loss calculations, leakage calculation related to boilers & turbines.

 Calculation of auxiliary power consumption & take necessary steps to

Optimize the consumption.

 Performance monitoring of cooling towers.

 Pressure drop & energy loss calculation of various systems in turbine & boiler

Area.

Qualification

Degree Institute Major and Specialization

• Post Graduation Diploma Course

Thermal Power Plant Engineering (2007 to 2008)

• Bachelor of Engineering

(2002 to 2006) N.P.T.I., Nagpur ,

Maharashtra (Authorized by Ministry of power).

Kalinga Institute of

Industrial technology

Thermal Power Plant Engineering With 74.30 %

Mechanical Engineering with 82.90%.

Technical Skills

Language : C, C++

Operating System : Windows 2000, 98, Xp, Vista

Tools : M.S office, Turbine & Boiler Efficiency Calculation (eCalc)

Career Profile

Duration Organization Role

July 2008 to till date Hindalco Industries Ltd Efficiency &

Renusagar Power Division. Performance

Monitoring of

Pump, turbine,

Boilers & other

Equipments.

Company Profile: HINDALCO INDUSTRIES LTD. (Renusagar power division) U.P. AN ISO-9002 & ISO-14001 HOLDING ORGANIZATION HAVING PLF > 96% HINDALCO Renupower division is a flagship company of the ADITYA BIRLA GROUP the India’s second largest business house. The coal based thermal Power Plant has a capacity of 760 MW.

Strengths: - A self motivated and achievement oriented person with proven skills with willingness to adapt to any environment and achieve set goals in any condition within tight time scales. At NPTI we covered the efficiency aspects of Boilers, calculation of boiler efficiency by direct & indirect method, proximate & ultimate analysis of coal sample, monitoring of various parameters which affects the boiler efficiency, various leakage calculation, air preheater performance calculation, air gas calculation ,radiation loss, Turbines & power plant ancillaries. Calculation & analysis of a sample, heat rate calculation, heaters performance, effects of condenser vacuum, dryness fraction calculation by using mollier chart, heat transfer coefficient of various heaters, performance test conduct for 210 MW & more than 210 MW.General design & constructional features of Turbine construction of HP ,IP,LP turbine, turbine oil ,governing & protection system, need of governing system,hydromechanical speed governing loop, throttle governing, nozzle control governing system, glands & sealing system, turbine operation, boiler & auxillaries,generator& switch gear & unit protection.

Designing Courses:

• One month training at KIIT,BBSR (CATIA)

• Master CAM (CTTC, Bhubaneswar)

• PROE (Best Software Technology, Hyderabad)

Project Details:-

Title : Turbine & Boiler Efficiency

Calculation

Duration : Till Date

Tools : eCalc

Description:-

This project is a desktop-database application. The idea behind this application is to perform complex calculations for Turbines & Boilers to provide outputs like performance & efficiency. It uses ASME PTC 6 standards for Turbine performance & BS-2885 standard for Boiler efficiency. The software provides character & graphical reports like Bar chart & pie chart. The software also provides the What If analysis & online Unit Conversion calculator. The software provides two level securities: user level, module level. The software consists of modules like Administration, Backup/Restore, Boiler, Turbine, Tools, Reports and Help.

Personal Details:-

Date of Birth 08th Sept 1982

Current Address MMH-3, Renusagar Colony, Renusagar Power Division, Renusagar, Dist-Sonebhadra, U.P-(231218).

Phone Number 099********

Current CTC 3.5 Lack /annum(INR)

Expected Negotiable

DECLARATION:

I consider myself with MECHANICAL ENGINEERING aspect .I am also confident of my ability to work in a team. I hereby declare that information above is true to the best of my knowledge.



Contact this candidate