RICK REYES
ADDRESS: PHONE:
***** **** **** ** 956-***-**** (CELL)
RAYMONDVILLE TX, 78580 EMAIL: *********@***.***
MANUFACTURING ENGINEERING – PROJECT MANAGEMENT- LIAISON ENGINEERING:
** ***rs progressive experience with major aircraft companies.
Boeing, Sikorsky,Lockheed/Martin, Raytheon,Triumph Group Vought Division, General Dynamics. Dependable, resourceful and proactive with experience in root cause analysis /corrective action, improving manufacturing processes and work procedures while maintaining high quality projects completed on time and within budget. Well versed in all aspects of production, including scheduling, inventory, build of materials, planning and tooling. Skilled in CATIA 5 (interrogator)ENOVIA, Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Point.
PROFESSIONAL EXPERIENCE:
MARCH 22 TO PRESENT: TRIUMPH-VOUGHT AIRCRAFT
(CONTRACT) GRAND PRARIE, TX
Boeing 787 Program
Interact with internal and external customers (isreal, korea and,germany) with respect to corrective action and root cause analysis, problem resolution, and process improvement, product planning.
Provide guidance to engineering regarding design concepts and specification requirements to best utilize equipment and manufacturing techniques.
CATIA5 (Interrogator), ENOVIA, and, Team Center Manufacturing
Perform activities in a variety of cross-functional areas including production planning and control, total quality management, systems, manufacturing, equipment and facilities engineering, material management, and process reengineering.
Support production, business, and other processes in a team-based manufacturing environment.
AUGUST 2007 TO JANUARY 2010 : BOEING AIRCRAFT CO.
(CONTRACT) SAN ANTONIO, TX
C17 PROGRAM:
Assist in converting existing manufacturing processes into a lean manufacturing system. Developed, modified and maintained planning and engineering configuration for the C17program.
Coordinate with Industrial Engineers and shop management in efforts to determine accurate man hours and build sequence to support and improve production schedule.
SEPT 2006 TO AUGUST 2007 : VOUGHT AIRCRACT CO.
(CONTRACT) GRAND PRARIE, TX
BLACKHAWK PROGRAM
Provide engineering liaison support to manufacturing.
Determine Corrective Action/Root Cause Analysis in support of production and
prepare work orders and purchase request in support of production. Coordinate Interdepartmental activities with q/a, mfg, purchasing, engineering and contract administration. Resolving manufacturing issues concerning shortages, engineering changes and cancelation orders.
AUGUST 2005 TO AUGUST 2006 : BOEING AIRCRAFT CO.
(CONTRACT) SAN ANTONIO, TX
KC-135 PDM PROGRAM
Assist in converting existing manufacturing processes into a lean manufacturing system. Developed, modified and maintained planning and engineering configuration. Coordinate with industrial engineers and shop management in efforts to determine accurate man hours and build sequence to support and improve production schedule.
JUNE 2004 TO AUGUST 2005: VOUGHT AIRCRACT CO.
(CONTRACT) GRAND PRARIE, TX
C-5 AND C-130 PROGRAMS
Provide engineering liaison support to manufacturing.
Prepare work orders and purchase request in support of production.
Coordinate interdepartmental activities with q/a, mfg, purchasing, engineering and contract administration in resolving manufacturing issues concerning shortages, engineering changes and cancelation orders.
SEPT 2003 TO APRIL 2004: LOCKHEED/MARTIN AIRCRAFT CO.
(CONTRACT) FT. WORTH, TX
F-16 PROGRAM
Lead contract reliability engineer (r/e). Resoponsible for coordinating r/e contract personal placement with management and forseeing job performance overall contract personel. Performed special projects for management for manufacturing organization. Provided liaison support for design engineering.
MAY 2002 TO SEPT 2003: STEWART AND STEVENSON FMTV-FAB CENTER
(CONTRACT) HOUSTON, TX
Generate production routing and manufacturing work instructions
Provide cost analysis for manufacturing/tooling detail parts
Maintain configuration and implement engineering change orders.
Create tool concepts for manual machining on drilling and saw cuts.
APRIL 1999 TO SEPT 2001: RAYTHEON -AEROSPACE INTERGRATED SYSTEMS
(CONTRACT) WACO, TX
Boeing Business Jet Interior Modification Program
Interior modification of new aircraft, Boeing 737 and airbus A340 for heads-of-state for Sultan of Brunei, and Boeing , Project Planner, Liaison Planner and Engineering interface.
MAY 1998 OCTOBER 1998: ALLIED SIGNAL
TULSA, OK
Responsible for initial planning, material's list and tooling on jet engine fuel heaters for various engine manufacturers while utilizing MRP system.
OCTOBER 1997 MAY 1998: LOCKHEED MARTIN AEROSPACE
(CONTRACT), HARLINGEN, TX
Project responsibility for initial planning new Atlas II thrust booster section, also coordinated with engineering in analyzing, and implementing new and revised engineering change notices for the
Atlas II, Atlas IIAS, and the Centaur Rocket programs.
DECEMBER 1995 OCTOBER 1997: CHRYSLER TECHNOLOGIES AIRBORNE SYSTEMS
(CONTRACT). WACO, TX
Boeing Business Jet Interior Modification Program
Interior modification of new aircraft, Boeing 737 and airbus A340 for heads-of-state for Sultan of Brunei, and Boeing , Project Planner, Liaison Planner and Engineering interface.
JUNE 1995 TO DECEMBER 1995: McDONNELL DOUGLAS AIRCRAFT CO.
(CONTRACT) ST. LOUIS, MO.
Responsible for production planning and liaison support for fuel systems, structures, hydraulics, electrical assemblies, nose and main landing gears for final assembly on the F/A-18 E/F program.
OCTOBER 1993 TO SEPTEMBER I994: McDONNELL DOUGLAS AIRCRAFT CO.,
(CONTRACT) ST. LOUIS, MO,
Duties involved extensive use of ugii system version 9 and Aztec model ac-65 digitizer table to prepare and modify illustrations, visual aides and shop tooling to assist in the Fabrication of sheet metal detail parts for the F/A-18, F-15,C-17,AV-8, T-45, MD80 programs.
JANUARY 1993 TO SEPTEMBER 1993: CLARCKO INDUSTRIES
(CONTRACT) HOUSTON, TX
Responsible for assembly and detail planning, liaison support and tool modification on sheet metal parts for F-16 program.
JULY 1988 TO DECEMBER 1992: GENERAL DYNAMICS AEROSPACE CO.
HARLINGEN, TX
Project responsibility for developing initial Planning Build of Materials while coordinating with various engineering and production groups to establish implementation of costs effective manufacturing methods. Analyzed and interpreted new and revised engineering change notices.
REFERENCES FORWARDED UPON REQUEST
EDUCATION:
AMERICAN INTERCONTINENTAL UNIVERSITY ATLANTA GEORGIA
DEGREE: BACHELOR OF SCIENCE
MAJOR: BUSINESS ADMINISTRATION-MANAGEMENT
TEXAS STATE TECHNICAL COLLEGE HARLINGEN, TX.
DEGREE: ASSOCIATES OF APPLIED SCIENCE
MAJOR: DRAFTING AND DESIGN TECHNOLOGY