Post Job Free
Sign in

Maintenence

Location:
United States
Posted:
March 04, 2011

Contact this candidate

Resume:

PERSONAL INFORMATION

Name and Last Name: Miguel Antonio Castro Murzi

Nationality: Venezuelan

Address: Urb. Los Caciques, Calle Norte 3, Casa Nro.48. Punto Fijo, Falcón, Venezuela.

Phone Number:

(Cell Phones): 002*********

(Home Phone): 058-269-***-****

E-Mail: *********@*****.*** / *********@*******.***

Level of education:

o Aeronautical Engineer – Institute Universitario Politécnico de las Fuerzas Armadas Nacionales (IUPFAN), 1979.

o Magister in Business Administration – Universidad del Zulia (LUZ), 1993.

Another language: English: Writing and speaking: good and fluid

Informatics: Excel, Power Point, Word, Windows 98/XP/Vista, SAP, Lulo Win, Lotus notes, Primavera Planning software and MS Project.

AREAS OF KNOWLEDGE

• Experience in the development, implementation and coordination of maintenance plans in the following process units: Plant Gas Separator; Crude Oil; High Vacuum; Electric Plant; Fluid Catalytic Cracking; Naphtha Hydrotreater ; Catalytic Reformer; Delayed Coking; Flexicoker; Conveyor Systems Coker; Plant Treatment of Kerosene and Gasoline; System Fuel Gas Distribution; Flare System; Production Systems Steam Pressure.

• Develop procedures of work for Static and rotative equipment.

• Analysis for Safe Work (ATS).

• Security based on the human behavior (SBC)

• Member of team work during construction and start of new facilities, P.A.R.C. (Cardon Refinery).

• Reading and interpretation of drawings (P & ID'S).

• Safety, Hygiene and Environment in the Petroleum and Petrochemical Industry.

• Experience in the selection of Technical Personnel.

• Technical advisor of maintenance area.

• Management and Coordination for plant Shutdown.

• Analysis of activities and resources required for planning, programming routine maintenance and execution maintenance during shutdown of plant

• Estimated budget for routine maintenance and shutdown of plant, control and monitoring.

• Leadership, Accountability, and Personnel Management.

• Knowledge on analysis, reliability and preventive maintenance on plants.

• Static and Rotative equipment.

• Technical specification.

• Analysis of spare parts to ensure the reliability of the units.

• Knowledge of codes DEP'S SHELL, PDVSA, INELECTRA, API, ASME, TEMA.

• 17 years of experience as volunteer firefighter and commander groups.

WORK EXPERIENCE (About recent years)

29 years of experience in PDVSA (20 years 1982-2002) in the Refinery Cardon:

• 2 years in the process of induction as an Inspector of Static and Rotating Equipment;

• 4 years as Assistant Engineer in the area of Distillation.

• 18 years of experience in the following positions:

o Maintenance Supervisor at Power Plant;

o Maintenance Coordinator in the distilling area;

o Maintenance Coordinator assigned to the PARC Project (plan to the adequacy of Refinery Cardon) in the phase of construction and reception (Comissing);

o Maintenance Coordinator in Media Conversion;

o Maintenance Superintendent of Special Equipment; member of the team during the process of integration Maraven-Lagoven as CRP;

o Maintenance Manager of Deep Conversion at the Amuay Refinery–CPR.

o Additional Plant Manager Deltaven Plant and CRP Mechanic Workshop.

• 4 Years as project manager.

In Petrochemical 4 years as Maintenance Manager in Propileno de Falcon, Profalca C.A.

COMPANY: STORK WESCAR

CHARGE: Project and Construction Manager

• Purpose: responsibility for the organization and supervision of all activities related to the project.

• Outcome: assurance that the project meets the SHEQ-Standards engineering plans and specifications and the work is accomplish within budget and on schedule.

• Context in which the role operates:

o The division's purpose is creating an environment that puts the project first.

o To deliver on this purpose the division must add value to its stakeholders by providing:

- Direct supervision of safety, quality assurance, quality control, administrative, engineering and craft superintendents on the project. Review and approve all billings to the client, coordinate efforts with engineering, operations, procurement, inspection, and client personnel.

- Implementation and monitoring all management reports and procedures in accordance with division and corporate guidelines.

- Monitoring schedules, changes, and deviations in work scope and quality.

- Generally work closely with client representatives, therefore he/she needs to project a professional attitude and appearance at all times.

This is a key position in the project division which requires a high level of leadership and guidance.

COMPANY: PETROADVANCE, C.A.

DATE: 10/15/08

CHARGE: Execution Manager

• Responsible for the activities of maintenance of the boiler type Radiante - acua tubular electric generation capacity of 60 Mw; recruitment technical personnel and logistics materials for the company Electricidad de Caracas (TACOA).

COMPANY: CONSTRUBIENES, C.A.

DATE: Jan. 2008 – Jun. 2008

CHARGE: Manager of Construction

• Ensure Compliance of the planning - Programing of all activities, recruitment technical personnel and logistics materials of new facilities Catia La Mar for the Army Venezuelan.

COMPANY: PROFALCA, C.A.

DATE: Nov. 2003 – Nov. 2007

CHARGE: Maintenance Manager

• Ensure Compliance of the planning - Programing of all activities, recruitment technical personnel and logistics materials Ensure the reliability (99,6%) of the plant separator gas by maintaining proper equipment and facilities to develop and implement the plan reliability.

• Selection of personal tools and equipments.

• Audits maintenance techniques.

• Update maintenance plan for all disciplines and incorporation of planning process-scheduling and preventive maintenance activities.

• Design personnel training plans, according to the needs.

• Review and process of functions and description of work processes, according to ISO 9000 and 14001 certifications.

• Shutdown of the plant: design and structure of the organization (responsible for three shutdowns) staff selection, development and approval of the scope of work.

• Review and approval of technical documents.

• Development and implementation of budgets for routine maintenance (2.7 MM $ 2007) and shutdowns (4.5 MM $ 2008).

• Responsible for the first phase of Expansion project of the plant, as Manager.

• Personnel assigned to the organization – 10 persons.

COMPANY: PROFALCA, C.A.

DATE: Sep. 2003 - Nov. 2003

CHARGE: Technical Adviser PROFALCA, C.A.

• Performed technical audit of Maintenance Department that let the Department to be an independent unit in the Plant Operation.

COMPANY: CENTRO REFINADOR PARAGUANÁ (PDVSA)

DATE: Sep. 2000 - Nov. 2002

CHARGE: Manager Maintenance Depth Conversion Amuay

• Responsible for the rotating and static equipments, installation of Delayed Coker Plant. Flexicoquer of backup and storage of Coker, by applying a type Preventive and Predictive Maintenance-based on Reliability.

• Responsible for the preparation of the proposal, obtaining approval, planning, programming and subsequent execution of the annual budget of (9000 MMBs) of the Conversion Unit.

• Important Projects: Recovery and maintenance of the Coker Organization and Flexicoquer. Proposed and approved the change of material of the panels of the tapes and roller bearings with an investment of approximately (7000 MMBS) and recovery, in a record time, of the pit assistant collection coke through a proposed additional system.

COMPANY: CENTRO REFINADOR PARAGUANÁ (PDVSA)

DATE: 1999

CHARGE: Superintendent Maintenance

• Assigned to the working group coordinated by the Manager of Maintenance for the integration phase of the Organization of Maintenance on the CRP.

COMPANY: MARAVEN S.A., (PDVSA)

DATE: 1998 – 1999

CHARGE: Superintendent Special Teams

• Responsible for the unit that carries out all maintenance activities related to work weld (special or otherwise) in piping systems, equipment and structures, maintenance, installation, repair and centrifugal compressors reciprocates; heavy maintenance of the fleet; refrigeration and pressurization systems.

COMPANY: MARAVEN S.A., (PDVSA)

DATE: 1997

CHARGE: Superintendent Group The execution Routine Maintenance

• Leader of the group keeping all areas of the Cardon Refinery, (Deep Conversion; Media; Distillation; Lubricants, Foreign and Industrial Services)

COMPANY: MARAVEN S.A., (PDVSA)

DATE: 1996-1998

CHARGE: Maintenance Coordinator Assets Unit (UDA) Area Media Conversion

• Responsible for the implementation of the preventive maintenance of rotating and static equipments, and installation of the Catalytic Cracking Plant (FCC Fluid Catalytic Cracking); Visbreaker I / II / III; Naphtha Hydrotreater, Catalytic Reformer).

• Relevant activities: preparation of the maintenance plan and selection of parts for the new facilities built (Naphtha Hydrotreater, Catalytic Reformer). Implementation of the scheme of load of catalytic reactor of the plant, as well as the selection and purchase of needed equipments and spare parts.

• Personnel assigned to the organization – 12 persons.

COMPANY: MARAVEN S.A., (PDVSA)

DATE: 1994-1996

CHARGE: Coordinator Maintenance assigned to PARC.

• Assigned to the construction phase and commissioning (Naphtha Hydrotreater, Catalytic Reformer) of the new Media Conversion plants facilities.

COMPANY: MARAVEN S.A., (PDVSA)

DATE: 1988-1994

CHARGE: Coordinator Maintenance Area Distillation

• Responsible for the implementation of the preventive maintenance of rotating, static equipment and facilities, Plant: PG-1; AV-2/3; CD-1/2/3; TK-1/2.

• Relevant Projects: Design / implement correction methods for hydrocarbon leaks in boards and equipments with new technology (equipment and material); installing double mechanical seals; incorporating the maintenance for rotating equipments of the system of alignment for beams laser.

Note: Manager in charge between 1999 - 2000 in four opportunities of the CRP Workshops, in 98/99 as Manager of the Deltaven plant of lubricants for vacations of the holders.



Contact this candidate