Post Job Free
Sign in

Quality Control Engineer

Location:
Hasbrouck Heights, NJ, 07604
Salary:
$90,000/per year
Posted:
September 21, 2012

Contact this candidate

Resume:

Name: DANTE T. REYES

Date: Sept.**, ****

Position Applied: Civil Estimator

Home Address: ** ********* ******,

Hasbrouck Heights,

NJ-07604

E-mail Address: **********@*****.***

Cellphone Number: 201-***-****

PROFESSIONAL LICENSES AND SOCIETIES

1. PROF. LIC. NO. 0012112-98 From Professional Regulation Commission, Philippines

2. MEMBER Philippine Institute of Civil Engineers – No. 95-86-19403

EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS

DEGREE CERTIFICATE ETC. SCHOOL MAJOR (OR SUBJECT) DATE

BS Civil Engineering Mapua Institute of Technology- Civil 17 April 1971

Manila, Phillipines

OTHER SIGNIFICANT INFORMATION

TRAINING AND SEMINARS ATTENDED:

1. Project Management Mohammad Al Mojil Est/EEI – Saudi Arabia

2. Management by Objectives Mohammad Al Mojil Est/EEI – Saudi Arabia

3. Basic Construction Management Mohammad Al Mojil Est/EEI – Saudi Arabia

4. Project Management on Human Behaviour in Mohammad Al Mojil Est/EEI – Saudi Arabia

Organization

5. Defensive Driving Al Tameer Project –Bechtel/EEI - Kuwait

6. First Aid Course Al Tameer Project – Bechtel/EEI - Kuwait

7. Safety Training OGD II Project –Technip/Bechtel JV – Habshan, UAE

8. Safety Leadership Workshop AGD Phase 2 Project –Eastern Bechtel -Asab, UAE

9. With valid USA Driving License – Expiry Date: 11/30/2015

10. Green card holder/Asian ethnicity

PERIOD COMPANY POSITION-WORK DESCRIPTION

Jan. 11 2009

To

Sept. 30, 2010

Aldar Besix LLC-

Ferrari & Retail Experience Projects

YAS Islands, Shahama Abu Dhabi, UAE

CHIEF SITE SUPERVISOR –

Assigned in the supervision of asphalt road constructions and U/G piping installations for storm water drainage, sewer lines, irrigation, potable water, natural gas line, and manholes construction.

Supervision for the construction of 4- U/G Storm Water Tank and 2-I A/G Irrigation Tank structures.

Supervision for U/G electrical & Telecom - Etisalat, Du, ELV, LV, 22kv HV Cable, Fiber Optics, and chambers.

Supervision for External Landscaping works and Signage installations for Ferrari & Retail site.

Coordinating with different discipline contractors to resolve work interfacing and obstruction issues.

Implementation of company’s safety rules and regulations and quality control program.

Preparation of Daily and Weekly Progress Report.

Feb. 8, 2006

To

Nov. 30, 2008

Eastern Bechtel Co. Ltd.- AGD (Asab Gas

Development )-II Project, Asab, Abu Dhabi, UAE

CIVIL/BUILDING SUPERINTENDENT

Assigned in the supervision of site preparation and asphalting of 10 km.(6.2 miles) desert sand Access Road, site preparation of 360,000 s.m. (89 acre) Camp Site (5,000 man capacity) with the installation of infrastructures and housing units, erection of Temporary Facilities, and site preparation for the 265,000 s.m. (66.72 acre) New AGD-II Plant.

After the above, I was assigned in AGD-II Plant site to look for all the Manholes & Valve Boxes (552 ea.) installation for U/G piping, and in the construction of E&I Cable Road Crossing Culverts (76 ea.).

Was assigned later in the finishing supervision for all the Process Buildings ( 220 kv Substation, Substations 05 / 06 / 07 / 08, IES 05 / 06 / 07, VSD-141-CM-001/002,VSD-241-CM-001,FW Pump House, and Operator Shelters 11 / 12 / 13 / 14 .

Conducting Building works coordination meeting with different discipline subcontractors to resolve work interfacing issues.

Implement company’s safety and quality control program.

Preparing Daily and Weekly Progress report for civil/building works.

Sept. 10, 2004

to Nov. 26, 2005 Technip-

NEB (North East Bab) Phase 1 Development

Project - Al Dabbiya & Rumaitha Site, Abu Dhabi, UAE

CIVIL/BUILDING SUPERVISOR

Assigned to Field Engineering and QC Group with the following responsibilities related to civil / building works (220 kV Substation / 33 kV Substation / 11 kV Substation / Control Bldg. / ITR Bldg./ Guardhouse – each site):

- Reviewing and approval of construction materials, vendor shop drawings, and method statement;

- Making site design modification, additional construction details, and answering site technical queries;

- Field supervision and performing QC function in witnessing the request for inspections for building civil and architectural works, plumbing, HVAC equipment/duct and accessories installations, conduit/cable/fittings installation for Lightings, Small Power Sockets, Telephone & Paging, Fire & Gas, Access Control and Security System, Lightning Protection, and Earthings;

- Conducting the Building Weekly Progress meeting in Rumaitha with Subcontractors and taking the minutes for distribution to concerns;

- Makes and monitor the Punch list for building completion hand over.

- Implementation of company’s safety program.

Jan. 22, 1999 to

Aug 2001

Technip / Bechtel Joint Venture – OGD (On shore Gas Development) II Project, Habshan, Abu Dhabi, UAE

SR. CONSTRUCTION ENGINEER

Assigned to JV Field Engineering Group as Sr. Building / Civil Engineer – responsible for review and approval of Building materials supplied by Subcontractor for Civil and Architectural Finishes for IES(Instruments and Electrical Station) Bldgs., Substation Bldgs., Vehicle Garage, Operator and Maintenance Shelters, Chemical Sheds, Fire Station Extension, Laboratory Bldg. Expansion, Dry Chemical Store, and Light / Heavy Storage Bldg. Extensions. Resolving some Engineering problems by issuing Site Work Instructions and Site Design Modifications for Bldg. / Civil and miscellaneous structural steel access platform; Responsible for JV Quality Control Inspection Program and Field Supervision for Buildings, Equipment / Steel Structure foundations, Paving, Fencing, Landscaping and Irrigation, and U/G utilities; Issuing and monitoring punchlist completion for the above-mentioned activities for Mechanical Completion Package Handover to client; Supervised the installation of Fire Protection for Buildings and Traffic Signs for Plant roadways; Implementation of company’s safety program.

Feb. 23, 1997 to Dec. 01, 1998

Saudi Arabian Bechtel Co. – Shaybah Central Crude Oil Producing Facilities, GOSP 1, 2, and 3

Shaybah, Saudi Arabia

SR. CONSTRUCTION ENGINEER

Acted as Lead Civil / Building Engineer in Field Engineering Group – responsible for review and approval of Building / Architectural materials supplied by subcontractor for Control Houses, Substations, Operator Shelters, Maintenance Bldg. And Offices, Prayer Shelter, Dry Chemical Bldg., Emergency Generator Bldg., and Coffee Shop & Restaurant Bldg. Resolving Engineering problems by issuing Site Design Modifications and answering Request For Information for U/G utilities, Buildings, Foundations, Earthworks, Paving and Misc. Steel Platforms; responsible for Company Quality Control Inspection Program and Field Supervision of Civil / Bldgs.; issuing and monitoring completion of punchlist for Civil / Building / Structural Steel for Mech. Completion Package Handover to Client; Supervised the installation of Fire Protections for Buildings and Process Areas, and Traffic Signs for Plant roadways; Implementation of company’s safety program.

Sept, 1995 to Jun 30, 1996

Eastern Bechtel Corp./Technip Joint Venture-

OGD (On shore Gas Development)-I Project, Habshan, Abu Dhabi, UAE

SR. CONSTRUCTION ENGINEER

Assigned to JV Field Engineering Group for Civil/Building works with responsibilities in weekly construction progress reporting, Quality Control inspection, and Field Supervisions for 28 Buildings / shelters, making Site Design Modifications for miscellaneous steelworks, issuing and monitoring punchlist for Building Mechanical Completion Package Handover. Also assigned to look for HVAC System punchlist & witnessing of Test Packs.

Implementation of company’s safety program.

May, 1995 to Aug, 1995

AGC Construction, Manila, Philippines

PROJECT INCHARGE

Handled the estimating and direct construction supervision of the 8-classroom, 2 story reinforced concrete building at the Public Elementary School of Tatalon, Quezon City using 50 direct Labor.

Implementation of company’s safety and quality control program.

Oct, 1993 to Mar, 1995

SHENTON

Construction Company,

Philippines

SUPERINTENDENT

Directly Supervised the following projects: Ayala-Alabang Town Center’s 2000 Tons Structural Steel erection using 200 manpower; Shiplift fabrication in KEPHIL Shipyard-Batangas with 50 manpower; and design, estimate, and supervision for the erection of 4-units 20,000 gals. Elevated Water Tank in Tanauan, Batangas and Calamba, Laguna with 20 manpower.

Implementation of company’s safety and quality control program.

Apr, 1991 to Jun, 1993

BECHTEL/EEI

Al-Awda/Tameer Project Ahmadi, Kuwait

BUILDING SUPERVISOR

Handled the following direct work supervision and material preparation for:

1. Refurbishment of Berham Court Housing Block E, F and D in Ahmadi

2. Refurbishment of Rheneformer Control Building and Operation Bldg. In Ahmadi Refinery.

3. Initial clean-up works for all buildings in Ahmadi Refinery.

4. Sandblasting and painting of pipes and steelworks for South Pier Oil Recovery, Eocene Plant, and Rheneformer in Ahmadi Refinery, for Shuaiba and Mina Abdullah refinery Rehab Project.

On my second year, I was assigned to Field Engineering, Task-Force 6 for Buildings.

I handled the Civil Field Engineering Services and Site Work Supervision/Inspection for the following facilities:

Ahmadi Ice House Expansion, Instrument Workshop cleaning facilities, Abdulliyah and GC-17 Substations, Burgan Fire Station Heavy Duty Slab Garage, Extension of Out Patient Hospital, Procurement Offices Modifications, Construction of New Telecom Buildings at Burgan and GC-17, New S/S FI6N (Umm Gudair), Cathodic Protection Rectifiers Compound for GC(Gas Gathering Center)-17, GC-1, GC-13, GC-21, GC-8 and GC-5, Modification of Main PABX Building, Telecom Manholes Guard Posts installation on Magwa Road, and replacement of Cable Trays with Brackets at N.A. Radio Tower. Refurbishment of Purchasing Department Offices, Subkha Substation F22, Substation F160 (GC-16), 15-units 11KV Transformer yard in Umm Gudair, 7-units Well Heads 440V and 11KV Electrical Equipment Shelter, and Production Operation Building in Minagish (GC-16)

Implementation of company’s safety and quality control program.

1989 - 1990

M.S. Al Suwaidi Contracting & Trading

Rahima, Saudi Arabia

SENIOR CIVIL ESTIMATOR

Responsible for estimating the direct and indirect labour cost, materials, equipment, and final costing summary of projects with major civil-architectural works.

My awarded projects were the following:

1. Utility Works II – Seawater Cooling System, PIC A-1085, Royal Commission/ENDECO Project in Yanbu. SR 5,500,000.00

2. South Pier Replacement of Superstructure Terminal, CN-25954/00 ARAMCO Project in Rastanura, SR 5,430,600.00

3. Heat Exchanger Cleaning Facilities, CN-2XL3SA SADAF Project in Jubail. SR 700,000.00

Site visiting and attending job explanation meeting for project bidding.

1987 – 1988

Braun Transworld Corp./ EEI-Mina Abdullah Refinery Modernization Program, Kuwait

AREA SUPERINTENDENT (BUILDING)

As Area Superintendent, I was responsible for site supervision and inspections in the construction of Operator Shelters, Maintenance Shelters, Nitrogen Loading and Soda Ash Shelters, Maintenance Building, Warehouse, Paint and Chemical Storage Building, and in the installation of Roofing and Sidings of Compressor Shelters in various units.

Implementation of company’s safety and quality control program.

Buildings weekly progress reporting.

1986 - 1987

Braun Transworld Corp./ EEI-Mina Abdullah Refinery Modernization Program, Kuwait

FIELD OFFICE ENGINEER / CIVIL INSPECTOR

Responsible for Planning and Scheduling, and work progress checking for Control Houses, Warehouse, Maintenance Building, Paint and Chemical Storage Building, Substation “B” Building, Package Substations, and Emergency Generators Foundation works. I also handled the site supervision and inspection of concreting works for foundations of Package Substations, Emergency Generators, and Transformers. I have also done some estimating and design details for buildings and Power Distribution Foundations.

Implementation of company’s safety and quality control program.

1981 - 1985

M. Al-Mojil Est. - EEI

PO Box 11, Dammam, Saudi Arabia

ESTIMATING GROUP SUPERVISOR

Responsible for the overall supervision, coordination and control of mechanical and civil estimating works, mostly for ARAMCO Projects.

1979 - 1981

M. Al-Mojil Est. - EEI

PO Box 11, Dammam, Saudi Arabia

CIVIL ESTIMATING SUPERVISOR

Responsible for direct supervision, coordination and control of all phases of civil works activities required in estimating, planning, scheduling and other related engineering works.

Some of the awarded project estimates done by my group with my supervision were the following:

1. Shedgum Power Plant

SR 23,000,000.00

2. Udhailiyah Medical Clinic

SR 8,000,000.00

3. Udhailiyah Well Services - Facilities

SR 6,000,000.00

4. Aindar Desalter

SR 16,000,000.00

Site visiting and attending job explanation meeting for project bidding.

1978 – 1979

SABCO/

M. Al-Mojil Est. -EEI

PO Box 11, Dammam, Saudi Arabia

SUPERINTENDENT/PROJECT IN-CHARGE

Handled the site supervision with maximum of 100 direct and indirect labor in Ghanimah Seawater Project-Uthmaniyah Water Injection Pump No.1, with work activities consisting of rock excavation, foundations, Control Building, piping, equipment installations, structural steel works, and electrical/instrumentation. Was also assigned to supervise the miscellaneous foundation works for WIPS-3, 4, and 5.

Implementation of company’s safety and quality control program.

1977 – 1978

Holmes & Narver/

M. Al-Mojil Est. - EEI

PO Box 11, Dammam, Saudi Arabia

GEN. SUPERINTENDENT/PROJECT

IN-CHARGE

Handled the site supervision with 300 direct and indirect labor in the construction of Shedgum ARAMCO Construction Camp, Office Complex, Material Storage Yard, Warehouse, Swimming Pools, 400 and 800 Men Theatre, 4T and 6T Ice Plant, asphalt and concrete walkways, Perimeter Fencing, and Grounding. Directly in-charge for concreting works with total volume of 2000 m3 and in building erections. Implementation of company’s safety and quality control program.

1975 - 1977

Engineering Equipment Inc., Manila Philippines

SENIOR / FIELD ENGINEER

Designing and estimating of critical / major civil and structural steel works, and was assigned as Engineering Coordinator and Field Engineer in Australian National Industries (ANI) Philippine Forge Plant Project in Sta. Rosa, Laguna – which supervised site preparations, machines and building foundations concreting works, plant road paving, building architectural finishing, and perimeter fencing. There were 100 direct civil labor assigned to these works under my direct supervision with company’s safety and quality control program implementation.

1971 – 1975

Engineering Equipment Inc., Manila Philippines

JUNIOR ENGINEER

Designing and estimating of small to medium projects on civil and structural works. Checking of fabrication and erection drawings of awarded projects for structural steelworks.

Some of my awarded projects were the following:

1. Philex Mining Secondary – Tertiary Building Expansion, Structural Steel – 800 tons.

2. Philex Mining Magnetite – Concretrate Storage Building, 100’ span x 400’ long – A two-hinged arch structural steel building

3. Conveyor Frame-Housing 200’ long w/ tower (40) support at 40’ span each bay - Philex Mining

4. Beer Tanks Structural Steel Building– San Miguel Corporation

5. 50,000 and 60,000 gals. LPG Tank (Bullet Type) foundation – Caltex Philippines

6. Republic Glass Industrial Building, 400’x400’ – Open Web Truss Type Structural Steel Building

7. Heat treatment office and Forge Plant Office Buildings – ANI Philippine Forge Plant

8. Structural supports and platforms – Shell Philippines

9. 400’ long Bus Duct, an open web beams with A-Frame supports – Gen. Motors Philippines

10. 100’ diameter ring foundation for vertical storage tank – Columbian Carbon Philippines

11. Allen Engineering Warehouse

12. Gillet Rigid Frame Warehouse

13. Miscellaneous building and structures.

Job References:

1. Steve K. Worrell (former Bechtel manager)– Director of Aldar Yas Island Project, Abu Dhabi, UAE

2. Ernesto Ascrate (former Engineer of M. Al Mojil Est./EEI) – Mechanical Estimator of Skanska, NY.

3. Bobby Ferrell – Bechtel Site Manager



Contact this candidate