CURRICULUM VITAE
PERSONAL DETAILS:
Name : IMRANUR REHMAN
Date of Birth : 17/11/1982
Nationality : Indian
Passport Number : G 8772848
Expiry Date : 02/07/2018
INDIAN UNION DRIVING LICENCE : MP04N-201*-*******
EXPIRY : 28/03/2030
Languages Known : English, Urdu, Hindi
CONTACT DETAILS: 009***********/009***********
EMAIL : **********@*****.***
CAREER OBJECTIVES:
To realize self evenly through the work I undertake however trivial it may be the effect to synchronize heart, mind and deep. With self knowledge gained day by day melting the little self by becoming more and more useful to the organization.
EDUCATIONAL QUALIFICATION:
B.C.A (GRADUATION )BARKATULLAH VISHWAVIDYALAYA, BHOPAL
HSSC M.P. BOARD
HSC M.P. BOARD
PROFESSIONAL QUALIFICATION:
NACE APPROVED PAINTING INSPECTOR (CIP LEVERL -2 MARINE CERTIFIED) USA
NACE APPROVED PAINTING INSPECTOR (CIP LEVEL-1 CERTIFIED)USA
SAFETY INDUCTION
I ATTENDED MANY SAFETY INDUCTIONS IN OMAN, IRAN, AND UAE.
ESPECIALLY FOR H2SO4, CONFIEND SPACE, DRY DOCK ETC.
TECHNICAL KNOWLEDGE
HAVING EXPERIENCE OF COATING INSPECTION FROM SURFACE PERPARATION TO CLIENT FINAL INSPECTION (IN TANKS FINAL CLOSE OUT) IN RIGS, TANKS LIKE SEVICE FIRE WATER TANK, POTABLE TANKS, DIMENERALIZE WATER TANK, FUEL TANK, BALLAST TANK, MUD TANK, OILY WATER TANK ECT. IN PIPELINE LIKE DUPLEX STAINLESS STEEL FOR GAS PIPELINE(FIELD JOINTS) AND CARBON STEEL FOR OIL PIPELINE, ABOVE GROUND AND BELOW GROUND. MANY OTHER STEEL STURCTURE, SHRINK SLEEVE APPLICATION, MANY CRITICAL COATINGS AND LINNINGS LIKE BELZONA 1391, CHEM FLAK ETC. IN THIS 10 YEARS.
CONDUCTED TEST AND INSTRUMENTS
SLING PSYCHROMETER AND PSYCHROMETIC SURFACE TEMPERATURE THERMOMETER, CHART TO CHECK AMBIENT CONDITION ASTM E 337, Method B..
1. WET FILM THICKNESS GAUGE (COMB GAUGE)
2. DRY FILM THICKNESS GAUGE (SSPC PA-2)
A. EDDY CURRENT GAUGE (POSI TECTOR 6000)
B. ELECOMETER 456(TYPE2 GAUGE)
C. BANANA GAUGE (MAGNETIC PULLOFF GAUGE TYPE 1)
3. LOW VOLTAGE HOLIDAY TEST
4. HIGH VOLTAGE HOLIDAT TEST.
5. ADHESION TEST.(DOLLY PULL OFF ADHESION TEST ELCOMETER 106)
6. SALT CONTAMINATION TEST.
7. CROSS CUT ADHISION TEST.
8. PEEL OFF TEST (SHRINK SLEEVE)
9. SCM 400 FOR SALT CONTAIMENATION TEST.
LISTING OF NACE, SSPC, AND ISO SURFACE PREPARATION STANDARDS WHICH I USED WORK.
NACE SSPC ISO 8501-1
NONABRASIVE
CLEANING
Solvent Cleaning --------------- SSPC-SP 1 ------------
Hand Tool Cleaning------------- SSPC-SP 2 St2 or St31
Power Tool Cleaning ----------- SSPC-SP 3 St2 or St31
Power Tool Cleaning to Bare Metal SSPC-SP 11 ----------
Flame Cleaning ------------------- SSPC-SP 42 F1
Pickling ------------------- SSPC-SP 8 ----------
Water jetting NACE No. 5/ SSPC-SP 12 ----------
ABRASIVE BLAST CLEANING JOINT SURFACE PREPARATION STANDARDS
White Metal NACE No. 1/SSPC-SP 5 ISO Sa 3 (“Blast-Cleaning to Visually Clean Steel”)
Near-White Metal NACE No. 2/SSPC-SP 10 ISO Sa 2 ½ (“Very Thorough Blast-Cleaning”)
Commercial NACE No. 3/SSPC-SP 6 ISO Sa 2 (“Thorough Blast-Cleaning”)
Brush-Off NACE No. 4/SSPC-SP 7 ISO Sa 1 (“Light Blast-Cleaning”)
Industrial NACE No. 8/SSPC-SP 14
1 ISO St is for hand and power tool cleaning. The two grades, St 2 and St 3 are shown as attainable with either hand or power tool cleaning.
2 WITHDRAWN
3 NOTE: ISO 8501-1 has been widely adopted as a national standard in a similar way to B.S. 7079 in various countries, including Australia, New Zealand, Sweden, Japan.
BSI B.S. 7079 standards are equivalent to ISO 8501-1.
WORK EXPERIENCE: + 10 YEARS
1) EMPLOYER : HI-TECH PETROLEUM ENG. CONTRACTOR. BHOPAL M.P.
DESIGNATION : QA/QC INSPECTOR PAINTING/ COATING
DURATION : DECEMBER 2009 to TILL DATE
Responsibilities:
Carry out inspection on a timely basis.
Final Inspection
Preparation of Final Painting Reports,
Documentation works, monitoring weather conditions.
Estimation and procurement of Painting materials requirement
Monitored Surface preparation with Hand tools, Power tools, Solvent cleaning and Garnet blasting of Tanks and Vessels based on specification requirement
Monitoring of coating and Painting activities of Tanks and Vessels based on specification requirement
Preparing Daily and monthly work progress report
2. EMPLOYER : PRIME 4 INSPECTION DUBAI UAE
PROJECT : TDS 2000-Dynamically Positioned Semi-Submersible Drilling Rig-001 FOR BRAZIL WORKING WITH GULF PIPEING CO.(GPC)ABU DHABI UAE
DESIGNATION : QA/QC INSPECTOR PAINTING/ COATING
DURATION : 25 AUGUST 2009 TO 8 NOVEMBER 2009
Responsibilities:
To follow ITP and carry out inspection on a timely basis.
Final Inspection of Surface preparation and Application Documentation, Monitoring weather specified conditions.
Preparation of Final Painting Reports for test packs.
Surface preparation inspection
Conducting salt test on surfaces
Monitoring mixing of paints
Maintaining batch certificates for incoming materials for painting
Maintaining test certificates for paints
Reviewing of paint schemes
Monitoring painting activities
Measuring dry film thicknesses using DFT gauges
Conducting holiday test on painted surfaces
Maintaining record for all stages
Preparing stage wise reports
To handle DFT gauge. Holiday testing equipment, PIG guage.
Assess condition of substrate
Check the correct material have been received for the use
Check proper storage of coatings as per manufacturer’s data sheet.
Check the Abrasive before starting of the Blasting
Check the Ambient Temperature (wet / dry) before the commence of work
Check the Dew Point and Relative Humidity
Check the blast cleaned surface visually
Check and record Anchor Profile
3) EMPLOYER : PRIME 4 INSPECTION DUBAI UAE
PROJECT : EMAL (EMIRATES ALUMINUM) POWER PLANT
DESIGNATION : QA/QC INSPECTOR PAINTING/ COATING
DURATION : 12 MAY 2009 TO 22 AUG 2009
Responsibilities:
Carry out inspection on a timely basis.
Inspection of surface preparation and application,
Documentation works,
Monitoring weather conditions.
Preparation of Final Painting Reports, as directed and specified as contractor (under contractor)
Handling workforce and equipments for mechanical fabrications including Painting and Blasting & Insulation works.
Getting work schedules from Engineering Department.
Arranging manpower and equipments for the ongoing work and also Inspection of equipments using for Painting and Blasting activities.
Inspection of all materials using for Insulation , Blasting , Painting and related works as per Inspection check list and also reviewing the Manufacturer Material Technical & Safety Data Sheets(Verification of Materials documentation & Visual Receiving Inspection ) .
Instructing persons regarding safety regulations and operation of equipments.
Performing activities according to ITP and specification
4 Employer : GALFAR ENG. & CONTRACTING SAOG OMAN
Designation : QC Inspector (Painting/Coating)
Duration : December 2008 to APRIL 2009
Responsibilities:
To follow ITP and carry out inspection on a timely basis.
Final Inspection of Surface preparation and Application Documentation, Monitoring weather specified conditions.
Preparation of Final Painting Reports for test packs.
Worked for PIPELINE projects SRDC gas (DSS 16” and 20” dia) and many other project in off plot delivery contract in different location in Oman
Surface preparation inspection
Conducting salt test on surfaces
Monitoring mixing of paints
Maintaining batch certificates for incoming materials for painting
Maintaining test certificates for paints
Reviewing of paint schemes
Monitoring painting activities
Measuring dry film thicknesses using DFT gauges
Conducting holiday test on painted surfaces
Maintaining record for all stages
Preparing stage wise reports
Capable to handle DFT gauge. Holiday testing equipment, PIG guage.
Assess condition of substrate
Check the correct material have been received for the use
Check proper storage of coatings as per manufacturer’s data sheet.
Check the Abrasive before starting of the Blasting
Check the Ambient Temperature (wet / dry) before the commence of work
Check the Dew Point and Relative Humidity
Check the blast cleaned surface visually
Check and record Anchor Profile
5. Employer : BPCL (UNDER CONTRACT) AK CONTRACTOR BAK NIA M.P..
Designation : QC Inspector (Painting/Coating)
Duration : December 2004 to November 2008
Responsibilities:
2. Carry out inspection on a timely basis.
3. Inspection of surface preparation and application,
4. Documentation works,
5. Monitoring weather conditions.
6. Preparation of Final Painting Reports, as directed and specified as contractor (under contractor)
7. Handling workforce and equipments for mechanical fabrications including Painting and Blasting & Insulation works.
8. Getting work schedules from Engineering Department .
9. Arranging manpower and equipments for the ongoing work and also Inspection of equipments using for Painting and Blasting activities.
10. Inspection of all materials using for Insulation , Blasting , Painting and related works as per Inspection check list and also reviewing the Manufacturer Material Technical & Safety Data Sheets(Verification of Materials documentation & Visual Receiving Inspection ) .
11. Instructing persons regarding safety regulations and operation of equipments .
12. Conducting Qualification test for Insulators, Abrasive Blasters & Paint/ Coating applicators and also for Crew Supervisors .
13. Inspection of all Coating & Insulation works as per Project Standards/Specification with Client Representative.
14. Checking and Monitoring Relative Humidity ,Dew point , Air temperature and steel temperature (Ambient Conditions ) ,WFT and DFT .
15. Conducting Adhesion test, Curing test, Impact test, Contamination test, Holiday and Pinhole tests in buried pipe lines & Inside the Tanks with Client representative.
16. Instructing the sub contractor regarding the Insulation & Painting material handling & disposal meets site and project safety manual minimum requirements.
17. Conducting tool box meeting regarding Quality & also safety ,Fire prevention at work site includes flammable materials storage away from ignition sources & welding (Hot work) and also aware the people about good house keeping .
18. Monitoring and Inspecting all the Insulation activities such as Pre application (Inspection of surface prior to Insulation), Inspection of In process application, Installation of Vapor Barrier, Hot Insulation , Acoustic Insulation and Inspection of Weather Protection (Cladding ).
19. Inspection of Site Storage ,Handling & Installation of Cold Shoes on the pipe which required Insulation as per Vendors Requirements and Procedures.
6. Employer : CRAFT PETROLEUM ENG. Bhopal {M.P.}, INDIA
Designation : QC Inspector (Coating/Painting)
Duration : February 2000 to November 2004
Responsibilities:
Carry out inspection on a timely basis.
Final Inspection
Preparation of Final Painting Reports,
Documentation works, monitoring weather conditions.
Working as a Coating Supervisor cum QC inspector for maintenance coating
Estimation and procurement of Painting materials requirement
Estimation of total Manpower based on total work content of the project
Monitored Surface preparation with Hand tools, Power tools, Solvent cleaning and Garnet blasting of Tanks and Vessels based on specification requirement
Monitoring of coating and Painting activities of Tanks and Vessels based on specification requirement
Preparing Daily and monthly work progress report
IMRAN UR REHMAN
QA/QC PAINTING/COATING
NACE CIP LEVEL – 2 MARINE CERTIFIED