JOHN J. MASTROPIETRO
ALLEN PARK,MI. 48101
**********@*****.***
HOME:313-***-****
SKILL SUMMARY:
• 26 plus years of Automotive Engineering Design experience.
• Over 15 years of experience with three-dimensional parametric modeling
using PDGS,SDRC, Catia V5 & UG NX7
• 15 years of specialized courses through the Ford Motor Co. development
program. i.e Design for Manufacturing, Design for Assemblies. & GD&T
• Engine component design & packaging under hood – Intake Manifolds,
Throttle body, Wiper Systems, Climate control, Fuel senders.
• Chassis component Design – Brake & Fuel Lines, Frame design both
Light & Heavy Truck.
• Seating
• Die Design & Automation
• Checking & Release of Supplier prints to Ford.
• Blow Mold & Injection Mold Design i.e.- Washer Reservoirs
EDUCATION:
Associate of Science: Henry Ford Community College, Dearborn, Mi
Major Drafting Technology 1974
Certificates & Training:
VisMockup, Manufacturing Methods, Injection & Blow Molding,
Design For Manufacturing, Design for Assembly, Materials Specifications,
Catia V5, Descriptive Geometry, Tolerance stack-up analysis,
Teamcenter Engineering, Casting Design, GD&T, RCO Plastic Workshop
EMPLOYMENT EXPERIENCE:
UNRELATED JOBS
Designers helping Designers Macomb Community College 80 hrs August 2011
Downriver Clippers, Allen Park,Mi Brothers Business
Cutting lawns, Landscapes, Pavers & Patios April 2009-October 2010
GTECH STAFFING, Dearborn Mi. January 2012-March 2012
Roush Industries, Product Designer UG NX7 & Catia V5
Design & package for the GM VM Motors group. Design sheet metal components, AC hose
Routing. Created package layout for AC lines & mounting brackets.
FORD MOTOR COMPANY, Dearborn, Mi. January 2006-July 2008
Product Designer, Engine Modules Provided continuous engineering support in the
development, design and release of engine module components in coordination with other product programs to maximize packaging utilizing SDRC, Catia V5, Teamcenter, and Vismockup.
• Design and release of prototype composite intake manifolds for V8
Engines
• Issued direction for component requirements related to statements of work to the supply chain for quoting purposes to ensure design guidelines, standards and processes were followed.
• Coordinated with Climate Control for HVAC hose and plumbing routing,
• Conducted design reviews with cross functional teams including
suppliers, Manufacturing, Purchasing, and Engineering, resulting in
resolution of open issues.
VISTEON CORPORATION, Van Buren, Township,Mi June 2000-January 2006
Product Designer Checker, Air Induction Systems 2005-2006
Responsible for checking drawing for accuracy and corporate standards. Conducted analytical stack-ups of air metering components, including Electronic Throttle Bodies, Spacer Assemblies, Prioritized checking resources and managed multiple programs. Supported Quality and Warranty disciplines where required.
• Conducted packaging studies resulting in material reductions and cost saving to components.
• Coordinated prepared and reviewed packages for third party contract drawing
services
• Led design reviews comprised of cross-functional teams.
VISTEON CORPORATION, (CONTINUED)
Product Designer, Air Induction Systems 2001-2006
Handled the design and release of the Air Induction components from prototype through production using sketcher based solid modeling techniques. Used GD&T and Stack-ups to create parts for manufacturing. Created product drawings in accordance with ASME Y14.5M and other applicable specifications and standards utilizing SDRC and C3P protocol. Maintained and developed large components assemblies.
• Involved in cost saving initiatives which resulting in the elimination of assembly processes.
• Worked with blow mold & injection molded Plastics.
FORD MOTOR COMPANY, Dearborn,Mi January 1994-June2000
Product Designer, Wiper Systems & Washer Reservoirs
Designed and packaged Wiper/Washer components from prototype through production. Used GD&T and Stack-ups to create parts for manufacturing. Created product drawings in accordance with ASME Y14.5M and other applicable specifications and standards utilizing SDRC and PDGS. Maintained and developed large components assemblies.
• Volunteered and served short term deployment to Koln, Germany to resolve the Focus Launch issues.
• Designed for both blow mold & injection molded plastics.
• Utilized GD&T, assembly and part stack-up for ease of assembly and manufacturing.
LIVERNOIS ENGINEERING, Dearborn, Mi July 1980-January 1994
Designer/Detailer, Light Truck Program
Designed and routed fuel and brake lines through frame assemblies. Worked with Climate control group.
• Initial PDGS user, helped coordinate drafting Department conversion to
cad
• Became a Group Leader for the in-house Ford Light Truck design group.